Home / Browse projects / Pune, Maharashtra / AVASA WOODLAND
AVASA WOODLAND
By NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD
RG-MH-42183 · RERA P52100054049 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AVASA WOODLAND is a Plotted project by NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD in Pune, Maharashtra, registered with MahaRERA as P52100054049 on 27 Dec 2023. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 0 of the 56 units on this registration are recorded sold or booked.
At a glance
Project
- NameAVASA WOODLAND
- TypePlotted
- Location
- CHAKAN TALEGAON ROAD
- MAHALUNGE
- Khed
- Pune
- 410501
- Pincode410501
- RERA no.P52100054049
- ReraGenie IDRG-MH-42183
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Dec 2023
- Promised completion30 Dec 2025
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed92 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G H NAIKNAVARE |
| Engineer | SUNIL MULIK |
| Chartered Accountant | PRAG & COMPANY |
| Chartered Accountant | KKSS AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: AVASA WOODLAND FORM 1.pdf | 20 Jan 2026 |
| Form 2File: AVASA WOODLAND FORM 2.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: AVASA WOODLAND SOLD UNSOLD.pdf | 20 Jan 2026 |
| Form 3File: AVASA WOODLAND FORM 3DEC25.PDF | 20 Jan 2026 |
| Form 5 (FY 2024-2025)File: Avasa Woodland_Certificate.pdf | 2 Dec 2025 |
| Form 1File: Avasa Wood Land form 1.pdf | 18 Oct 2025 |
| Form 2File: AVASA WOODLAND FORM 2.pdf | 18 Oct 2025 |
| Form 3File: AVASA WOOD LAND FORM3.pdf | 18 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: AVASA WOODLAND SOLD UNSOLD.pdf | 18 Oct 2025 |
| Form 1File: AVASA WOODLAND FORM 1.pdf | 19 Jul 2025 |
| Form 2File: AVASA WOODLAND FORM 2.pdf | 19 Jul 2025 |
| Form 3File: Avasa Woodland Form 3.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Avasa Woodland Sold unsold.pdf | 19 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: AVASA WOODLAND SELF DECLARATION.pdf | 19 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Avasa Woodland - Sold Booked Inventory.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avasawoodland.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Woodland.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa Woodland.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Woodland.pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA WOODLAND MERGE_compressed.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AVASA WOODLAND.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: avasa woodand.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA WOODLAND.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: AVASA WOODLAND.pdf | 8 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate woodland.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA WOOD LAND_compressed.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Awasa Woodland Form 3 Sept 24.pdf | 24 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa woodland.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Woodland.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avasa Woodland.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA WOODLAND.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA WOODLAND_compressed.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA WOODLAND.pdf | 10 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: AVASA WOODLAND.pdf | 10 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: AVASA WOODLAND.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA WOODLAND.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA WOODLAND.pdf | 6 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa woodland.pdf | 3 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa wood land RERA - (2)_compressed.pdf | 13 May 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA WOODLAND.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA WOOD LAND FINAL.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Woodland.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Woodland Rera - Jan-March 2024.pdf | 2 Apr 2024 |
| Layout approvalFile: Sanction Lay Out Plan no 1 woodland.pdf | 8 Jan 2024 |
| Layout approvalFile: Sanction Plan no 3 woodland.pdf | 8 Jan 2024 |
| Layout approvalFile: Sanction Plan no 5 woodland.pdf | 8 Jan 2024 |
| Layout approvalFile: Sanction Plan no 6 woodland.pdf | 8 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Lay Out Plan no 1 woodland.pdf | 8 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan no 3 woodland.pdf | 8 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan no 5 woodland.pdf | 8 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan no 6 woodland.pdf | 8 Jan 2024 |
| Copy of the legal title reportFile: 2023 TR- RERA.pdf | 22 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LETTER 1C.pdf | 5 Dec 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE LETTER 1C.pdf | 5 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates NA Order for plotted development.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 88 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 91 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 92 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 95 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 96 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 97 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 113 2 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 122 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 123 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 124 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 125 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 126 1 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 127 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 128 1 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 128 2 Satbara.pdf | 5 Dec 2023 |
| Other - LegalFile: महाळुंगे 128 3 Satbara.pdf | 5 Dec 2023 |
| Layout approvalFile: Sanction Plan No 3.pdf | 24 Nov 2023 |
| Layout approvalFile: Sanction Plan No 5.pdf | 24 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan No 3.pdf | 24 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan No 5.pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 24 Nov 2023 |
| Declaration about Commencement CertificateFile: PLOT 1C AVASA WOOD LAND declaration of commecement certificate.pdf | 22 Nov 2023 |
| Layout approvalFile: Sanction Lay Out No 1 FOR PLOT 1C.pdf | 21 Nov 2023 |
| Building plan approval or NA orderFile: Sanction Plan No 6 PLOT 1C.pdf | 21 Nov 2023 |
| PAN CardFile: NHDPL PAN.pdf | 21 Nov 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DWARKA | GAT NO 128-1 128-2 MAHALUNGE CHAKAN TAL KHED DIST PUNE | 496 | Completed | Sep 2013 | Late, Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AVASA WOODLAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHALUNGE13,700+ in Pune
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD
NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD has 2 registrations on MahaRERA, including AVASA WOODLAND and AVASA PARKLAND. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that AVASA WOODLAND shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AVASA WOODLAND is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AVASA WOODLAND?
The registered promoter entity is NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AVASA WOODLAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AVASA WOODLAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AVASA WOODLAND?
The professionals named in the filing: Architect: G H NAIKNAVARE; Engineer: SUNIL MULIK; Chartered Accountant: PRAG & COMPANY; Chartered Accountant: KKSS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AVASA WOODLAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback