ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / AURIS BLISS

Registration lapsed No litigation declared Others project

AURIS BLISS

By TRANSCON-SHETH CREATORS PRIVATE LIMITED

RG-MH-12162 · RERA P51800000970 · Last updated on MahaRERA portal: 26 Mar 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 11 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
6 of 11Construction stages donefurthest along: Staircases, 90%
11Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

AURIS BLISS is a Others project by TRANSCON-SHETH CREATORS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000970 on 25 Jul 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 11 complaints are on record with the regulator.

At a glance

Project

  • NameAURIS BLISS
  • TypeOthers
  • Location
    • 18 M WIDE ROAD
    • MALAD WEST
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000970
  • ReraGenie IDRG-MH-12162

Builder

  • NameTRANSCON-SHETH CREATORS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAACT0197J1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsJitendra Natwarlal Sheth, Kirti Kediya
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live3 lapsed, de-registered or revoked

Key dates

22 months past promisethis monthRegisteredJul 2017PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Jul 2017
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AURIS BLISSNA520000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

AURIS BLISS: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities16

As on 26 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
GYMNASIUM AND SWIMMING POOLYes0%

Parking filed493

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots493
Closed/Covered493

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area781 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21437.82
Proposed, not sanctioned17,200 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSBI OVERSEAS BRANCH 2ND FLOOR THE ARCADE WORD TRADE CENTER CUFFE PARADE MUMBAI 400005

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS KHARCHE
Chartered AccountantSUTARIA ASSOCIATES
PartnerRole in project
TRANSCON-SHETH CREATORS PRIVATE LIMITED-

Litigation declared30

CaseCourtStatus
8640/1990CITY CIVILPENDING
1181/1996HIGH COURTPENDING
3849/2004CITY CIVILPENDING
353/2005CITY CIVILPENDING
545/2007CITY CIVILSTAYED
1908/2008CITY CIVILPENDING
8035/2009HIGH COURTPENDING
237/2010HIGH COURTPENDING
15/2011SLUM TRIBUNAL MUMBAIPENDING
2484/2012CITY CIVILPENDING
5074/2013HIGH COURTPENDING
4/2012SLUM TRIBUNAL MUMBAIPENDING
193/2014HIGH COURTPENDING
846/2012CITY CIVILPENDING
141/2014SMALL CAUSES COURTPENDING
123/2014SMALL CAUSES COURTPENDING
124/2014SMALL CAUSES COURTPENDING
125/2014SMALL CAUSES COURTPENDING
126/2014SMALL CAUSES COURTPENDING
154/2014SMALL CAUSES COURTPENDING
466/2014SMALL CAUSES COURTPENDING
2239/2014CITY CIVILPENDING
2240/2014CITY CIVILPENDING
332/681/2014SMALL CAUSES COURTPENDING
192/2014HIGH COURTPENDING
211/2015HIGH COURTPENDING
2735/2014CITY CIVILPENDING
748/2015CITY CIVILPENDING
1076/2015CITY CIVILPENDING
461/2015HIGH COURTPENDING

Complaints filed with MahaRERA11

Case no.ComplainantRespondentFiled
CC006000000001321Raju Vazirani & 8 othersTranscon Seth Creators Pvt Ltd16/10/2017
CC006000000012456Vikesh AgrawalTRANSCON SETH CREATORS PRIVATE LIMITED19/12/2017
CC006000000012459TARUN KHURANATranscon Sheth Crators Private Limited18/12/2017
CC006000000195513Hanif Usman KanjerTranscon Seth Creators Pvt. Ltd.05/01/2021
CC006000000195514Arefa Ashik KanjerTranscon Seth Creators PVt. Ltd.05/01/2021
CC006000000100601Mr. Prashanth KooknathTranscon-Sheth Creator Pvt. Ltd.23/08/2019
CC006000000251358transcon sheth creatorsShabana Zakir Hussain Sayyed04/06/2022
CC006000000303485Transcon Sheth Creators Pvt. Ltd.Aparna Jadhav & Anr.29/11/2022
CC006000000303737Transcon Sheth Creators Pvt LtdAjit and Soniya Mahato20/12/2022
CC006000000408650Sharan Pal SinghTranscon Sheth Creators Pvt. Ltd31/12/2023
CC12501907Mentor Capital LimitedTRANSCON-SHETH CREATORS PRIVATE LIMITED11/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: FORM-3.pdf26 Mar 2024
Other - FinanceFile: ANNEXURE-A DECLARATION-CUM-UNDERTAKING- AURIS BLISS 2024.pdf26 Mar 2024
Other - FinanceFile: FORMAT-A CHANGE IN BANK AC.pdf26 Mar 2024
Other - FinanceFile: FORMAT- A SEPARATE BANK AC.pdf26 Mar 2024
Certificates of CA (Form 3)File: Tower-00 Auris Bliss.pdf2 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AURIS BLISS 2020.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: AURIS BLISS 2021.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AURIS BLISS 2022.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AURIS BLISS 2023.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-05 Tower-05 Auris Bliss Mar-22.pdf23 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Engineers Certificate - Auris-5.pdf27 Oct 2023
Certificates of CA (Form 3)File: Tower-05 Auris Bliss.pdf23 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Auris Bliss.pdf17 Feb 2023
Certificates of CA (Form 3)File: Tower-05 Auris Bliss.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Auris Bliss Tower-5.pdf12 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: new.pdf7 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Auris Bliss 30-Sep-2022.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Auris Bliss 30-Sep-2022.pdf6 Dec 2022
Certificates of CA (Form 3)File: RERA - Tower-05 Auris Bliss Form 3 Nov 19.pdf3 Dec 2019
Building plan approvalFile: IOA sale - 2 (20th Sep 2019).pdf27 Sep 2019
Building Plan Approval (IOD)File: IOA sale - 2 (20th Sep 2019).pdf27 Sep 2019
Certificates of CA (Form 5)File: Tower-05.pdf8 Oct 2018
Proforma of Allotment letterFile: Combined Document compressed Bliss.pdf1 Nov 2017
Building plan approvalFile: Sale Building No-2 Malad BLISS.pdf21 Jul 2017
Layout approvalFile: layout compressed.pdf21 Jul 2017
PAN CardFile: TRANSCON SHETH CREATORS PAN.pdf21 Jul 2017
Copy of the legal title reportFile: Title Certificate Auris Bliss.pdf21 Jul 2017
Details of encumbrancesFile: Index-II-1000 cr.pdf21 Jul 2017
Details of encumbrancesFile: Index-II-240 CR AURIS BLISS.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: layout compressed.pdf21 Jul 2017
Building Plan Approval (IOD)File: Sale Building No-2 Malad BLISS.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Auris Bliss Plinth CC Sale building No 2.pdf21 Jul 2017
Declaration in FORM BFile: Affidavit Cum Declaration - Tower-V C.pdf21 Jul 2017
Declaration in FORM BFile: Orlem Conveyance -I C.pdf21 Jul 2017
Declaration in FORM BFile: Orlem Conveyance -II C.pdf21 Jul 2017
Declaration in FORM BFile: Resolution dated 04-07-2017.pdf21 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Auris Bliss c.pdf21 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT COMPRESSED.pdf21 Jul 2017
Certificates of CA (Form 3)File: Auris Bliss Tower 5 Cert Compressed.pdf21 Jul 2017
Proforma of Allotment letterFile: Auris Bliss C.pdf21 Jul 2017
OtherFile: FOR SIDHHART SIR 21072017.pdf21 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AURIS BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MALAD WEST6,700+ in Mumbai Suburban

2 kmAURIS BLISSCompleted 93Lapsed / revoked 58Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 271 registered projects within 2 km.

Builder: TRANSCON-SHETH CREATORS PRIVATE LIMITED

TRANSCON-SHETH CREATORS PRIVATE LIMITED has 8 registrations on MahaRERA, including AURIS SERENITY TOWER 1 and AURIS SERENITY TOWER 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that AURIS BLISS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if AURIS BLISS is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AURIS BLISS?

The registered promoter entity is TRANSCON-SHETH CREATORS PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAACT0197J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AURIS BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AURIS BLISS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AURIS BLISS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AURIS BLISS?

The professionals named in the filing: Architect: VILAS KHARCHE; Chartered Accountant: SUTARIA ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AURIS BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AURIS BLISS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AURIS BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.