ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / AVENCIA

Registered No litigation declared Others project

AVENCIA

By ROYAL BUILDCON

RG-MH-17843 · RERA P52000055633 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 65%
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

AVENCIA is a Others project by ROYAL BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as P52000055633 on 5 Apr 2024. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameAVENCIA
  • TypeOthers
  • Location
    • MAHARASHTRA
    • PANVEL
    • Dapoli
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000055633
  • ReraGenie IDRG-MH-17843

Builder

  • NameROYAL BUILDCON
  • Entity typePartnership
  • GSTIN27ABAFR3966R1ZD
  • PartnersSANJAY ATMARAM PATEL, VINOD MANIBHAI PATEL, SANJAY KUMAR SHIV PRASAD SINGH, NARENDRA MANIBHAI PATEL, JITENDRA NARSHIBHAI PATEL, PANKAJ MANIBHAI PATEL, DEEP SANJAY PATEL, CHIRAG SANJAY SINGH, HITESH NARSINH PATEL, NITESH LAXMILAL SINGHAVI
  • Other registrations5 more →
  • Completed4 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVENCIANA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 65%.

AVENCIA: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered112

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,479 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Sep 2024
LandownerVillageDistrict
VINIT PRAFUL KAPUPARAThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI10009.42
Proposed, not sanctioned10,009 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUnit No 18 19 36, B Wing, Shree Nand Dham, Plot No 59, Sec 11, CBD Belapur Navi Mumbai, 400614, Maharashtra

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
ROYAL BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Avencia as on March 2026.pdf28 Apr 2026
Form 2File: Form 2 - Avencia as on March 2026.pdf28 Apr 2026
Form 3File: Form 3 - Avencia as on March 2026.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 Avencia as on March 2026.pdf28 Apr 2026
Form 1File: Destination Architect certificate .pdf20 Jan 2026
Form 2File: Agharkar consultant form2.pdf20 Jan 2026
Form 3File: Form 3 Avencia.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold-Booked inventory .pdf20 Jan 2026
Form 1File: Form 1 - Avencia (as on 30th september 2025).pdf16 Oct 2025
Form 2File: Form 2 - Avencia (as on 30th september 2025).pdf16 Oct 2025
Form 3File: Form 3 - Avencia (as on 30th september 2025).pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Avencia (as on 30th september 2025).pdf16 Oct 2025
Form 1File: Form 1 - Avencia as on June 2025.pdf23 Jul 2025
Form 2File: Form 2 - Avencia as on June 2025.pdf23 Jul 2025
Form 3File: Form 3 - Avencia as on June 2025.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Avencia as on June 2025.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avencia - Jan to March 2025.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Avencia - Jan to March 2025.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avencia (Dec 2024).pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avencia (Dec 2024).pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avencia (Dec 2024).pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Cir 29 - Sept 2024.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Cir 29 - Sept 2024.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avencia March 2024.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avencia June.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avencia September.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avencia as on March 2024 (1).pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avencia as on June 2024 (1).pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avencia as on Sep 2024 (1).pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Avencia March 2024.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Avencia June 2024.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Avencia September 2024.pdf5 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: cc MAIL AVENCIA.pdf7 Mar 2024
Declaration in FORM BFile: fORM-B AVENCIA.pdf7 Mar 2024
Proforma of Agreement for saleFile: dREAFT SALE AVENCIA_compressed-1-12.pdf7 Mar 2024
Proforma of Agreement for saleFile: dREAFT SALE AVENCIA_compressed-13-24.pdf7 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: dECLARATION BANK AVENCIA.pdf7 Mar 2024
Layout approvalFile: CC DWG-1.pdf2 Mar 2024
Building plan approvalFile: CC DWG-2.pdf2 Mar 2024
Building plan approvalFile: CC DWG-3.pdf2 Mar 2024
Building plan approvalFile: CC DWG-3.pdf2 Mar 2024
Building plan approvalFile: CC DWG-4.pdf2 Mar 2024
Building plan approvalFile: CC DWG-5.pdf2 Mar 2024
Building plan approvalFile: CC DWG-6.pdf2 Mar 2024
Copy of Layout Approval (in case of layout)File: CC DWG-1.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DWG-2.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DWG-3.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DWG-3.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DWG-4.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DWG-5.pdf2 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: CC DWG-6.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NEW RERA Plot 04 Sec 05 Pushpak FORM -2 FINAL.pdf2 Mar 2024
CERSAI detailsFile: Declaration about Security Interest.pdf2 Mar 2024
Proforma of Allotment letterFile: 1 Proforma of Agreement for sale (6).pdf2 Mar 2024
Other - LegalFile: Cidco Aggrement-1-12.pdf2 Mar 2024
Other - LegalFile: Cidco Aggrement-13-25.pdf2 Mar 2024
Copy of the legal title reportFile: Title Report.pdf1 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances concerned to FINANCE.pdf1 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances concerned to LEGAL.pdf1 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumbrances concerned to FINANCE.pdf1 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumbrances concerned to LEGAL.pdf1 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf1 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Chirag Singh.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Deep Patel.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Hiteshkumar Patel.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Jitendra Patel.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Narendra Patel.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Nitesh Singhvi.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Pankaj Patel.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sanjay Patel.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sanjaykumar Singh.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Vinit Kapupara.pdf1 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Vinod Patel.pdf1 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation Report- Draft Allotement Letter.pdf1 Mar 2024

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVENCIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

Builder: ROYAL BUILDCON

Royal Buildcon has 6 registrations on MahaRERA, including Royal Garden Phase I and BILIPATRA APARTMENT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if AVENCIA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVENCIA?

The registered promoter entity is ROYAL BUILDCON, a partnership as per the filing. Its GSTIN 27ABAFR3966R1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVENCIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AVENCIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in AVENCIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVENCIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVENCIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.