Completed No litigation declared Residential / Group Housing project

AVENUE WING A

By Dharmesh Constructions Private Limited

RG-MH-20744 · RERA P51800002030 · Last updated on MahaRERA portal: 10 Apr 2024

Source: official MahaRERA filing

Red flags

  • 15 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 97%
15Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

AVENUE WING A is a Residential / Group Housing project by Dharmesh Constructions Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002030 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 15 complaints are on record with the regulator.

At a glance

Project

  • NameAVENUE WING A
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002030
  • ReraGenie IDRG-MH-20744

Builder

  • NameDharmesh Constructions Private Limited
  • Entity typeCompany
  • ChairpersonMunish Pravin Doshi
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA310000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

WING A: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.64%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.26%

Progress on shared amenities19

As on 10 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes45%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
2 Level podiumYes100%
AmenitiesYes0%
External PodiumYes32%
StiltYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area740 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI17065.94
Proposed, not sanctioned17,066 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANGA JAMUNA APTS, GR FLOOR, OPP SHOPPERS STOP, S V ROAD, ANDHERI WEST, MUMBAI - 400058

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.MUKESH BAHADUR of Consultants combined
ArchitectMr.RAJESH ATHA
EngineerSACPL, Mr Nikhil Sanghvi
PartnerRole in project
Dharmesh Constructions Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800003845Dec 2019 → Dec 2020

Reason as filed by the promoter• 29 Months Delay - We applied for Plot Demarcation on 27/09/2016 and received it finally on 12/02/2019 from Approving Authority. • 14 Months Delay Till Date - 24 slum tenants had refused to vacate the plot and we had to go to Court to vacate them as per 33(38) provision of Slum Act which is to vacate their respective premises for the purpose of demolition so that further work for the project can commence, hence we have initiated 33(38) proceedings in SRA on 23/10/2018 and obtained order against few non-cooperating members on 13/03/2019. • 13 Months Delay Till Date - Under DCPR 2034 and new DP

Litigation declared1

CaseCourtStatus
68 of 2016/2016Consumer Court State CommissionPending

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC006000000056989Mrs. Neevedita Dias and Baptist DiasDHARMESH CONSTRUCTIONS PVT LTD20/11/2018
CC006000000196729Hezikiah A. DesouzaDharmesh Constructions Pvt., Ltd.,16/04/2021
CC006000000193323SIDDHESH BHANDAREDharmesh constructions Pvt Ltd22/06/2020
CC006000000194751MANISH KARIAM/s Dharmesh Construction Private Limited31/10/2020
CC006000000193823Rashmi & Vishal NegandhiDharmesh Constructions Private Limited25/08/2020
CC006000000195002SANJIV SINGHDHARMESH CONSTRUCTIONS PVT LTD24/11/2020
CC006000000196718Rekha PatilDharmesh Construction Pvt Ltd19/04/2021
CC006000000198364Vandana ShahaniDharmesh Constructions Private Limited27/09/2021
CC006000000198429Sudeep Yogesh BaxiM/s. Dharmesh Constructions Private Limited22/09/2021
CC006000000199111Priti Kapoor SarafDharmesh Constructions Private Limited23/11/2021
CC006000000210170Sandeep Omprakash ChokhaniDharmesh Cnstruction Private Limiited25/02/2022
CC006000000220906MRS. MANJU S CHOKHANIM/S. DHARMESH CONSTRUCTION PRIVATE LIMITED22/04/2022
CC006000000241310Malleswara Rao MogadalaACME HOUSING29/05/2022
CC12503531dharmesh jayantilal paunDharmesh Constructions Private Limited03/10/2025
CC12602665MAMTA HEMANT SHETTYDharmesh Constructions Private Limited08/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Aug 2021

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Avenue-A Wing_Phase-1_compressed.pdf10 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: C C extended Sale both wings 26052023.pdf27 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf12 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: C C Revalidation Fees SRA ReceiotRs 9000 Date 08-09-2022.pdf14 Feb 2023
Proforma of Allotment letterFile: ALLOTMENT AVENUE A Wing.pdf5 Jan 2023
Building plan approvalFile: Sale Avenue - 01 (3).pdf3 Jan 2023
Building Plan Approval (IOD)File: Sale Avenue - 01 (3).pdf3 Jan 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate (Avenue Wing A).pdf3 Jan 2023
Proforma of Agreement for saleFile: PORFORMA FOR AFS.pdf31 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A (April-June).pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A (July-Sept).pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A(Oct-Dec).pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A(Jan-March).pdf27 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: DCPL.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: DHARMESH CONSTRUCTION FORM 5 DELAY LETTER.pdf29 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - Final Avenue Wing A.pdf1 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Acme Avenue Sale A wing Part OC.pdf17 Aug 2021
Details of encumbrancesFile: List of Encumbrances -Avenue Wing A.pdf5 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AVENUE WING A.pdf30 Sep 2020
Building plan approvalFile: ACME AVENUE Revised LOI 20-MAR-2020_Compressed.pdf11 Jun 2020
Building Plan Approval (IOD)File: ACME AVENUE Revised LOI 20-MAR-2020_Compressed.pdf11 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: 13-12-19 Avenue Further CC.pdf18 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: avenue wing a.pdf11 Dec 2019
Proforma of Allotment letterFile: Avenue-Awing-AFS.pdf15 Nov 2019
Certificates of CA (Form 5)File: avenue wing a.pdf30 Sep 2019
Certificates of CA (Form 5)File: avenue wing a.pdf30 Sep 2018
OtherFile: Affidavit Cum Self Declaration - Avenue Wing A.pdf5 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cert Avenue - Wing A.pdf26 Jul 2017
Certificates of CA (Form 3)File: CA Certificate - Avenue Wing A.pdf26 Jul 2017
Building plan approvalFile: scan409_Compressed-A.pdf25 Jul 2017
Building plan approvalFile: scan410_Compressed-A.pdf25 Jul 2017
Building plan approvalFile: scan414_Compressed.pdf25 Jul 2017
Building plan approvalFile: scan415_Compressed.pdf25 Jul 2017
Building plan approvalFile: scan417_Compressed-A.pdf25 Jul 2017
Building plan approvalFile: scan406_Compressed.pdf25 Jul 2017
Building plan approvalFile: scan407_Compressed.pdf25 Jul 2017
Building plan approvalFile: scan408_Compressed.pdf25 Jul 2017
Building plan approvalFile: scan403.pdf25 Jul 2017
Layout approvalFile: scan404.pdf25 Jul 2017
Building plan approvalFile: scan404_Compressed.pdf25 Jul 2017
Building plan approvalFile: scan405_Compressed.pdf25 Jul 2017
PAN CardFile: Dharmesh_PAN.pdf25 Jul 2017
Copy of the legal title reportFile: Acme Avenue Title Certificate.pdf25 Jul 2017
Details of encumbrancesFile: Acme Avenue Title Certificate.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: scan404.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan403.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan404_Compressed.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan405_Compressed.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan406_Compressed.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan407_Compressed.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan408_Compressed.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan409_Compressed-A.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan410_Compressed-A.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan414_Compressed.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan415_Compressed.pdf25 Jul 2017
Building Plan Approval (IOD)File: scan417_Compressed-A.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: ACME AVENUE CC SALE BLDG WING B DATE 23-JUN-2017.pdf25 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration - Avenue Wing A.pdf25 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 AVENUE WING A.pdf25 Jul 2017
Proforma of Allotment letterFile: Avenue Wing A AFS- Final Version-20th July 2017.pdf25 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVENUE WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmAVENUE WING ACompleted 111Lapsed / revoked 70Other 150Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: Dharmesh Constructions Private Limited

Dharmesh Constructions Private Limited has 6 registrations on MahaRERA, including AVENUE WING B and AVENUE WING A. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AVENUE WING A is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVENUE WING A?

The registered promoter entity is Dharmesh Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVENUE WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AVENUE WING A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AVENUE WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVENUE WING A?

The professionals named in the filing: Architect: Mr.MUKESH BAHADUR of Consultants combined; Architect: Mr.RAJESH ATHA; Engineer: SACPL, Mr Nikhil Sanghvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVENUE WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVENUE WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVENUE WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.