Home / Browse projects / Nagpur, Maharashtra / ATHARVA SAPPHIRE TOWERS-B
ATHARVA SAPPHIRE TOWERS-B
RG-MH-94558 · RERA P50500054298 · Last updated on MahaRERA portal: 5 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ATHARVA SAPPHIRE TOWERS-B is a Others project by ATHARVA INFRAVENTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500054298 on 15 Jan 2024. Possession is promised by 31 Dec 2029.
At a glance
Project
- NameATHARVA SAPPHIRE TOWERS-B
- TypeOthers
- Location
- CHICHBHAVAN
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 441108
- Pincode441108
- RERA no.P50500054298
- ReraGenie IDRG-MH-94558
Builder
- NameATHARVA INFRAVENTURES
- Entity typePartnership
- PartnersSHIVANI ANKIT POTUWAR, PRATIK CHANDRAKANT SURAMWAR, VIJAY PANDURANG POREDDIWAR, RAJU BALAJI CHANNEWAR
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jan 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ATHARVA SAPPHIRE TOWERS-B | NA | 13 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 66%.
ATHARVA SAPPHIRE TOWERS-B: 34% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 66% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 1% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 10% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed109
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LOKES KADU |
| Engineer | KAMAL SHAHU |
| Chartered Accountant | CA ANKIT TALREJA |
| Partner | Role in project |
|---|---|
| ATHARVA INFRAVENTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Dec 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 001 Form No 01 Tower B March 2026.pdf | 5 May 2026 |
| Form 2File: 002 Form No 02 Tower B March 2026.pdf | 5 May 2026 |
| Form 3File: 003 Form No 03 Tower B March 2026.pdf | 5 May 2026 |
| Disclosure of Sold and Booked InventoryFile: 004 Booking Status Report of Atharva infra ventures tower B.pdf | 5 May 2026 |
| Self-declaration of Quarterly ProgressFile: 005 QPR of Atharva infra ventures tower B.pdf | 5 May 2026 |
| Form 2A (FY 2025-2026)File: 005 Form No 2A Tower B FY 202526.pdf | 5 May 2026 |
| Form 1File: Form No 01 Architects Certificate Dec 2025.pdf | 17 Feb 2026 |
| Form 2File: Form No 02 Engineers Certificate Dec 2025 Tower B.pdf | 17 Feb 2026 |
| Form 3File: Form No 03 Atharva Sapphire Tower B Dec 2025.pdf | 17 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Booking Status Dec 2025.pdf | 17 Feb 2026 |
| Self-declaration of Quarterly ProgressFile: QPR GN Dec 2025.pdf | 17 Feb 2026 |
| Form 1File: Form No 01 Sept 2025 Atharva Sapphire Towers - B.pdf | 18 Dec 2025 |
| Form 2File: Form No 02 Sept 2025 Atharva Sapphire Towers - B.pdf | 18 Dec 2025 |
| Form 3File: Form No 03 Sept 2025 Atharva Sapphire Towers - B.pdf | 18 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Booking Status Sept 2025.pdf | 18 Dec 2025 |
| Self-declaration of Quarterly ProgressFile: QPR GN Sept 2025.pdf | 18 Dec 2025 |
| Form 1File: Form 01 June 2025 Saffire Tower B.pdf | 16 Sep 2025 |
| Form 2File: Form 2 - Engineer's Certificate June 2025 Tower B_compressed.pdf | 16 Sep 2025 |
| Form 3File: Form 03 Atharva Sapphire Tower - B June2025.pdf | 16 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Booking Status Atharva Sapphire Tower - B June2025.pdf | 16 Sep 2025 |
| Self-declaration of Quarterly ProgressFile: QPR Atharva Sapphire Tower - B June2025.pdf | 16 Sep 2025 |
| Form 1File: Form 1 - Architect Certificate March 2025.pdf | 12 Jul 2025 |
| Form 2File: Form 2 - Engineer Certificate March 2025_compressed.pdf | 12 Jul 2025 |
| Form 3File: Form No 03 March 2025 Atharva Sapphire Towers - B.pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Booking Status March 2025_compressed.pdf | 12 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: QPR GN March 2025_compressed.pdf | 12 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 AST B.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 AST B.pdf | 23 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold AST B.pdf | 23 Apr 2025 |
| Declaration in FORM BFile: FORM-B.pdf | 7 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrance.pdf | 20 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 20 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf | 20 Mar 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A.pdf | 20 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrance.pdf | 20 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT-B.pdf | 20 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE.pdf | 20 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ATHARVA SAPPHIRE TOWERS-B 04-01-2025.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_JUNE-24.pdf | 13 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_SEP-24.pdf | 13 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: MAR-24.pdf | 13 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: June-24.pdf | 13 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SEP-24.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5.pdf | 13 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Hitesh Heights Wing B Form 5.pdf | 7 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Atharve Sapphire Tower -B.pdf | 5 Dec 2024 |
| Building plan approvalFile: E SANCTION-Revised_.pdf | 29 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: E PERMIT- Revised.pdf | 29 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: E SANCTION-Revised_.pdf | 29 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ATHARVA SAPPHIRE TOWERS-B_SEP_2024.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_june-24.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_Sep-24.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATHARVA SAPPHIRE TOWERS-B 01-07-2024.pdf | 2 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Atharva Shapphire Toewr-B Page-1.pdf | 4 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Atharva Shaaphire Tower-B Form 2A-1.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATHAVA SAPPHIRE TOWER -B 01-04-2024 (1).pdf | 19 Apr 2024 |
| Other - LegalFile: 1-12.pdf | 5 Jan 2024 |
| Other - LegalFile: 13-25.pdf | 5 Jan 2024 |
| Other - LegalFile: 26-40.pdf | 5 Jan 2024 |
| Other - LegalFile: 41-50.pdf | 5 Jan 2024 |
| Other - LegalFile: 51-65.pdf | 5 Jan 2024 |
| Other - LegalFile: 66-82.pdf | 5 Jan 2024 |
| Other - LegalFile: Partnership Deed.pdf | 5 Jan 2024 |
| Other - FinanceFile: FORM - 3 ATHARVA SAPPHIRE TOWER - B (1)_page-0004.pdf | 5 Jan 2024 |
| Other - TechnicalFile: Declaration.pdf | 31 Dec 2023 |
| Layout approvalFile: E SANCTION-3.pdf | 14 Dec 2023 |
| Building plan approvalFile: E SANCTION PDF 38 (2)_compressed.pdf | 14 Dec 2023 |
| PAN CardFile: 1 PAN Card (5).pdf | 14 Dec 2023 |
| Copy of the legal title reportFile: Search Report-ATHARVA INFRAVENTURE-plot no 38 (1).pdf | 14 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUM_FINANCE_Prepared_Atharva.pdf | 14 Dec 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUM_legal_Prepared_Atharva Sapphire.pdf | 14 Dec 2023 |
| Details of encumbrances concerned to LegalFile: ENCUM_FINANCE_Prepared_Atharva.pdf | 14 Dec 2023 |
| Details of encumbrances concerned to LegalFile: ENCUM_legal_Prepared_Atharva Sapphire.pdf | 14 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: E SANCTION-3.pdf | 14 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: E SANCTION PDF 38 (2)_compressed.pdf | 14 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: E PERMIT PDF 38.pdf | 14 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: E PERMIT PDF 38.pdf | 14 Dec 2023 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 14 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ATHARVA SAPPHIRE TOWERS-B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHICHBHAVAN2,800+ in Nagpur
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: ATHARVA INFRAVENTURES
ATHARVA INFRAVENTURES has 2 registrations on MahaRERA, including ATHARVA SAPPHIRE TOWERS-A and ATHARVA SAPPHIRE TOWERS-B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if ATHARVA SAPPHIRE TOWERS-B is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ATHARVA SAPPHIRE TOWERS-B?
The registered promoter entity is ATHARVA INFRAVENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ATHARVA SAPPHIRE TOWERS-B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ATHARVA SAPPHIRE TOWERS-B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ATHARVA SAPPHIRE TOWERS-B?
The professionals named in the filing: Architect: LOKES KADU; Engineer: KAMAL SHAHU; Chartered Accountant: CA ANKIT TALREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATHARVA SAPPHIRE TOWERS-B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback