ATHARVA NAGARI V
RG-MH-94534 · RERA P50500021779 · Last updated on MahaRERA portal: 30 May 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 39 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 12 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ATHARVA NAGARI V is a Others project by ATHARVA INFRASTRUCTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500021779 on 29 Jul 2019. Possession was promised by 31 Jul 2023 and is now 39 months past that date.
At a glance
Project
- NameATHARVA NAGARI V
- TypeOthers
- Location
- BESA PIPLA ROAD
- PIPLA
- Nagpur (Rural)
- Nagpur
- 440034
- Pincode440034
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500021779
- ReraGenie IDRG-MH-94534
Builder
- NameATHARVA INFRASTRUCTURES
- Entity typePartnership
- PartnersMANOJ BABURAO SURAMWAR, NARENDRA SHANKARRAO MALLELWAR, RAJU BALAJI CHANNAWAR, GOPAL MAROTI WAGHMARE, RAHUL BANDOPANT MALLELWAR
- Other registrations9 more →
- Completed7 of 10
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects12 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jul 2019
- Promised completion31 Jul 2023
- Revised completionNone
- Buildings4 building records
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 13 | 0 | 0 | 0 | 0 |
| BUILDING B | NA | 13 | 0 | 0 | 0 | 0 |
| BUILDING C | NA | 13 | 0 | 0 | 0 | 0 |
| BUILDING D | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 30 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
BUILDING A75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
BUILDING B75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
BUILDING C75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
BUILDING D56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 30 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING A | 22 | 22 |
| BUILDING B | 23 | 23 |
| BUILDING C | 23 | 23 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KISHOR HANSRAJ JHAM | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJESH JAISWAL |
| Partner | Role in project |
|---|---|
| ATHARVA INFRASTRUCTURES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jul 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Jul 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Feb 2023
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION.pdf | 30 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nagari V ABC release letter.pdf | 13 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nagari V D release letter.pdf | 13 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 30-9-21.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 31-12-21.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 31-3-22.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 30-6-22.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 SEPT 21.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 dec 21.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 MARCH 22.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 june 22.pdf | 11 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Nagari v march 22.pdf | 11 Feb 2023 |
| Certificates of CA (Form 3)File: 1 SEPT 21.pdf | 11 Feb 2023 |
| Certificates of CA (Form 3)File: 2 DEC 21.pdf | 11 Feb 2023 |
| Certificates of CA (Form 3)File: 3 MARCH 22.pdf | 11 Feb 2023 |
| Certificates of CA (Form 3)File: 4 JUNE 22.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: NAGARI V 21-22.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NAGARI V 19-20.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NAGARI V 20-21.pdf | 30 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NAGARI 5 30062021.pdf | 15 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER NAGARI 5 JUNE 2021.pdf | 15 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: rera atharva 5 (NO2).pdf | 15 Aug 2021 |
| Certificates of CA (Form 3)File: CA CERTIFICATE 2020 NAGRI V.pdf | 15 Aug 2021 |
| Layout approvalFile: scan551.pdf | 19 Jul 2019 |
| Details of encumbrancesFile: ENCUMBRENCE ATHARVA.pdf | 19 Jul 2019 |
| Details of encumbrancesFile: encumbrance certificate.pdf | 19 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: scan551.pdf | 19 Jul 2019 |
| Declaration in FORM BFile: FORM B ATHARVA.pdf | 19 Jul 2019 |
| Certificates of CA (Form 3)File: CA CERTIFICATE ATHARVA FINAL.pdf | 19 Jul 2019 |
| Proforma of Allotment letterFile: Draft Agreement for RERA corrected 18-07-2019.pdf | 19 Jul 2019 |
| Building plan approvalFile: 001.pdf | 18 Jul 2019 |
| Building plan approvalFile: 002.pdf | 18 Jul 2019 |
| Building plan approvalFile: 003.pdf | 18 Jul 2019 |
| Building plan approvalFile: 004.pdf | 18 Jul 2019 |
| Building plan approvalFile: 005.pdf | 18 Jul 2019 |
| Building plan approvalFile: 006.pdf | 18 Jul 2019 |
| Building plan approvalFile: 007.pdf | 18 Jul 2019 |
| Building plan approvalFile: 008.pdf | 18 Jul 2019 |
| Building plan approvalFile: 009.pdf | 18 Jul 2019 |
| Building plan approvalFile: 010.pdf | 18 Jul 2019 |
| Building plan approvalFile: 011.pdf | 18 Jul 2019 |
| Copy of the legal title reportFile: SEARCH REPORT FINAL.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 001.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 002.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 003.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 004.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 005.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 006.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 007.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 008.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 009.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 010.pdf | 18 Jul 2019 |
| Building Plan Approval (IOD)File: 011.pdf | 18 Jul 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Binder1.pdf | 18 Jul 2019 |
| OtherFile: Kishor jham declaration.pdf | 18 Jul 2019 |
Promoter's earlier projects12
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ATHARVA NAGARI V | KH NO 155 1 BESIDED ATHARVA NAGARI II BESA PIPLA ROAD PIPLA | 158 | Completed | Jul 2022 | Nov 2021 |
| ATHARVA NAGARI III | PIPLA | 160 | Completed | Jul 2022 | Sep 2021 |
| ATHARVA VILLAMENT | AT PIPLA NAGPUR RURAL DISTRICT | 12 | Completed | Sep 2019 | Oct 2018 |
| ATHARVA FORTUNE | PIPLA | 28 | Completed | Sep 2019 | Dec 2018 |
| ATHARVA CASTLE | AT PIPLA TAH NAGPUR RURAL DISTRICT NAGPUR | 24 | Completed | Sep 2019 | Oct 2018 |
| ATHARVA NAGARI IV | P NO R3 & R6 AT PIPLA TAH NAGPUR RURAL DIST NAGPUR | 64 | Completed | Dec 2018 | Oct 2018 |
| ATHARVA HERITAGE | AT PIPLA TAH NAGPUR RURALDIST NAGPUR | 127 | Completed | Apr 2017 | Apr 2017 |
| ATHARVA RIVIERA | AT PIPLA TAHA NAGPUR GRAMIN DIST NAGPUR | 55 | Completed | May 2015 | May 2015 |
| ATHARVA PRIDE | AT PIPLA TAH NAGPUR RURAL DIST NAGPUR | 40 | Completed | May 2015 | May 2015 |
| ATHARVA FLORA | AT PIPLA TAH NAGPUR GRAMIN DIST NAGPUR | 40 | Completed | May 2015 | May 2015 |
| ATHARVA EXOTICA | AT PIPLA TAHA NAGPUR GRAMIN DIST NAGPUR | 24 | Completed | May 2015 | May 2015 |
| ATHARVA EMERALD | AT PIPLA TAH NAGPUR RURALDIST NAGPUR | 30 | Completed | May 2015 | May 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ATHARVA NAGARI V on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PIPLA2,800+ in Nagpur
Filed coordinates, straight-line distance. 67 registered projects within 2 km.
BHEDE NAGARI -CHARITON
DILIP GANPATRAO BHEDE
Godrej Orchard Estate
Godrej Properties Limited
MELBOURNE CITY
M/S 4 PILLARS REALTY
GARDEN HOMES ATHARVA NAGARI VII
ATHARVA INFRASTRUCTURES
ROYAL EMPIRE
M B INFRA
Ved Vidhi Ventures
Ved Vidhi Ventures
See every Nagpur project, with the district possession charts
Builder: ATHARVA INFRASTRUCTURES
ATHARVA INFRASTRUCTURES has 10 registrations on MahaRERA, including ATHARVA NAGARI IV and ATHARVA VILLAMENTS. Its filings disclose 12 earlier MahaRERA projects: declares 12 of 12 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that ATHARVA NAGARI V shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ATHARVA NAGARI V is delayed beyond 31 Jul 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ATHARVA NAGARI V?
The registered promoter entity is ATHARVA INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ATHARVA NAGARI V?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ATHARVA NAGARI V?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ATHARVA NAGARI V?
The professionals named in the filing: Architect: RAJESH JAISWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATHARVA NAGARI V?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback