Home / Browse projects / Nagpur, Maharashtra / Avanti LAyout
Avanti LAyout
RG-MH-03534 · RERA P50500027731 · Last updated on MahaRERA portal: 11 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Avanti LAyout is a Plotted project by GAAIMS DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500027731 on 3 Jan 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 25 of the 148 units on this registration are recorded sold or booked.
At a glance
Project
- NameAvanti LAyout
- TypePlotted
- Location
- Kh. No. 67
- P.H. No. 78
- Mouza - Takalghat
- Mouza - Hingna Distt. - Nagpur
- Takalghat
- Hingna
- Nagpur
- Takalghat (CT)
- Hingna
- Nagpur
- 441122
- Pincode441122
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500027731
- ReraGenie IDRG-MH-03534
Builder
- NameGAAIMS DEVELOPERS
- Entity typePartnership
- PartnersGajanan Khushalrao Datir, Gajanan Khushalrao Datir
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Jan 2021
- Promised completion30 Jun 2026
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed115 files
Current status
Figures as on 11 Nov 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 11 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 75% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 3.30 cr | Rs 3.86 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sachin Diwtelwar |
| Engineer | Anand Churad |
| Engineer | Sunraj Shende |
| Chartered Accountant | Rishi Lashkare Lashkare |
| Chartered Accountant | Ravindra Lashkare |
| Partner | Role in project |
|---|---|
| GAAIMS DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2020-2021)File: 2020-21.pdf | 11 Nov 2025 |
| Form 2A (FY 2021-2022)File: 2021-22.pdf | 11 Nov 2025 |
| Form 2A (FY 2024-2025)File: 2024-25.pdf | 11 Nov 2025 |
| Form 2A (FY 2023-2024)File: 2023-24.pdf | 11 Nov 2025 |
| Form 2A (FY 2022-2023)File: 2022-2023.pdf | 11 Nov 2025 |
| Form 1File: Avanti Layout Form1 March 2025.pdf | 16 Oct 2025 |
| Form 2File: Avanti Layout - Form 2 - March 2025.pdf | 16 Oct 2025 |
| Form 3File: Avanti Layout Form 3 March 2025_compressed.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Avanti Layout Disclousre March 2025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 - Arch Certificate - Dec 2023.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: Avanti Layout Form1 Sept 2025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Avanti Layout Form 2 June 2025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Avanti Layout - Form 2 - Sept 2025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Avanti Layout Form 3 June 2025_compressed.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Avanti Layout Form 3 June 2025_compressed.pdf | 16 Oct 2025 |
| Form 5 (FY 2020-2021)File: Avanti Layout - Form 5 - 2021.pdf | 10 Oct 2025 |
| Form 5 (FY 2021-2022)File: Avanti Layout - Form 5 - 2021 - 2022.pdf | 10 Oct 2025 |
| Form 5 (FY 2022-2023)File: Avanti Layout - Form 5 - 2022-2023.pdf | 10 Oct 2025 |
| Form 5 (FY 2023-2024)File: Avanti Layout - Form 5 - 2023 - 2024.pdf | 10 Oct 2025 |
| Form 5 (FY 2024-2025)File: Avanti Layout - Form 5 - 2024 - 2025.pdf | 10 Oct 2025 |
| Form 1File: Architect - March 2023.pdf | 13 Sep 2025 |
| Form 2File: Engineer - March 2023.pdf | 13 Sep 2025 |
| Form 3File: CA Certificate - March 2023.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 2023.pdf | 13 Sep 2025 |
| Form 1File: Architect - June 2023.pdf | 13 Sep 2025 |
| Form 2File: Engineer - June 2023.pdf | 13 Sep 2025 |
| Form 3File: Ca Certificate - June 2023.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - June 2023.pdf | 13 Sep 2025 |
| Form 1File: Architect - Sept 2023.pdf | 13 Sep 2025 |
| Form 2File: Engineer - Sept 2023.pdf | 13 Sep 2025 |
| Form 3File: CA Certificate - Sept 2023_compressed (2).pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sept 2023.pdf | 13 Sep 2025 |
| Form 1File: FORM 1 - Arch Certificate - Dec 2023.pdf | 13 Sep 2025 |
| Form 2File: FORM 2 - Engineer Certificate - Dec 2023.pdf | 13 Sep 2025 |
| Form 3File: CA Certificate - Dec 2023_compressed (1).pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - Dec 2023.pdf | 13 Sep 2025 |
| Form 1File: Avanti Layout - Form 1 - March 2024.pdf | 13 Sep 2025 |
| Form 2File: Avanti Layout - Form 2 - March 2024.pdf | 13 Sep 2025 |
| Form 3File: Avanti Layout - Form 3 - March 2024_compressed.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Avanti Layout - Disclosure - March 2024.pdf | 13 Sep 2025 |
| Form 1File: Avanti Layout - Form 1 - June 2024.pdf | 13 Sep 2025 |
| Form 2File: Avanti Layout - Form 2 - June 2024.pdf | 13 Sep 2025 |
| Form 3File: Avanti Layout - Form 3 - June 2024_compressed.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Avanti Layout - Disclosure - June 2024.pdf | 13 Sep 2025 |
| Form 1File: Avanti Layout - Form 1 - September 2024.pdf | 13 Sep 2025 |
| Form 2File: Avanti Layout - Form 2 - September 2024.pdf | 13 Sep 2025 |
| Form 3File: Avanti Layout - Form 3 - September 2024_compressed.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Avanti Layout - Disclosure - September 2024.pdf | 13 Sep 2025 |
| Form 1File: Avanti Layout - Form 1 - December 2024.pdf | 13 Sep 2025 |
| Form 2File: Avanti Layout - Form 2 - December 2024.pdf | 13 Sep 2025 |
| Form 3File: Avanti Layout - Form 3 - December 2024_compressed.pdf | 13 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Avanti Layout - Disclosure - December 2024.pdf | 13 Sep 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avanti Layout - Form 2 - September 2024.pdf | 1 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avanti Layout - Form 2 - December 2024.pdf | 1 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avanti Layout - Form 1 - September 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avanti Layout - Form 1 - December 2024.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avanti Layout - Form 3 - September 2024_compressed.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avanti Layout - Form 3 - December 2024_compressed.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avanti Layout - Form 2 - September 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avanti Layout - Form 2 - December 2024.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Avanti Layout - Disclosure - September 2024.pdf | 28 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Avanti Layout - Disclosure - December 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avanti Layout - Form 1 - March 2024.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Avanti Layout - Form 1 - June 2024.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avanti Layout - Form 3 - March 2024_compressed.pdf | 7 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Avanti Layout - Form 3 - June 2024_compressed.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avanti Layout - Form 2 - March 2024.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avanti Layout - Form 2 - June 2024.pdf | 7 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Avanti Layout - Form 5 - 2020-21.pdf | 7 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Avanti Layout - Disclosure - March 2024.pdf | 7 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Avanti Layout - Disclosure - June 2024.pdf | 7 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Avanti Layout - Form 5 - 2021-22.pdf | 7 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Avanti Layout - Form 5 - 2022-23.pdf | 7 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Avanti Layout - Form 5 - 2023-24.pdf | 7 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Legal.pdf | 7 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Legal.pdf | 7 Mar 2024 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 7 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - March 2023.pdf | 7 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - June 2023.pdf | 7 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Sept 2023.pdf | 7 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Avanti LAyout on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Takalghat, Hingna, Nagpur2,800+ in Nagpur
Filed coordinates, straight-line distance. 37 registered projects within 2 km.
Rivershore Estate
Godrej Skyline Developers Ltd
Godrej Forest Estate
Dream World Landmarks LLP
Vrindavan Phase-3
Radha Madhav Developers
Kalpataru Ardene
Azure Tree Enviro Farms Private Limited
MAHALAXMI NAGAR-10
PADMALAXMI INFRTECH
VRINDAVAN PARK
TIRUPATI DEVELOPERS
See every Nagpur project, with the district possession charts
Builder: GAAIMS DEVELOPERS
GAAIMS DEVELOPERS has 1 registration on MahaRERA, including Avanti LAyout. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that Avanti LAyout shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Avanti LAyout is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Avanti LAyout?
The registered promoter entity is GAAIMS DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Avanti LAyout?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Avanti LAyout?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Avanti LAyout?
The professionals named in the filing: Architect: Sachin Diwtelwar; Engineer: Anand Churad; Engineer: Sunraj Shende; Chartered Accountant: Rishi Lashkare Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Avanti LAyout?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback