AVASA GROVELAND
By NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD
RG-MH-47596 · RERA P52100053389 · Last updated on MahaRERA portal: 25 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AVASA GROVELAND is a Plotted project by NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100053389 on 27 Oct 2023. Possession was promised by 31 Dec 2024 and is now 22 months past that date. 0 of the 37 units on this registration are recorded sold or booked.
At a glance
Project
- NameAVASA GROVELAND
- TypePlotted
- Location
- CHAKAN TALEGAON DABHADE ROAD
- MAHALUNGE
- Khed
- Pune
- 410501
- Pincode410501
- RERA no.P52100053389
- ReraGenie IDRG-MH-47596
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Oct 2023
- Promised completion31 Dec 2024
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed70 files
Current status
Figures as on 25 Apr 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAURI H NAIKNAVARE |
| Engineer | SUNIL MULIK |
| Chartered Accountant | SHRISHRIMAL AND ASSOCIATE |
| Chartered Accountant | KKSS AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Jan 2025
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: Avasa Groveland - Sold Booked Inventory.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avasa Groveland.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Groveland.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa Groveland.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Groveland.pdf | 8 Apr 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: AAA 1_20241231141338.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: aVASA GROVELAND MERGE_compressed.pdf | 18 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AVASA GROVELAND.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: avasa groveland.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA GROVELAND.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: AVASA GROVELAND.pdf | 8 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: AVASA GROVELAND FORM 4.pdf | 3 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AVASA GROVELAND ARCHITECT CERTIFICATE.pdf | 3 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC _20240313135003.pdf | 3 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Gmail Villag Mahalunge Tal Khed Dist Pune S No 88 P and Other File No 753 23 24 7252 on 28 | 3 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AVASA GRASSLAND GROVELAND WOODLAND PMRDA LETTER.pdf | 3 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: AVASA GROVELAND FORM 4.pdf | 2 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: certificate groveland 23-24.pdf | 6 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA GROVE LAND FORM3.pdf | 21 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa Groveland.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avasa Groveland.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avasa Groveland.pdf | 14 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA GROVELAND.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: avasa groveland merged_compressed.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Groveland Form 3.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA GROVELAND.pdf | 10 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: AVASA GROVELAND.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA GROVELAND.pdf | 6 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA GROVELAND.pdf | 6 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Avasa groveland.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVSA GROVE LAND.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVASA GROVELAND.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: AVASA GROVELAND.pdf | 6 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avasa Groveland.pdf | 4 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Groveland Rera-Jan-March2024.pdf | 2 Apr 2024 |
| Other - TechnicalFile: 2D Grooveland.pdf | 2 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avasa Grove Land -Final_compressed.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avasa Groveland.pdf | 8 Jan 2024 |
| Layout approvalFile: Sanction Lay Out Plan no 1 GROVELAND.pdf | 6 Jan 2024 |
| Layout approvalFile: Sanction Plan no 6 GROVELAND.pdf | 6 Jan 2024 |
| Building plan approval or NA orderFile: Sanction Lay Out Plan no 1 GROVELAND.pdf | 6 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Lay Out Plan no 1 GROVELAND.pdf | 6 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan no 6 GROVELAND.pdf | 6 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Lay Out Plan no 1 GROVELAND.pdf | 6 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 20240106202843.pdf | 6 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVASA GROVELAND.pdf | 2 Jan 2024 |
| CERSAI detailsFile: AVASA GROVELAND CERSAI 171023.pdf | 17 Oct 2023 |
| Declaration about Commencement CertificateFile: Format D - PLOT 2D DWARKA.pdf | 30 Sep 2023 |
| Copy of the legal title reportFile: Revised TSR Adv Ganesh Phadtare.pdf | 21 Sep 2023 |
| Copy of the legal title reportFile: Allotment Letter Groveland.pdf | 21 Sep 2023 |
| Other - LegalFile: Deviations in Allotment Letter.pdf | 21 Sep 2023 |
| Other - LegalFile: Allotment Letter Groveland.pdf | 21 Sep 2023 |
| Declaration about Commencement CertificateFile: DWARKA 2D.pdf | 15 Sep 2023 |
| Layout approvalFile: layout compressed.pdf | 13 Sep 2023 |
| Building plan approval or NA orderFile: statement compressed.pdf | 13 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: layout compressed.pdf | 13 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: statement compressed.pdf | 13 Sep 2023 |
| Declaration in FORM BFile: Avasa Groveland form B-compressed.pdf | 2 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Avasa groveland discloser in other real estate.pdf | 2 Sep 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: AVASA GROVELAND DISCLOSER OF INTEREST IN OTHER REAL ESTATE.pdf | 2 Sep 2023 |
| Proforma of Agreement for saleFile: ATS Dwaraka Grooveland RDN Changes.pdf | 2 Sep 2023 |
| Proforma of Allotment letterFile: Allotment Letter (1).pdf | 2 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: Deviations in Allotment Letter.pdf | 2 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviations to ATS-compressed.pdf | 2 Sep 2023 |
| PAN CardFile: NHDPL PAN.pdf | 17 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: financial undertaking.pdf | 17 Aug 2023 |
| Details of encumbrances concerned to LegalFile: financial undertaking.pdf | 17 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 17 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AVASA GROVELAND FORM3_compressed.pdf | 17 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Separate Bank Account.pdf | 17 Aug 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DWARKA | GAT NO. 128-1 128-2 MAHALUNGE CHAKAN TAL - KHED DIST - PUNE | 496 | Completed | Sep 2013 | Late, Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep AVASA GROVELAND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAHALUNGE13,700+ in Pune
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
SARA NILAAY
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C3
JAGRUTSARA STRUCTURES LLP
SARA CITY TOWER C2
JAGRUTSARA STRUCTURES LLP
SARA SWAPNODAY
Jagrutsara Structures LLP
Aapla Ghar Moshi Annex Phase I
Maple Shelters Pvt. Ltd.
Builder: NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD
NAIKNAVARE HOUSING DEVELOPMENTS PVT. LTD. has 4 registrations on MahaRERA, including AVASAGRASSLAND and AVASA GROVELAND. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that AVASA GROVELAND shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AVASA GROVELAND is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AVASA GROVELAND?
The registered promoter entity is NAIKNAVARE HOUSING DEVELOPMENTS PVT LTD, a company as per the filing. Its CIN U45202PN2007PTC129973 and GSTIN 27AACCN5200A1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AVASA GROVELAND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AVASA GROVELAND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AVASA GROVELAND?
The professionals named in the filing: Architect: GAURI H NAIKNAVARE; Engineer: SUNIL MULIK; Chartered Accountant: SHRISHRIMAL AND ASSOCIATE; Chartered Accountant: KKSS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AVASA GROVELAND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback