Home / Browse projects / Pune, Maharashtra / AUM VERTEX

Registered No litigation declared Commercial project

AUM VERTEX

By Aum Buildcon

RG-MH-95700 · RERA P52100051544 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
3 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

AUM VERTEX is a Commercial project by Aum Buildcon in Pune, Maharashtra, registered with MahaRERA as P52100051544 on 27 Jun 2023. Possession is promised by 30 Dec 2026. The completion date has moved by 12 months from the original filing. 14 of the 17 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameAUM VERTEX
  • TypeCommercial
  • Location
    • RAHATANI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051544
  • ReraGenie IDRG-MH-95700

Builder

  • NameAum Buildcon
  • Entity typePartnership
  • GSTIN27ABZFA0458N1ZO
  • PartnersMohan Tolaram Keswani, Bindiya Mohan Keswani

Key dates

this monthRegisteredJun 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed82 files

Current status

82%14 of 17 units booked
96.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AUM VERTEXNA6501717

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

AUM VERTEX: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed157

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots157
Closed/Covered133
Open Space24

Land and ownership32

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners32
Encumbrance on the landDeclared none
Declared on16 Jun 2025
LandownerVillageDistrict
Latabai Kaluram JadhavPune (M Corp.)Pune
Baby Sopan BhaleraoPune (M Corp.)Pune
Chandrabai Sopan BhaleraoPune (M Corp.)Pune
Dilip Ghanshyam BhaleraoPune (M Corp.)Pune
Anusuyabai Bhaguji OvhalPune (M Corp.)Pune
Lahanubai Maruit KamblePune (M Corp.)Pune
Bhanabai Govind JagtapPune (M Corp.)Pune
Sanjay Ghanshyam BhaleraoPune (M Corp.)Pune
Malan Jaywani SonawanePune (M Corp.)Pune
Shalan Krishna BhosalePune (M Corp.)Pune
Sunita Sanjay KamblePune (M Corp.)Pune
Rani Vilas GaikwadPune (M Corp.)Pune
Nanda Ashok BhaleraoPune (M Corp.)Pune
Rupali Ganesh OvhalPune (M Corp.)Pune
Komal Shashikant DolasPune (M Corp.)Pune
Neelam Ashok BhaleraoPune (M Corp.)Pune
Pooja Ashok BhaleraoPune (M Corp.)Pune
Abhishek Ashok BhaleraoPune (M Corp.)Pune
Sundar Udharam PanjabiPune (M Corp.)Pune
Zumber Baburao BhaleraoPune (M Corp.)Pune
Rajesh Baburao BhaleraoPune (M Corp.)Pune
Vitubai Vidhydhar ChabuswarPune (M Corp.)Pune
Sumitrabai Dadualis baban BhaleraoPune (M Corp.)Pune
Sukhdev DaduALis Baban BhaleraoPune (M Corp.)Pune
Mohan DaduAlis Baban BhaleraoPune (M Corp.)Pune
Alka Harishchandra OvalPune (M Corp.)Pune
Sharda Sadashiv WaghmarePune (M Corp.)Pune
Asha Sharad WaghmarePune (M Corp.)Pune
Mrs Rajkumari ChoithramaniPune (M Corp.)Pune
Mrs Anita Sharad WaghmarePimpri Chinchawad (M Corp.)Pune
Mr Raghunath BaleraoPimpri Chinchawad (M Corp.)Pune
Asha Ram LokhandePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHICHWAD MUNCIPAL CORPORATION
Permissible FSI1849.13
Proposed, not sanctioned1,849 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPRI PUNE
Estimated costRs 10.00 cr
Cost incurredRs 9.60 cr
Work done96.0%
BuildingWingEstimatedIncurred
AUM VERTEXNARs 8.69 crRs 8.34 cr
-NARs 1.31 crRs 1.26 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin sutar
EngineerMr Pankaj Keswani
EngineerROHINEE BADGUJAR
EngineerVijay Nimbalkar
EngineerMohammad Ali Mahboob Shaikh
Chartered AccountantM s Rinkesh Gupta and Associates
Chartered AccountantAZAM MULANI
PartnerRole in project
Aum Buildcon-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30122519153Dec 2025 → Dec 2026

Reason as filed by the promoterOne noc is pending to be received

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf20 Jul 2026
Withdrawal Update Form 3File: form 3.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: form 2 a.pdf20 Jul 2026
Form 2A (FY 2023-2024)File: Form 2 A 2023-2024.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 (2).pdf10 Apr 2026
Withdrawal Update Form 2File: Form 2 (2).pdf10 Apr 2026
Withdrawal Update Form 3File: Form 3 (7).pdf10 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf30 Dec 2025
Withdrawal Update Form 2File: Form 2.pdf30 Dec 2025
Withdrawal Update Form 3File: form 3.pdf30 Dec 2025
Building plan approvalFile: architect letter (1).pdf22 Dec 2025
Withdrawal Update Form 1File: Form 1.PDF11 Oct 2025
Withdrawal Update Form 2File: Form 2.PDF11 Oct 2025
Withdrawal Update Form 3File: form 3.pdf11 Oct 2025
Form 5 (FY 2024-2025)File: Aum Buildcon.pdf30 Sep 2025
Withdrawal Update Form 1File: Architect Certificate.PDF29 Sep 2025
Withdrawal Update Form 2File: Engineer Certificate.PDF29 Sep 2025
Withdrawal Update Form 3File: Form 3 (2).pdf29 Sep 2025
Form 2A (FY 2024-2025)25 Jun 2025
Form 5 (FY 2023-2024)File: AUM BUILDCON.pdf17 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: STATEMENT.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.PDF6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.PDF6 Jan 2025
Disclosure of sold/ booked inventoryFile: STATEMENT.PDF6 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AUM BUILDCON.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form - 3.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Oct'24.PDF11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Oct'24.PDF11 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory - Oct'24.PDF11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.PDF5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.PDF5 Jul 2024
Disclosure of sold/ booked inventoryFile: STATEMENT.PDF5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -.pdf5 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Apr'24.PDF6 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Apr'24.PDF6 Apr 2024
Disclosure of sold/ booked inventoryFile: Scan - Sold Unsold Summary.PDF6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Copy Form 3.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AUM CA.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf5 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: statement.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHI.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: OWNER.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FRM3_compressed (1).pdf7 Oct 2023
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (2).pdf12 Jun 2023
Layout approvalFile: 3 Building Plan Approval _ NA Order for plotted development.pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (2).pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: 3 Building Plan Approval _ NA Order for plotted development.pdf12 Jun 2023
Building plan approvalFile: Commercial Wing_compressed.pdf26 May 2023
Building plan approvalFile: Commercial Wing 2_compressed.pdf26 May 2023
Building plan approvalFile: ARCHITECT LETTER - AREA.pdf26 May 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (5) (1).pdf26 May 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (5) (1).pdf26 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Commercial Wing_compressed.pdf26 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Commercial Wing 2_compressed.pdf26 May 2023
Building Plan Approval / NA Order for plotted developmentFile: ARCHITECT LETTER - AREA.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Aum buildcon (1)_compressed.pdf26 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (5) (1).pdf26 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (2) (1).pdf26 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations (2) (1).pdf26 May 2023
Proforma of Allotment letterFile: Model Allottment Letter RERA.PDF26 May 2023
PAN CardFile: AUM Buildcon.pdf25 May 2023
Copy of the legal title reportFile: 1 Copy of the legal title report (7) (1).pdf25 May 2023
Copy of the legal title reportFile: Latest Search Report 1_compressed-1-5.pdf25 May 2023
Copy of the legal title reportFile: Latest Search Report 1_compressed-6-11.pdf25 May 2023
Details of encumbrances concerned to FinanceFile: No Encumbrances Declaration.pdf25 May 2023
Details of encumbrances concerned to LegalFile: No Encumbrances Declaration.pdf25 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2022 Dec.pdf25 May 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (2) (1).pdf25 May 2023
Declaration in FORM BFile: Affidavit cum Declaration on Stamp Paper.PDF25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 May 2023.pdf25 May 2023
CERSAI detailsFile: CERSAI Declaration.PDF25 May 2023
Proforma of Agreement for saleFile: AFS Vertex.pdf25 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Ac.PDF25 May 2023

How this compares with Pune

82%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AUM VERTEX on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAHATANI13,700+ in Pune

2 kmAUM VERTEXCompleted 76Lapsed / revoked 39Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: Aum Buildcon

Aum Buildcon has 1 registration on MahaRERA, including AUM VERTEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AUM VERTEX is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AUM VERTEX?

The registered promoter entity is Aum Buildcon, a partnership as per the filing. Its GSTIN 27ABZFA0458N1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AUM VERTEX?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AUM VERTEX?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AUM VERTEX?

The professionals named in the filing: Architect: Sachin sutar; Engineer: Mr Pankaj Keswani; Engineer: ROHINEE BADGUJAR; Engineer: Vijay Nimbalkar; Engineer: Mohammad Ali Mahboob Shaikh; Chartered Accountant: M s Rinkesh Gupta and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AUM VERTEX?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AUM VERTEX. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AUM VERTEX to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.