ATHARVA SANKALP

By SANKALP GROUP

RG-MH-06245 · RERA P52000052565 · Last updated on MahaRERA portal: 12 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
75 of 130Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

ATHARVA SANKALP is a Others project by SANKALP GROUP in Raigarh, Maharashtra, registered with MahaRERA as P52000052565 on 11 Sep 2023. Possession is promised by 31 Dec 2026. 55 of the 130 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameATHARVA SANKALP
  • TypeOthers
  • Location
    • SECTOR 08
    • VILLAGE DAPOLI NODE PUSHPAK
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052565
  • ReraGenie IDRG-MH-06245

Builder

  • NameSANKALP GROUP
  • Entity typePartnership
  • PartnersKIRAN SUKHADEO JARE, POOJA KIRAN JARE
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredSep 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

42%55 of 130 units booked
74.2%Work done, per cost certificate

Figures as on 12 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATHARVA SANKALPNA13119436130

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

ATHARVA SANKALP: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor50%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90

Land and ownership28

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,658 sq m
Land owned byThe promoter, with other names on the file
Named landowners28
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2024
LandownerVillageDistrict
Ashok Vitthal PatilPanvelRaigarh
Anil Vitthal PatilPargaonRaigarh
Kishor Vitthal PatilPargaonRaigarh
Prakash Harichandra PatilPargaonRaigarh
Neha Vinod MhatrePargaonRaigarh
Reema Surendra JitekarPargaonRaigarh
Lekha Vikas PatilPargaonRaigarh
Nikita Vikas PatilPargaonRaigarh
Prathamesh Vikas PatilPargaonRaigarh
Manohar Harishchandra PatilPargaonRaigarh
Sulochana Vaman PatilPargaonRaigarh
Deepak Vaman PatilNew PanvelRaigarh
Pramila Sudhakar RautNew PanvelRaigarh
Mohan Ramchandra PatilPanvelRaigarh
Sunil Ramchandra PatilPargaonRaigarh
Jagruti Jagdish PatilPargaonRaigarh
Vidya Dattatrey PatilPargaonRaigarh
Namrata Dattatrey PatilPargaonRaigarh
Dipti Dattatrey PatilPargaonRaigarh
Janhavi Manish GhadiPargaonRaigarh
Anuradha Dattatrey PatilPargaonRaigarh
Ranjana Urf Manjiri Madhukar MaydeMurud Janjira (M Cl)Raigarh
Sadhana urf Sayali Sunil DarneUranRaigarh
Shrikrushna Harishchandra PatilUranRaigarh
Sapana urf Swapnali Sanjay TekalkarPanvelRaigarh
Hemalata Chandrakant PatilPanvelRaigarh
Vimal urf Sunita Satyawan PatilPanvelRaigarh
Hemlata Vikas PatilPanvelRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra (CIDCO)
Permissible FSI3188.6
Proposed, not sanctioned3,189 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLOOR AMARANTE SHOP NO 12 AND 13 PLOT NO 4 SECTOR 9 E KALAMBOLI NAVI MUMBAI 410218
Estimated costRs 19.69 cr
Cost incurredRs 14.60 cr
Work done74.17%
BuildingWingEstimatedIncurred
ATHARVA SANKALPNARs 15.26 crRs 11.73 cr
-NARs 4.43 crRs 2.87 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDISHA ARCHITECTS
EngineerADHARSHILA CONSULTANTS
EngineerSuneel Kumar
Chartered AccountantAKORD & CO
Chartered AccountantGANESH HADVALE & ASSOCIATES
Chartered AccountantRUPESH GUNJAL & ASSOCIATES
Chartered AccountantPRATIK KOKATE
PartnerRole in project
SANKALP GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1(Signed).pdf12 Aug 2026
Withdrawal Update Form 2File: FORM-2-Q1-2026-27-signed.pdf12 Aug 2026
Withdrawal Update Form 3File: Form3-Q1-2026-27 -signed.pdf12 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf22 May 2026
Withdrawal Update Form 1File: Form 1 Q4 FY 25-26.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 25-26.pdf6 May 2026
Withdrawal Update Form 3File: FORM 3 Q4 FY 25-26.pdf6 May 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf28 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A (4).pdf8 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A (4).pdf8 Apr 2026
Withdrawal Update Form 1File: Fianl Form 1 Q3.pdf27 Mar 2026
Withdrawal Update Form 2File: Final Form 2 Q3.pdf27 Mar 2026
Withdrawal Update Form 3File: Q3 Form 3 Final.pdf27 Mar 2026
Form 5 (FY 2023-2024)File: Final Form 5.pdf10 Feb 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (Signed).pdf22 Dec 2025
Withdrawal Update Form 2File: ATHARVA SANKALP FORM 2(signed) (1).pdf22 Dec 2025
Withdrawal Update Form 3File: Rera Form 3 signed.pdf22 Dec 2025
Withdrawal Update Form 1File: Final_Form 1_Q1_FY 2025-26_Atharva Sankalp.pdf11 Nov 2025
Withdrawal Update Form 1File: Final_Form 1_Q1_FY 2025-26_Atharva Sankalp.pdf11 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf11 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf11 Nov 2025
Withdrawal Update Form 3File: From 3 For June-25_Sankalp Plot 127.pdf11 Nov 2025
Withdrawal Update Form 3File: From 3 For June-25_Sankalp Plot 127.pdf11 Nov 2025
Form 1File: Form 1_Q4 MAR-25.pdf7 Jul 2025
Form 2File: Form 2_Q4 MAR-25.pdf7 Jul 2025
Form 3File: form 3.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold _Booked Inventory_Final_organized.pdf7 Jul 2025
OthersFile: Other Declarations.pdf7 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold _Booked Inventory_Final_organized.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4 MAR-24.pdf3 May 2025
CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4 MAR-24.pdf14 Apr 2025
Details of encumbrances concerned to FinanceFile: Financial and legal Encumbrance position on 31_3_2025.pdf12 Apr 2025
CERSAI detailsFile: Undertaking Relating To Cersai.pdf12 Apr 2025
Details of encumbrances concerned to LegalFile: Financial and legal Encumbrance position on 31_3_2025.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 CA Certificate _compressed.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Annexure B - Disclosure of Sold unsold inventory_Revised.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q3 Dec_24.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Q3_Dec 24.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Sep_24.pdf25 Jan 2025
Details of encumbrances concerned to FinanceFile: Annexure K- Encumbrance Concerned to Finance and Legal.pdf23 Jan 2025
CERSAI detailsFile: Annexure G-Asset Based Declaration (1) (1).pdf23 Jan 2025
CERSAI detailsFile: Annexure L - Debtor Based Declaration (1).pdf23 Jan 2025
Details of encumbrances concerned to LegalFile: Annexure K- Encumbrance Concerned to Finance and Legal.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2_Sep_24.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Discloure of Sold Booked Inventory Jun 24.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Discloure of Sold Booked Inventory Sep 24.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SEP 24.pdf21 Dec 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance concerned to Legal and Finance.pdf19 Dec 2024
CERSAI detailsFile: Asset Based Declaration.pdf19 Dec 2024
CERSAI detailsFile: Debtor based declaration.pdf19 Dec 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance concerned to Legal and Finance.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form 5.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JUN-24.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 June 2024_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 JUN-24.pdf17 Oct 2024
Layout approvalFile: Layout_17052024_Compressed.pdf3 Jul 2024
Building plan approvalFile: Layout_17052024_Compressed.pdf3 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout_17052024_Compressed.pdf3 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Layout_17052024_Compressed.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: From 2A_FY 23-24.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold unsold .pdf27 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 2A.pdf27 Jun 2024
Building plan approvalFile: CC_17052024.pdf17 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: CC_17052024.pdf17 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_17052024.pdf17 Jun 2024
Declaration about Commencement CertificateFile: Declaration of CC_Amended CC.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sept 23.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Feb 24.pdf17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Feb-24.pdf7 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep-23.pdf7 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Feb-24.pdf7 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Sept-23_compressed.pdf7 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Feb-24.pdf7 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Acc.pdf7 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Sept-23.pdf6 Apr 2024
Declaration about Commencement CertificateFile: Declaration of CC_Revised.pdf9 Aug 2023
Declaration in FORM BFile: Form B_Final Revised_Before Me Notzised.pdf9 Aug 2023

How this compares with Raigarh

42%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATHARVA SANKALP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE DAPOLI NODE PUSHPAK5,900+ in Raigarh

2 kmATHARVA SANKALPCompleted 9Lapsed / revoked 10Other 107Dot size: filed unitsN

Filed coordinates, straight-line distance. 126 registered projects within 2 km.

Builder: SANKALP GROUP

SANKALP GROUP has 3 registrations on MahaRERA, including RIDDHI SIDDHI HEIGHTS and Sai Sankalp. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ATHARVA SANKALP is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATHARVA SANKALP?

The registered promoter entity is SANKALP GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATHARVA SANKALP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATHARVA SANKALP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATHARVA SANKALP?

The professionals named in the filing: Architect: DISHA ARCHITECTS; Engineer: ADHARSHILA CONSULTANTS; Engineer: Suneel Kumar; Chartered Accountant: AKORD & CO; Chartered Accountant: GANESH HADVALE & ASSOCIATES; Chartered Accountant: RUPESH GUNJAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHARVA SANKALP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHARVA SANKALP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHARVA SANKALP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.