Home / Browse projects / Sangli, Maharashtra / ATHARVA CITY
ATHARVA CITY
RG-MH-22272 · RERA P53100030842 · Last updated on MahaRERA portal: 11 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ATHARVA CITY is a Others project by GHEWAREAWATEASSOCIATES in Sangli, Maharashtra, registered with MahaRERA as P53100030842 on 20 Sep 2021. Possession is promised by 31 Dec 2026.
At a glance
Project
- NameATHARVA CITY
- TypeOthers
- Location
- AKASHWANI ROAD
- NEAR AKASHWANI
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100030842
- ReraGenie IDRG-MH-22272
Builder
- NameGHEWAREAWATEASSOCIATES
- Entity typePartnership
- PratnerMOHAN BASAPPA AMBOLE
- PartnerRajesh Kallappa Awate
- PartnerMAHESH KALLAPPA AWATE
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Sep 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings4 building records
- Documents filed123 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A1 | NA | 9 | 0 | 0 | 0 | 0 |
| WING A2 | NA | 9 | 0 | 0 | 0 | 0 |
| WING B1 | NA | 8 | 0 | 0 | 0 | 0 |
| WING B2 | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Stilt Floor, at 90%.
WING A134%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING A213%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 24% |
| Podiums (if any) | 0% |
| Plinth | 24% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B113%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 24% |
| Podiums (if any) | 0% |
| Plinth | 24% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B213%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 24% |
| Podiums (if any) | 0% |
| Plinth | 24% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A1 | 1 | 1 |
| WING A2 | 1 | 1 |
| WING B1 | 1 | 1 |
| WING B2 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SACHIN KANOJE |
| Engineer | MAHESH AWATE |
| Chartered Accountant | NIKHIL NAVANDHAR |
| Partner | Role in project |
|---|---|
| GHEWAREAWATEASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed123
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Architect completion certificate .pdf | 11 Jul 2026 |
| Form 2File: Form 2 engineers certificate compressed.pdf | 11 Jul 2026 |
| Form 3File: CA compressed april to june.pdf | 11 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold booked inventory may to june.pdf | 11 Jul 2026 |
| Form 2A (FY 2021-2022)File: Engineer quality 2A certificate compressed.pdf | 11 Jul 2026 |
| Form 2A (FY 2022-2023)File: QUALITY ASSURANCE_compressed.pdf | 11 Jul 2026 |
| Form 2A (FY 2023-2024)File: QUALITY ASSURANCE_compressed.pdf | 11 Jul 2026 |
| Form 2A (FY 2024-2025)File: QA 16126.pdf | 11 Jul 2026 |
| Form 2A (FY 2025-2026)File: QA 16126.pdf | 11 Jul 2026 |
| Form 1File: Ac10426.pdf | 10 Apr 2026 |
| Form 2File: EC10426_compressed.pdf | 10 Apr 2026 |
| Form 3File: CA10426_compressed.pdf | 10 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: SI10426.pdf | 10 Apr 2026 |
| OthersFile: QA10426.pdf | 10 Apr 2026 |
| Form 1File: Ac 17126.pdf | 20 Jan 2026 |
| Form 2File: EA 16126.pdf | 20 Jan 2026 |
| Form 3File: CA 17126_compressed.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sold 16126.pdf | 20 Jan 2026 |
| OthersFile: QA 16126.pdf | 20 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate (1).pdf | 15 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 15 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf | 15 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold inventory (1).pdf | 15 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QA certificate .pdf | 15 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 2025.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate 2025.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate 2025.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality assurance 2025.pdf | 14 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold inventory 2025.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 12 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 12 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE.pdf | 12 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventary.pdf | 12 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 12 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual CA report.pdf | 12 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf | 12 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 12 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf | 12 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: sold inventary.pdf | 12 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSURANCE.pdf | 12 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual CA report.pdf | 12 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE (2).pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (2)_compressed.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (2)_compressed.pdf | 9 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE (2).pdf | 9 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf | 9 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (3)_compressed.pdf | 9 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (3)_compressed.pdf | 9 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE (2).pdf | 12 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_compressed.pdf | 12 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE_compressed.pdf | 12 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTARY_compressed.pdf | 12 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (2)_compressed.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 10 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 10 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER'S QA CERTICATE.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 10 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate 12102023.pdf | 18 Oct 2023 |
| Other - LegalFile: APPLICATION FOR CORRECTION FORMAT C FINAL.pdf | 18 Oct 2023 |
| Building plan approvalFile: MUN dwg1.pdf | 11 Oct 2023 |
| Building plan approvalFile: mun dwg 2.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: MUN dwg1.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: mun dwg 2.pdf | 11 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: building permission certificate REVISED.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineers certificate.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold 30092023.pdf | 11 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 3 30-Sept-2023 6-14 pm.pdf | 1 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 1 30-Sept-2023 6-12 pm.pdf | 1 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2 30-Sept-2023 6-13 pm.pdf | 1 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: fORM 5 22-23 merged.pdf | 1 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2023_07_10 13_35 Office Lens.pdf | 10 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2023_07_10 14_07 Office Lens.pdf | 10 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2023_07_10 14_07 Office Lens (1).pdf | 10 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold_book3d inventory.pdf | 10 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 10 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 13042023.pdf | 19 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE -12042023.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE- 10042023.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf | 19 Apr 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Atharav Luxuria | By pass road, Sangli 416416 | 85 | Completed | Apr 2015 | Mar 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 123 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ATHARVA CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR AKASHWANI790+ in Sangli
Filed coordinates, straight-line distance. 36 registered projects within 2 km.
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: GHEWAREAWATEASSOCIATES
GHEWAREAWATEASSOCIATES has 1 registration on MahaRERA, including ATHARVA CITY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if ATHARVA CITY is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ATHARVA CITY?
The registered promoter entity is GHEWAREAWATEASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ATHARVA CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ATHARVA CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ATHARVA CITY?
The professionals named in the filing: Architect: SACHIN KANOJE; Engineer: MAHESH AWATE; Chartered Accountant: NIKHIL NAVANDHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ATHARVA CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback