ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Avani Signature

Registered No litigation declared Commercial project

Avani Signature

By Avani Buildcon

RG-MH-43119 · RERA P51800045772 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 9 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
96 of 186Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Avani Signature is a Commercial project by Avani Buildcon in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045772 on 9 Jun 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 90 of the 186 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAvani Signature
  • TypeCommercial
  • Location
    • Junction of J.P Road and J.V Road
    • Ghatkopar Kirol
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800045772
  • ReraGenie IDRG-MH-43119

Builder

  • NameAvani Buildcon
  • Entity typePartnership
  • PartnersShri Krishna Devcon Limited, Sahil Sunil Sangoi, Home Regency Construction LLP
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2022First promiseMar 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed94 files

Current status

48%90 of 186 units booked
46.8%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Avani SignatureNA15120186186

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Avani Signature: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed131

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots131
Closed/Covered131

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,105 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI8521.64
Proposed, not sanctioned8,521 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Roopayatan Bldg,S.V.Road,Vile Parle,Bombay.400056
Estimated costRs 58.45 cr
Cost incurredRs 27.33 cr
Work done46.76%
BuildingWingEstimatedIncurred
Avani SignatureNARs 55.53 crRs 27.13 cr
-NARs 2.92 crRs 19.90 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKalpesh shah
EngineerSK consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantGaurav S Rajpal & Co
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
Avani Buildcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15012619460Mar 2026 → Dec 2026

Reason as filed by the promoterThe project “AVANI SIGNATURE” was registered with MahaRERA and its registration validity was granted in accordance with Section 5 of the Real Estate (Regulation and Development) Act, 2016, up to the presently approved completion date. The Promoter has been unable to complete the project within the stipulated period due to circumstances beyond its control. During the construction phase, the project was adversely impacted by unseasonal and exceptionally heavy rainfall, which significantly disrupted construction activities and site progress. Further, the construction of the parking tower, being a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Avani Signature June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Avani Signature June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Avani Signature June 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: form 1 Avani Signature 31st March 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2 Avani Signature 31st March 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: Form 3 Avani Signature 31st March 2026.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec 2025.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 - Avani Signature as on Dec 2025.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Dec 2025.pdf20 Apr 2026
Form 5 (FY 2023-2024)File: New Format Form 5 of Avani Signature FY 23-24 (2) (1).pdf20 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 of Avani Signature FY 24-25.pdf20 Apr 2026
Form 2File: Form 2 - Avani Signature as on June 2025.pdf15 Jan 2026
Form 3File: Form 3 Avani Signature 30th June 2025.pdf15 Jan 2026
Form 1File: Form 1 December 2025.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf15 Jan 2026
Form 1File: Form 1 December 2025.pdf15 Jan 2026
Form 2File: Form 2 30-9-2025.pdf15 Jan 2026
Form 3File: Form 3 30-09-2025.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf15 Jan 2026
Form 1File: Form 1 - Avani Signature as on December 2024.pdf29 Sep 2025
Form 2File: Form 2 - Avani Signature as on December 2024.pdf29 Sep 2025
Form 3File: Form 3 Avani Signature 31st December 2024.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Avani Signature as on December 2024.pdf29 Sep 2025
Form 1File: Form 1 - Avani Signature as on March 2025.pdf3 Sep 2025
Form 2File: Form 2 - Avani Signature as on March 2025.pdf3 Sep 2025
Form 3File: Form 3 - Avani Signature as on March 2025.pdf3 Sep 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 - Avani Signature as on March 2025.pdf3 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avani Signature 31st December 2024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Avani Signature as on December 2024.pdf18 Jan 2025
Layout approvalFile: Plan 1.pdf13 Jan 2025
Building plan approvalFile: Plan 2.pdf13 Jan 2025
Building plan approvalFile: Plan 3.pdf13 Jan 2025
Building plan approvalFile: Plan 4.pdf13 Jan 2025
Building plan approvalFile: Plan 5.pdf13 Jan 2025
Building plan approvalFile: Plan 6.pdf13 Jan 2025
Building plan approvalFile: Plan 7.pdf13 Jan 2025
Copy of Layout Approval (in case of layout)File: Plan 1.pdf13 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf13 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf13 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC - Avani Signature.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avani Signature Sep 24.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avani Signature 30th Sep 2024.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature- as on 30th September 2024 .pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avani Signature as on March 2024.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avani Signature as on June 2024.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Avani Signature Sep 24.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature as on June 2024.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avani Signature 30th June 2024.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature as on March 2024.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avani Signature 31st March 2024.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Avani Signature as on Dec 2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Avani Signature as on Dec 2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Avani Signature as on September 2023.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature as on September 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avani Signature as on Sept 2023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Avani Signature as on 31st March 2023.pdf5 Sep 2023
Other - TechnicalFile: PRCard 3747 New 23-8-23.pdf24 Aug 2023
Other - TechnicalFile: PRCard 3747 A New 23-8-23.pdf24 Aug 2023
Other - TechnicalFile: PRCard 3747 B New 23-8-23.pdf24 Aug 2023
Other - TechnicalFile: PRCard 3747 C New 23-8-23.pdf24 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dated 28-06-2023.pdf4 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature as on June 2023.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avani Signature as on June 2023.pdf21 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature as on March 2023.pdf24 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avani Signature as on March 2023.pdf24 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Avani Signature as on December 2022.pdf15 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avani Signature as on Dec 2022.pdf15 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Avani Signature Form 2- 30th June 2022.pdf4 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-September 2022.pdf4 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avani Signature June 2022.pdf4 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Avani Signature Sept 2022.pdf4 Nov 2022
Copy of the legal title reportFile: Title_Report-RERA-Final- Avani.pdf27 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Avani Signature.pdf18 May 2022

How this compares with Mumbai Suburban

48%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 9 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Avani Signature on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar Kirol6,700+ in Mumbai Suburban

2 kmAvani SignatureCompleted 115Lapsed / revoked 66Other 115Dot size: filed unitsN

Filed coordinates, straight-line distance. 296 registered projects within 2 km.

Builder: Avani Buildcon

AVANI BUILDCON has 2 registrations on MahaRERA, including PANCHAVATI and Avani Signature. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Avani Signature is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Avani Signature?

The registered promoter entity is Avani Buildcon, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Avani Signature?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Avani Signature?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Avani Signature?

The professionals named in the filing: Architect: Kalpesh shah; Engineer: SK consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: Gaurav S Rajpal & Co; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Avani Signature?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Avani Signature. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Avani Signature to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.