Home / Browse projects / Pune, Maharashtra / AVASA PARKLAND
AVASA PARKLAND
By NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD
RG-MH-40112 · RERA P52100054938 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AVASA PARKLAND is a Plotted project by NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD in Pune, Maharashtra, registered with MahaRERA as P52100054938 on 21 Feb 2024. The registration is recorded completed; possession was promised by 30 Dec 2025. The completion date has moved by 12 months from the original filing. 0 of the 34 units on this registration are recorded sold or booked.
At a glance
Project
- NameAVASA PARKLAND
- TypePlotted
- Location
- CHAKAN TALEGAON ROAD
- MAHALUNGE
- Khed
- Pune
- 410501
- Pincode410501
- RERA no.P52100054938
- ReraGenie IDRG-MH-40112
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Feb 2024
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2024)
- BuildingsNot stated in filing
- Documents filed115 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 15% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G H NAIKNAVARE |
| Engineer | SUNIL MULIK |
| Chartered Accountant | PRAG AND CO |
| Chartered Accountant | KKSS AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo, MahaRERA, Mumbai Subject: Application for Extension of Registration for Avasa Parkland (MahaRERA Registration No. P52100054938) Respected Sir/Madam, We, Naiknavare Housing Development Pvt. Ltd., the promoters of Avasa Parkland, a plotted layout project registered under MahaRERA Registration No. P52100054938, respectfully submit this application for an extension of the project registration. The project was initially registered with a completion date of 30th December 2024. However, due to unavoidable delays, we could not complete the remaining work within the stipulated timeline. Accordingly
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Dec 2025
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: AVASA PARKLAND FORM 1.pdf | 20 Jan 2026 |
| Form 2File: AVASA PARKLAND FORM 2.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: AVASA PARKLAND SOLD UNSOLD.pdf | 20 Jan 2026 |
| Form 3File: AVASA PARK LAND DEC 25.PDF | 20 Jan 2026 |
| Completion CertificateFile: ilovepdf_merged.pdf | 30 Dec 2025 |
| Form 5 (FY 2024-2025)File: Avasa Parkland_certificate.pdf | 2 Dec 2025 |
| Form 1File: Avasa Parkland form 1.pdf | 18 Oct 2025 |
| Form 2File: AVASA PARKLAND FORM 2.pdf | 18 Oct 2025 |
| Form 3File: AWASA PARK LAND FORM 3.pdf | 18 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: AVASA PARKLAND SOLD UNSOLD.pdf | 18 Oct 2025 |
| Form 1File: AVASA PARKLAND FORM 1.pdf | 19 Jul 2025 |
| Form 2File: AVASA PARKLAND FORM 2.pdf | 19 Jul 2025 |
| Form 3File: Avasa Parkland Form 3.pdf | 19 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: AVASA PARKLAND SELF DECLARATION.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: avasa parkland sold unsold.pdf | 19 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Avasa Parkland - Sold Booked Inventory.pdf | 25 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasas Parklan.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avasa Parkland.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Parkland.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Parkland.pdf | 9 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Revised (2).pdf | 13 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Avasa Park Land form 5.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: PARKLAND SOLD UNSOLD.pdf | 12 Feb 2025 |
| Declaration in FORM BFile: Avasa Parkland Form B.pdf | 28 Jan 2025 |
| CERSAI detailsFile: park land undertaking (1).pdf | 28 Jan 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Avasa park land form A.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA PARK LAND MERGE_compressed.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AVASA PARKLAND.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: avasa parkland.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA PARKLAND.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: AVASA PARKLAND.pdf | 8 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certificate avasa parkland.pdf | 15 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: avasa park land8_merged_compressed (1).pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Parkland.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avasa Parkland.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA PARKLAND.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa pARK lAND mERGED_compressed.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Park Land compressed.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA PARKLAND.pdf | 10 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: AVASA PARKLAND.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA PARKLAND.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA PARKLAND.pdf | 6 Jul 2024 |
| Layout approvalFile: Sanction Lay Out Plan no 1_11zon.pdf | 4 Jul 2024 |
| Layout approvalFile: Sanction Plan no 3_11zon.pdf | 4 Jul 2024 |
| Layout approvalFile: Sanction Plan no 5_11zon.pdf | 4 Jul 2024 |
| Layout approvalFile: Sanction Plan no 6_11zon (1).pdf | 4 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Lay Out Plan no 1_11zon.pdf | 4 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan no 3_11zon.pdf | 4 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan no 5_11zon.pdf | 4 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan no 6_11zon (1).pdf | 4 Jul 2024 |
| Other - LegalFile: महाळुंगे 91 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 92 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 95 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 96 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 97 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 113 2 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 122 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 123 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 124 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 125 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 126 1 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 127 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 128 1 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 128 2 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: महाळुंगे 128 3 Satbara.pdf | 20 Feb 2024 |
| Other - LegalFile: 7_20220525174439.pdf | 20 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: AVASAPARK LAND DECLERATION.pdf | 20 Jan 2024 |
| Details of encumbrances concerned to LegalFile: AVASAPARK LAND DECLERATION.pdf | 20 Jan 2024 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Park Land final_compressed.pdf | 19 Jan 2024 |
| Other - LegalFile: महाळुंगे 88 Satbara.pdf | 18 Jan 2024 |
| Building plan approval or NA orderFile: Sanction Lay Out No 1 [605x1275] PARK LAND COMPRESSED.pdf | 2 Jan 2024 |
| Building plan approval or NA orderFile: Sanction Plan No 3 [605x905] 02 park land compressed.pdf | 2 Jan 2024 |
| Building plan approval or NA orderFile: Sanction Plan No 5 [ 605x905] PARK LAND01 compressed.pdf | 2 Jan 2024 |
| Building plan approval or NA orderFile: Sanction Plan No 6 [605x405] PARK LAND 06-compressed (1).pdf | 2 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Lay Out No 1 [605x1275] PARK LAND COMPRESSED.pdf | 2 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan No 3 [605x905] 02 park land compressed.pdf | 2 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan No 5 [ 605x905] PARK LAND01 compressed.pdf | 2 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan No 6 [605x405] PARK LAND 06-compressed (1).pdf | 2 Jan 2024 |
| Other - TechnicalFile: GetUserDocumentFileContent.pdf | 2 Jan 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DWARKA | MAHALUNGE CHAKAN TAL DIST PUNE | 496 | Completed | Sep 2013 | Late, Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
Keep AVASA PARKLAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHALUNGE13,700+ in Pune
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD
NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD has 2 registrations on MahaRERA, including AVASA WOODLAND and AVASA PARKLAND. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AVASA PARKLAND is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AVASA PARKLAND?
The registered promoter entity is NAIKNAVARE HOUSING DEVELOPMENT PVT.LTD, a company as per the filing. Its CIN U45202PN2007PTC129973 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AVASA PARKLAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AVASA PARKLAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AVASA PARKLAND?
The professionals named in the filing: Architect: G H NAIKNAVARE; Engineer: SUNIL MULIK; Chartered Accountant: PRAG AND CO; Chartered Accountant: KKSS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AVASA PARKLAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback