Registered No litigation declared Others project

AURA

By 'P' SQUARE CONSTRUCTIONS

RG-MH-90320 · RERA P53100047676 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 4.03 crore secured on the land, in favour of THE BABASAHEB DESHMUKH SAHAKARI BANK LTD ATPADI

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Oct 2030Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
33 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 138 documents Report an error

AURA is a Others project by 'P' SQUARE CONSTRUCTIONS in Sangli, Maharashtra, registered with MahaRERA as P53100047676 on 17 Nov 2022. Possession is promised by 27 Oct 2030. 25 of the 58 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameAURA
  • TypeOthers
  • Location
    • Dhamni road
    • Hasara chowk
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100047676
  • ReraGenie IDRG-MH-90320

Builder

  • Name'P' SQUARE CONSTRUCTIONS
  • Entity typePartnership
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2022PromisedOct 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Nov 2022
  • Promised completion27 Oct 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed138 files

Current status

43%25 of 58 units booked
76.4%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUNGALOW BUILDING A,B,C,D,ENA33505
APPARTMENT BUILDINGNA151348553

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

BUNGALOW BUILDING A,B,C,D,E71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
APPARTMENT BUILDING61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Closed/Covered73
BuildingClosed/CoveredTotal
BUNGALOW BUILDING A,B,C,D,E55
APPARTMENT BUILDING6868

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,458 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofTHE BABASAHEB DESHMUKH SAHAKARI BANK LTD ATPADI
Secured amountRs 4.03 crore
CERSAI search filedYes
Declared on21 Jul 2025

Approvals and building plan

Sanctioning authoritySANGLI MUNCIPAL CORPORATION
Permissible FSI6744.94
Proposed, not sanctioned6,745 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMarket Yard,Sangli
Estimated costRs 24.27 cr
Cost incurredRs 18.54 cr
Work done76.37%
BuildingWingEstimatedIncurred
-NARs 24.27 crRs 18.54 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIVEKANAND MURLIDHAR DESHPANDE MURLIDHAR DESHPANDE
ArchitectSHAMBHAJI PATIL PATIL
EngineerHARSHVARDHAN KAMBLE Sunil patil
Chartered AccountantKEDAR G PHATAK
Chartered AccountantUTTAMKUMAR KERBA PAWAR
PartnerRole in project
'P' SQUARE CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 27 Oct 2030

Documents filed138

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: form 2A.pdf12 Jun 2026
Form 2A (FY 2022-2023)File: form 2A.pdf12 Jun 2026
Form 2A (FY 2023-2024)File: form 2 A.pdf12 Jun 2026
Form 2A (FY 2025-2026)File: form 2A.pdf12 Jun 2026
Form 5 (FY 2022-2023)File: From 5.pdf11 Jun 2026
Form 5 (FY 2023-2024)File: Form 5.pdf11 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 (1).pdf11 Jun 2026
Withdrawal Update Form 1File: Form1.pdf13 May 2026
Withdrawal Update Form 2File: Form2.pdf13 May 2026
Withdrawal Update Form 3File: From 3.pdf13 May 2026
Withdrawal Update Form 1File: form1.pdf17 Feb 2026
Withdrawal Update Form 1File: Form1.pdf17 Feb 2026
Withdrawal Update Form 2File: form 2.pdf17 Feb 2026
Withdrawal Update Form 2File: Form2.pdf17 Feb 2026
Withdrawal Update Form 3File: From 3.pdf17 Feb 2026
Withdrawal Update Form 3File: From 3-compressed.pdf17 Feb 2026
Withdrawal Update Form 1File: Form1.pdf18 Sep 2025
Withdrawal Update Form 2File: Form2.pdf18 Sep 2025
Withdrawal Update Form 3File: From 3.pdf18 Sep 2025
Form 1File: Form 1.pdf21 Jul 2025
Form 2File: Form 2.pdf21 Jul 2025
Form 3File: Form 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf21 Jul 2025
Form 1File: Form 1.pdf21 Jul 2025
Form 2File: Form 2.pdf21 Jul 2025
Form 3File: Form 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf21 Jul 2025
Form 1File: Form 1.pdf21 Jul 2025
Form 2File: Form 2.pdf21 Jul 2025
Form 3File: Form 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf21 Jul 2025
Form 2File: Form 2.pdf21 Jul 2025
Form 3File: Form 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf21 Jul 2025
Form 1File: Form 1.pdf21 Jul 2025
Form 1File: Form 1.pdf21 Jul 2025
Form 2File: Form 2.pdf21 Jul 2025
Form 3File: Form 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disdlosure of sold inventry.pdf21 Jul 2025
Form 2File: FORM 2.pdf21 Jul 2025
Form 3File: From 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of sold inventry.pdf21 Jul 2025
Form 1File: From 1.pdf21 Jul 2025
Form 3File: From 3.pdf21 Jul 2025
Form 2File: Engineer certificate.pdf21 Jul 2025
Form 1File: From 1.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf21 Jul 2025
Form 1File: Form 1.pdf21 Jul 2025
Form 2File: FORM 2.pdf21 Jul 2025
Form 3File: From 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf21 Jul 2025
Form 1File: Form 1.pdf21 Jul 2025
Form 2File: FORM 2.pdf21 Jul 2025
Form 3File: From 3.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf21 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5 NEW.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Disclosure of sold inventry.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventry.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventry.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventry.pdf20 Feb 2025
Building plan approvalFile: HPSCANNER2466.pdf27 Dec 2024
Building plan approvalFile: HPSCANNER2466.pdf27 Dec 2024
Building plan approvalFile: HPSCANNER2468.pdf27 Dec 2024
Building plan approvalFile: HPSCANNER2466.pdf27 Dec 2024
Building plan approvalFile: scan_20241202093455.pdf27 Dec 2024
Building plan approvalFile: scan_20241202094102.pdf27 Dec 2024
Building plan approvalFile: scan_20241202093627.pdf27 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: new Bandhkaam parvana.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER2466.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan_20241202093627.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan_20241202094102.pdf27 Dec 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MARVEL CRYSTA PHASE 1PLOT B1 DHAMNI ROAD SANGLI16CompletedOct 2021Dec 2019

How this compares with Sangli

43%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep AURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hasara chowk790+ in Sangli

2 kmAURACompleted 85Lapsed / revoked 49Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 158 registered projects within 2 km.

Builder: 'P' SQUARE CONSTRUCTIONS

'P' SQUARE CONSTRUCTIONS has 3 registrations on MahaRERA, including MARVEL CRYSTA PHASE I and MARVEL CRYSTA PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if AURA is delayed beyond 27 Oct 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AURA?

The registered promoter entity is 'P' SQUARE CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AURA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AURA?

The professionals named in the filing: Architect: VIVEKANAND MURLIDHAR DESHPANDE MURLIDHAR DESHPANDE; Architect: SHAMBHAJI PATIL PATIL; Engineer: HARSHVARDHAN KAMBLE Sunil patil; Chartered Accountant: KEDAR G PHATAK; Chartered Accountant: UTTAMKUMAR KERBA PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AURA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.