Registration lapsed No litigation declared Others project

ATHARVA NAGARI V

By ATHARVA INFRASTRUCTURES

RG-MH-94534 · RERA P50500021779 · Last updated on MahaRERA portal: 30 May 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 39 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 12 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jul 2023Possession promised39 months past this date
22 of 44Construction stages doneacross 4 buildings; furthest along: Sanitary Fittings within the flats /..., 80%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

ATHARVA NAGARI V is a Others project by ATHARVA INFRASTRUCTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500021779 on 29 Jul 2019. Possession was promised by 31 Jul 2023 and is now 39 months past that date.

At a glance

Project

  • NameATHARVA NAGARI V
  • TypeOthers
  • Location
    • BESA PIPLA ROAD
    • PIPLA
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500021779
  • ReraGenie IDRG-MH-94534

Builder

  • NameATHARVA INFRASTRUCTURES
  • Entity typePartnership
  • PartnersMANOJ BABURAO SURAMWAR, NARENDRA SHANKARRAO MALLELWAR, RAJU BALAJI CHANNAWAR, GOPAL MAROTI WAGHMARE, RAHUL BANDOPANT MALLELWAR
  • Other registrations9 more →
  • Completed7 of 10
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

39 months past promisethis monthRegisteredJul 2019PromisedJul 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jul 2019
  • Promised completion31 Jul 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA130000
BUILDING BNA130000
BUILDING CNA130000
BUILDING DNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

BUILDING A75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
BUILDING B75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
BUILDING C75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
BUILDING D56%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 30 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68
BuildingClosed/CoveredTotal
BUILDING A2222
BUILDING B2323
BUILDING C2323

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,162 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
KISHOR HANSRAJ JHAMNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI12444.11
Proposed, not sanctioned12,444 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCIVIL LINES NAGPUR

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH JAISWAL
PartnerRole in project
ATHARVA INFRASTRUCTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Feb 2023

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION.pdf30 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nagari V ABC release letter.pdf13 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nagari V D release letter.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 30-9-21.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 31-12-21.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 31-3-22.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 30-6-22.pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 SEPT 21.pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 dec 21.pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 MARCH 22.pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 june 22.pdf11 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Nagari v march 22.pdf11 Feb 2023
Certificates of CA (Form 3)File: 1 SEPT 21.pdf11 Feb 2023
Certificates of CA (Form 3)File: 2 DEC 21.pdf11 Feb 2023
Certificates of CA (Form 3)File: 3 MARCH 22.pdf11 Feb 2023
Certificates of CA (Form 3)File: 4 JUNE 22.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NAGARI V 21-22.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NAGARI V 19-20.pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NAGARI V 20-21.pdf30 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NAGARI 5 30062021.pdf15 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER NAGARI 5 JUNE 2021.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: rera atharva 5 (NO2).pdf15 Aug 2021
Certificates of CA (Form 3)File: CA CERTIFICATE 2020 NAGRI V.pdf15 Aug 2021
Layout approvalFile: scan551.pdf19 Jul 2019
Details of encumbrancesFile: ENCUMBRENCE ATHARVA.pdf19 Jul 2019
Details of encumbrancesFile: encumbrance certificate.pdf19 Jul 2019
Copy of Layout Approval (in case of layout)File: scan551.pdf19 Jul 2019
Declaration in FORM BFile: FORM B ATHARVA.pdf19 Jul 2019
Certificates of CA (Form 3)File: CA CERTIFICATE ATHARVA FINAL.pdf19 Jul 2019
Proforma of Allotment letterFile: Draft Agreement for RERA corrected 18-07-2019.pdf19 Jul 2019
Building plan approvalFile: 001.pdf18 Jul 2019
Building plan approvalFile: 002.pdf18 Jul 2019
Building plan approvalFile: 003.pdf18 Jul 2019
Building plan approvalFile: 004.pdf18 Jul 2019
Building plan approvalFile: 005.pdf18 Jul 2019
Building plan approvalFile: 006.pdf18 Jul 2019
Building plan approvalFile: 007.pdf18 Jul 2019
Building plan approvalFile: 008.pdf18 Jul 2019
Building plan approvalFile: 009.pdf18 Jul 2019
Building plan approvalFile: 010.pdf18 Jul 2019
Building plan approvalFile: 011.pdf18 Jul 2019
Copy of the legal title reportFile: SEARCH REPORT FINAL.pdf18 Jul 2019
Building Plan Approval (IOD)File: 001.pdf18 Jul 2019
Building Plan Approval (IOD)File: 002.pdf18 Jul 2019
Building Plan Approval (IOD)File: 003.pdf18 Jul 2019
Building Plan Approval (IOD)File: 004.pdf18 Jul 2019
Building Plan Approval (IOD)File: 005.pdf18 Jul 2019
Building Plan Approval (IOD)File: 006.pdf18 Jul 2019
Building Plan Approval (IOD)File: 007.pdf18 Jul 2019
Building Plan Approval (IOD)File: 008.pdf18 Jul 2019
Building Plan Approval (IOD)File: 009.pdf18 Jul 2019
Building Plan Approval (IOD)File: 010.pdf18 Jul 2019
Building Plan Approval (IOD)File: 011.pdf18 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Binder1.pdf18 Jul 2019
OtherFile: Kishor jham declaration.pdf18 Jul 2019

Promoter's earlier projects12

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

12 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ATHARVA NAGARI VKH NO 155 1 BESIDED ATHARVA NAGARI II BESA PIPLA ROAD PIPLA158CompletedJul 2022Nov 2021
ATHARVA NAGARI IIIPIPLA160CompletedJul 2022Sep 2021
ATHARVA VILLAMENTAT PIPLA NAGPUR RURAL DISTRICT12CompletedSep 2019Oct 2018
ATHARVA FORTUNEPIPLA28CompletedSep 2019Dec 2018
ATHARVA CASTLEAT PIPLA TAH NAGPUR RURAL DISTRICT NAGPUR24CompletedSep 2019Oct 2018
ATHARVA NAGARI IVP NO R3 & R6 AT PIPLA TAH NAGPUR RURAL DIST NAGPUR64CompletedDec 2018Oct 2018
ATHARVA HERITAGEAT PIPLA TAH NAGPUR RURALDIST NAGPUR127CompletedApr 2017Apr 2017
ATHARVA RIVIERAAT PIPLA TAHA NAGPUR GRAMIN DIST NAGPUR55CompletedMay 2015May 2015
ATHARVA PRIDEAT PIPLA TAH NAGPUR RURAL DIST NAGPUR40CompletedMay 2015May 2015
ATHARVA FLORAAT PIPLA TAH NAGPUR GRAMIN DIST NAGPUR40CompletedMay 2015May 2015
ATHARVA EXOTICAAT PIPLA TAHA NAGPUR GRAMIN DIST NAGPUR24CompletedMay 2015May 2015
ATHARVA EMERALDAT PIPLA TAH NAGPUR RURALDIST NAGPUR30CompletedMay 2015May 2015

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATHARVA NAGARI V on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIPLA2,800+ in Nagpur

2 kmATHARVA NAGARI VCompleted 20Lapsed / revoked 15Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 67 registered projects within 2 km.

Builder: ATHARVA INFRASTRUCTURES

ATHARVA INFRASTRUCTURES has 10 registrations on MahaRERA, including ATHARVA NAGARI IV and ATHARVA VILLAMENTS. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that ATHARVA NAGARI V shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ATHARVA NAGARI V is delayed beyond 31 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATHARVA NAGARI V?

The registered promoter entity is ATHARVA INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATHARVA NAGARI V?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATHARVA NAGARI V?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATHARVA NAGARI V?

The professionals named in the filing: Architect: RAJESH JAISWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHARVA NAGARI V?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHARVA NAGARI V. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHARVA NAGARI V to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.