Home / Browse projects / Mumbai Suburban, Maharashtra / ATLANTIS

Registered No litigation declared Residential / Group Housing project

ATLANTIS

By NHP CONSTRUCTION LLP

RG-MH-07533 · RERA P51800056097 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
8 of 12Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

ATLANTIS is a Residential / Group Housing project by NHP CONSTRUCTION LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056097 on 10 May 2024. Possession is promised by 31 Dec 2027. 4 of the 12 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameATLANTIS
  • TypeResidential / Group Housing
  • Location
    • AT V.L. MEHTA ROAD
    • VILE PARLE (WEST)
    • Juhu
    • Andheri
    • Mumbai Suburban
    • 400049
  • Pincode400049
  • RERA no.P51800056097
  • ReraGenie IDRG-MH-07533

Builder

  • NameNHP CONSTRUCTION LLP
  • Entity typePartnership
  • PartnerNITIN TRAMBAKLAL SANGHAVI
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

33%4 of 12 units booked
50.7%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATLANTISNA3312012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

ATLANTIS: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks58%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.16%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area845 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jul 2025
LandownerVillageDistrict
MAHESH VORAVileparleMumbai Suburban
NITIN SANGHAVIVileparleMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3025.69
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 316, GROUND FLOOR, SYMPHONY PREMISES, NEHRU ROAD , VILE PARLE EAST, MUMBAI 400057
Estimated costRs 34.76 cr
Cost incurredRs 17.62 cr
Work done50.69%
BuildingWingEstimatedIncurred
ATLANTISNARs 19.86 crRs 16.92 cr
-NARs 14.90 crRs 70.49 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSP Associates
EngineerKrishnakumar L Gohel
Chartered AccountantJINESH SHAH AND CO
Chartered Accountantmahindra choudhari
Chartered AccountantKAGRANA & ASSOCIATES
PartnerRole in project
NHP CONSTRUCTION LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf12 May 2026
Withdrawal Update Form 2File: FORM 2.pdf12 May 2026
Withdrawal Update Form 3File: FORM 3.pdf12 May 2026
Form 5 (FY 2024-2025)File: FORM 5 FY 2024-2025 Atlantis.pdf28 Feb 2026
Withdrawal Update Form 1File: Q3 - OCT25 - DEC25 - Form 1 - Architect Certificate.pdf18 Feb 2026
Withdrawal Update Form 2File: Q3 - Oct25 - Dec25 - Form 2 - Engineer Certificate Atlantis.pdf18 Feb 2026
Withdrawal Update Form 3File: Q3 - OCT25 - DEC25 - Form3 - CA Certificate.pdf18 Feb 2026
Withdrawal Update Form 1File: Q1 - APR25 - JUN25 - FORM1 ARCHITECT CERTIFICATE_Atlantis.pdf17 Feb 2026
Withdrawal Update Form 2File: Q2 - JUL25 - SEP25 - FORM2 - ENGINEER CERTIFICATE (1).pdf17 Feb 2026
Withdrawal Update Form 3File: Q2 - JUL25 - SEP25 - FORM3 - CA CERTIFICATE.pdf17 Feb 2026
Withdrawal Update Form 1File: Q1 - APR25 - JUN25 - FORM1 ARCHITECT CERTIFICATE_Atlantis.pdf10 Dec 2025
Withdrawal Update Form 2File: Q1 - APR25 - JUN25 - FORM2 - ENGINEER CERTIFICATE_Atlantis.pdf10 Dec 2025
Withdrawal Update Form 3File: Q1 - APR25 - JUN25 - FORM3 - CA CERTIFICATE_Atlantis_compressed.pdf10 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATLANTIS-FORM 1 Architect Certificate Q2_0001.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ATLANTIS-FORM 3 CA Certificate Q2.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATLANTIS-FORM 2 Engineer certificate Q2_0001.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf10 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2_Disclosure of Interest - NBU Bearing Pvt Ltd.pdf3 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MCA - NBU Bearing Pvt Ltd.pdf3 May 2024
Other - LegalFile: SCAN NOC FOR REDEVELOPMENT.pdf25 Apr 2024
Other - LegalFile: 1 Tenancy Transfer FALGUNI S_FARIDA VORA (1)_1-20.pdf25 Apr 2024
Other - LegalFile: 1 Tenancy Transfer FALGUNI S_FARIDA VORA (1)_21-35.pdf25 Apr 2024
Other - LegalFile: 1 Tenancy Transfer FALGUNI S_FARIDA VORA (1)_36-45.pdf25 Apr 2024
Other - LegalFile: 1 Tenancy Transfer FALGUNI S_FARIDA VORA (1)_46-54.pdf25 Apr 2024
Other - LegalFile: 1 Tenancy Transfer FALGUNI S_FARIDA VORA (1)_55-end.pdf25 Apr 2024
Other - LegalFile: 1 Tenancy transfer HRIDEY S _ JAYKRISHNA_1-35.pdf25 Apr 2024
Other - LegalFile: 1 Tenancy transfer HRIDEY S _ JAYKRISHNA_36-end.pdf25 Apr 2024
Other - LegalFile: 4 Assignment deed Kapila to maniben_12-11-1962.pdf25 Apr 2024
Other - LegalFile: 14 share certificate_Dec2006.pdf25 Apr 2024
Other - LegalFile: 3 Indenture Kapol to kapila_28-04-1960.pdf25 Apr 2024
Other - LegalFile: 2 Other - Technical.pdf28 Mar 2024
Other - TechnicalFile: Annexure A - Declration - standalone.pdf29 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2_Disclosure of interest in other organisations-FNS1_0001 (1).pdf19 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 2410703_FirstCC_signed.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2_Disclosure of interest in other organisations-NTS.pdf23 Jan 2024
Proforma of Allotment letterFile: 15_Draft Allotment letter Atlantis (2).pdf23 Jan 2024
Deviation Report with respect to Allotment letterFile: 14_Deviation report for allotment letter_0001.pdf23 Jan 2024
Deviation Report with respect to model copy of AgreementFile: 14_Deviation report for agreement for sale_0001_1-9.pdf23 Jan 2024
Deviation Report with respect to model copy of AgreementFile: 14_Deviation report for agreement for sale_0001_10-end.pdf23 Jan 2024
Building plan approvalFile: 2387079_IOD_signed.pdf10 Jan 2024
Layout approvalFile: Drawing (56).pdf10 Jan 2024
PAN CardFile: PAN Card - NHP CONSTRUCTION LLP.pdf10 Jan 2024
Copy of the legal title reportFile: LEGAL TITLE CERTIFICATE 22-04-24 (1).pdf10 Jan 2024
Details of encumbrances concerned to FinanceFile: 10_NO ENCUMBRANCE SELF DECLARATION.pdf10 Jan 2024
Details of encumbrances concerned to LegalFile: 10_NO ENCUMBRANCE SELF DECLARATION.pdf10 Jan 2024
Copy of Layout Approval (in case of layout)File: Drawing (56).pdf10 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2387079_IOD_signed.pdf10 Jan 2024
Declaration about Commencement CertificateFile: CC COVERING LETTER_0001.pdf10 Jan 2024
Declaration in FORM BFile: 9_FORM B - PROMOTER.pdf10 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE - ATLANTIS.pdf10 Jan 2024
CERSAI detailsFile: 11_CERSAI DECLARATION.pdf10 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ATLANTIS UPTO DEC 23 (1).pdf10 Jan 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (12) (1).pdf10 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 4_FORMAT A SEPARATE BANK ACCOUNT LETTTER DRAFT.pdf10 Jan 2024

How this compares with Mumbai Suburban

33%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATLANTIS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE (WEST)6,700+ in Mumbai Suburban

Builder: NHP CONSTRUCTION LLP

NHP CONSTRUCTION LLP has 3 registrations on MahaRERA, including W 92 and MEGHDOOT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ATLANTIS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATLANTIS?

The registered promoter entity is NHP CONSTRUCTION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATLANTIS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATLANTIS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATLANTIS?

The professionals named in the filing: Architect: SP Associates; Engineer: Krishnakumar L Gohel; Chartered Accountant: JINESH SHAH AND CO; Chartered Accountant: mahindra choudhari; Chartered Accountant: KAGRANA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATLANTIS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATLANTIS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATLANTIS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.