AURA
RG-MH-90320 · RERA P53100047676 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 4.03 crore secured on the land, in favour of THE BABASAHEB DESHMUKH SAHAKARI BANK LTD ATPADI
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AURA is a Others project by 'P' SQUARE CONSTRUCTIONS in Sangli, Maharashtra, registered with MahaRERA as P53100047676 on 17 Nov 2022. Possession is promised by 27 Oct 2030. 25 of the 58 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.
At a glance
Project
- NameAURA
- TypeOthers
- Location
- Dhamni road
- Hasara chowk
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100047676
- ReraGenie IDRG-MH-90320
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Nov 2022
- Promised completion27 Oct 2030
- Revised completionNone
- Buildings2 building records
- Documents filed138 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUNGALOW BUILDING A,B,C,D,E | NA | 3 | 3 | 5 | 0 | 5 |
| APPARTMENT BUILDING | NA | 15 | 13 | 48 | 5 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
BUNGALOW BUILDING A,B,C,D,E71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
APPARTMENT BUILDING61%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed73
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUNGALOW BUILDING A,B,C,D,E | 5 | 5 |
| APPARTMENT BUILDING | 68 | 68 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 24.27 cr | Rs 18.54 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIVEKANAND MURLIDHAR DESHPANDE MURLIDHAR DESHPANDE |
| Architect | SHAMBHAJI PATIL PATIL |
| Engineer | HARSHVARDHAN KAMBLE Sunil patil |
| Chartered Accountant | KEDAR G PHATAK |
| Chartered Accountant | UTTAMKUMAR KERBA PAWAR |
| Partner | Role in project |
|---|---|
| 'P' SQUARE CONSTRUCTIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Sep 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 27 Oct 2030
Documents filed138
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 138 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: form 2A.pdf | 12 Jun 2026 |
| Form 2A (FY 2022-2023)File: form 2A.pdf | 12 Jun 2026 |
| Form 2A (FY 2023-2024)File: form 2 A.pdf | 12 Jun 2026 |
| Form 2A (FY 2025-2026)File: form 2A.pdf | 12 Jun 2026 |
| Form 5 (FY 2022-2023)File: From 5.pdf | 11 Jun 2026 |
| Form 5 (FY 2023-2024)File: Form 5.pdf | 11 Jun 2026 |
| Form 5 (FY 2025-2026)File: Form 5 (1).pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Form2.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: From 3.pdf | 13 May 2026 |
| Withdrawal Update Form 1File: form1.pdf | 17 Feb 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 17 Feb 2026 |
| Withdrawal Update Form 2File: Form2.pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: From 3.pdf | 17 Feb 2026 |
| Withdrawal Update Form 3File: From 3-compressed.pdf | 17 Feb 2026 |
| Withdrawal Update Form 1File: Form1.pdf | 18 Sep 2025 |
| Withdrawal Update Form 2File: Form2.pdf | 18 Sep 2025 |
| Withdrawal Update Form 3File: From 3.pdf | 18 Sep 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 2File: Form 2.pdf | 21 Jul 2025 |
| Form 3File: Form 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf | 21 Jul 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 2File: Form 2.pdf | 21 Jul 2025 |
| Form 3File: Form 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf | 21 Jul 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 2File: Form 2.pdf | 21 Jul 2025 |
| Form 3File: Form 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf | 21 Jul 2025 |
| Form 2File: Form 2.pdf | 21 Jul 2025 |
| Form 3File: Form 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf | 21 Jul 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 2File: Form 2.pdf | 21 Jul 2025 |
| Form 3File: Form 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disdlosure of sold inventry.pdf | 21 Jul 2025 |
| Form 2File: FORM 2.pdf | 21 Jul 2025 |
| Form 3File: From 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of sold inventry.pdf | 21 Jul 2025 |
| Form 1File: From 1.pdf | 21 Jul 2025 |
| Form 3File: From 3.pdf | 21 Jul 2025 |
| Form 2File: Engineer certificate.pdf | 21 Jul 2025 |
| Form 1File: From 1.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf | 21 Jul 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 2File: FORM 2.pdf | 21 Jul 2025 |
| Form 3File: From 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf | 21 Jul 2025 |
| Form 1File: Form 1.pdf | 21 Jul 2025 |
| Form 2File: FORM 2.pdf | 21 Jul 2025 |
| Form 3File: From 3.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold inventry.pdf | 21 Jul 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 NEW.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Disclosure of sold inventry.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventry.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventry.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold inventry.pdf | 20 Feb 2025 |
| Building plan approvalFile: HPSCANNER2466.pdf | 27 Dec 2024 |
| Building plan approvalFile: HPSCANNER2466.pdf | 27 Dec 2024 |
| Building plan approvalFile: HPSCANNER2468.pdf | 27 Dec 2024 |
| Building plan approvalFile: HPSCANNER2466.pdf | 27 Dec 2024 |
| Building plan approvalFile: scan_20241202093455.pdf | 27 Dec 2024 |
| Building plan approvalFile: scan_20241202094102.pdf | 27 Dec 2024 |
| Building plan approvalFile: scan_20241202093627.pdf | 27 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: new Bandhkaam parvana.pdf | 27 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER2466.pdf | 27 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: scan_20241202093627.pdf | 27 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: scan_20241202094102.pdf | 27 Dec 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MARVEL CRYSTA PHASE 1 | PLOT B1 DHAMNI ROAD SANGLI | 16 | Completed | Oct 2021 | Dec 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 138 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AURA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hasara chowk790+ in Sangli
Filed coordinates, straight-line distance. 158 registered projects within 2 km.
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: 'P' SQUARE CONSTRUCTIONS
'P' SQUARE CONSTRUCTIONS has 3 registrations on MahaRERA, including MARVEL CRYSTA PHASE I and MARVEL CRYSTA PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if AURA is delayed beyond 27 Oct 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AURA?
The registered promoter entity is 'P' SQUARE CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AURA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AURA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AURA?
The professionals named in the filing: Architect: VIVEKANAND MURLIDHAR DESHPANDE MURLIDHAR DESHPANDE; Architect: SHAMBHAJI PATIL PATIL; Engineer: HARSHVARDHAN KAMBLE Sunil patil; Chartered Accountant: KEDAR G PHATAK; Chartered Accountant: UTTAMKUMAR KERBA PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AURA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback