Home / Browse projects / Mumbai Suburban, Maharashtra / at

Completed No litigation declared Commercial project

at

By AGM VIJAYLAXMI VENTURE LLP

RG-MH-29201 · RERA P51800028274 · Last updated on MahaRERA portal: 17 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

at is a Commercial project by AGM VIJAYLAXMI VENTURE LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028274 on 18 Feb 2021. The registration is recorded completed; possession was promised by 30 Jun 2027.

At a glance

Project

  • Nameat
  • TypeCommercial
  • Location
    • MAHAKALI CAVES ROAD
    • ANDHERI EAST
    • Andheri
    • Mumbai Suburban
    • 400093
  • Pincode400093
  • RERA no.P51800028274
  • ReraGenie IDRG-MH-29201

Builder

  • NameAGM VIJAYLAXMI VENTURE LLP
  • Entity typeOthers
  • PartnersANIL BIJAYRAJ BHANDARI, VIKASH SHANTILAL KAWAR
  • Named personsAGM SPACES LLP, VIJAYLAXMI DEVELOPERS & SECURITIES PRIVATE LIMITED, SACHIN RAGHU POOJARI, MANGESH VIRENDRA TIWARI
  • Declared earlier projects5 →

Key dates

this monthRegisteredFeb 2021PromisedJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Feb 2021
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AGM VIJAYLAXMI VENTURE LLPNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

AGM VIJAYLAXMI VENTURE LLP: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 17 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed197

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots197
Closed/Covered197

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,160 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
AGM VIJAYLAXMI VENTURE LLPAndheriMumbai Suburban
MAHAL DIE CAST & ELECTRIC PVT LTDAndheriMumbai Suburban

Approvals and building plan

Permissible FSI11663.0
Proposed, not sanctioned9,739 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAhura Centre, 3rd Floor Mahakali Caves Road Andheri East Mumbai Maharashtra 400093

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPUSHKAR CONSULTANTS
EngineerM R PATIL CONSULTING ENGINEERS PVT LTD
Chartered AccountantSHAH &TAPARIA
PartnerRole in project
AGM VIJAYLAXMI VENTURE LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 May 2024

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 f y 23-24.pdf17 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC copy.pdf2 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pushkar Consultants.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arham Mar 24.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 24.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate.pdf18 Jan 2024
OtherFile: Clarrification - at.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf10 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pushkar Arch.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chartered Account's Certificate.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pushkar - Certificate (1)-1.pdf28 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARHAM FORM 2-1.pdf28 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure.pdf28 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Apr 2023
Other - TechnicalFile: Arham Form -2A-2.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5- Old Format (1).pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - 18 02 21 TO 31 03 21.pdf28 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - AGM V V LLP.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - 01 04 21 TO 31 03 22.pdf23 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: full CC.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Form 2.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CHARTERED ACCOUNTANT'S CERTIFICATE.pdf4 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rera.pdf28 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf21 Jul 2022
OtherFile: RERA CLARIFICATION _compressed.pdf11 Jun 2022
OtherFile: Clarification letter RERA.pdf10 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf2 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf26 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf26 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf11 Feb 2022
Details of encumbrancesFile: Declaration for Encumbrances.pdf22 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf22 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate_compressed.pdf22 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Dec 2021_compressed.pdf22 Jan 2022
Proforma of Allotment letterFile: draft agreement for sale.pdf22 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final AGM Vijay Laxmi Venture LLP .pdf24 Dec 2021
Disclosure of sold/ booked inventoryFile: disclosure dec 21.pdf23 Dec 2021
Declaration about Commencement CertificateFile: Declaration about Commencemnt certificate.pdf15 Dec 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold at project.pdf15 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 873-Rera Certificate.pdf27 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf27 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf27 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Nov 2021
Declaration about Commencement CertificateFile: Declation of CC.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2 A.pdf23 Aug 2021
Disclosure of sold/ booked inventoryFile: Declation of CC - Disclosure of Sold.pdf23 Aug 2021
Building plan approvalFile: Building Approval Plan_Page_1.pdf12 Feb 2021
Building plan approvalFile: Building Approval Plan_Page_2.pdf12 Feb 2021
Building plan approvalFile: Building Approval Plan_Page_3.pdf12 Feb 2021
Building plan approvalFile: Building Approval Plan_Page_4.pdf12 Feb 2021
Layout approvalFile: Layout Approval Plan_Page_1.pdf12 Feb 2021
Layout approvalFile: Layout Approval Plan_Page_2.pdf12 Feb 2021
Layout approvalFile: Layout Approval Plan_Page_3.pdf12 Feb 2021
Layout approvalFile: Layout Approval Plan_Page_4.pdf12 Feb 2021
Layout approvalFile: layout approval plan page 5.pdf12 Feb 2021
Layout approvalFile: Layout Approval Plan_Page_6.pdf12 Feb 2021
Layout approvalFile: Layout Approval Plan_Page_7.pdf12 Feb 2021
Layout approvalFile: Layout Approval Plan_Page_8.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout Approval Plan_Page_1.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout Approval Plan_Page_2.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout Approval Plan_Page_3.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout Approval Plan_Page_4.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: layout approval plan page 5.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout Approval Plan_Page_6.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout Approval Plan_Page_7.pdf12 Feb 2021

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SWAPNAPOORTICTS NO 145 MAJAS VILLAGGE JOGESHWARI EAST MUMBAI 400060200CompletedDec 2019Dec 2019
VIJAYLAXMI BLISSVIJAYLAXMI BLISS JVLR ROAD JOGESHWARI EAST82CompletedDec 2017Dec 2017
THE VINAYAKCTS NO 33 GAJANAN COLONY ROAD GOREGAON WEST MUMBAI 40010421CompletedJul 2017Jul 2017
SPAN VALENCIANEAR GCC CLUB ADJACENT TO AKRUTI GARDENIA MIRA ROAD EAST THANE92CompletedDec 2015Dec 2015
INIZIOCTS NO 479 OPP P G PLAZA CHAKALA ANDHERI EAST MUMBAI 40009962CompletedJun 2012Jun 2012

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep at on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI EAST6,700+ in Mumbai Suburban

Builder: AGM VIJAYLAXMI VENTURE LLP

AGM VIJAYLAXMI VENTURE LLP has 1 registration on MahaRERA, including at. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if at is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of at?

The registered promoter entity is AGM VIJAYLAXMI VENTURE LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in at?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for at?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at at?

The professionals named in the filing: Architect: PUSHKAR CONSULTANTS; Engineer: M R PATIL CONSULTING ENGINEERS PVT LTD; Chartered Accountant: SHAH &TAPARIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in at?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About at. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save at to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.