Completed No litigation declared Residential / Group Housing project

Astonia Royale Phase II - K and L Building

By AMIT ENTERPRISES HOUSING LIMITED

RG-MH-09197 · RERA P52100001124 · Last updated on MahaRERA portal: 31 Jul 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 45 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 98%
19 of 165Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

Astonia Royale Phase II - K and L Building is a Residential / Group Housing project by AMIT ENTERPRISES HOUSING LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100001124 on 26 Jul 2017. The registration is recorded completed; possession was promised by 30 Sep 2025. The completion date has moved by 45 months from the original filing. 146 of the 165 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameAstonia Royale Phase II - K and L Building
  • TypeResidential / Group Housing
  • Location
    • Katraj Highway
    • Ambegaon Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001124
  • ReraGenie IDRG-MH-09197

Builder

  • NameAMIT ENTERPRISES HOUSING LIMITED
  • Entity typeCompany
  • CINU45200PN2008PLC131731
  • GSTIN27AAGCA9192A1ZP
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • ChairpersonKISHOR GOVIND PATE
  • Other registrations7 more →
  • Completed3 of 8
  • Past their filed date1
  • Declared earlier projects10 →

Key dates

this monthRegisteredJul 2017First promiseDec 2021Revised toSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jul 2017
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Dec 2021)
  • Buildings1 building record
  • Documents filed116 files

Current status

88%146 of 165 units booked

Figures as on 31 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building K LNA25211650165

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

Building K L: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises56%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.81%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 31 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes90%

Parking filed184

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots184
Closed/Covered114
Open Space70

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,429 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI10878.69
Proposed, not sanctioned10,879 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGhole Road, Shivaji Nagar Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Manoj Tatooskar
EngineerMr. Umesh Joshi
Chartered AccountantSSAP & Associates LLP
Chartered AccountantDharini Naswa & Associates
PartnerRole in project
AMIT ENTERPRISES HOUSING LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005536Dec 2021 → Dec 2022

Reason as filed by the promoterAcute economic crisis in the real estate market.

EXT52100018186Dec 2021 → Mar 2025

Reason as filed by the promoterWe encountered significant challenges in completing the project within the stipulated timeline, primarily due to sluggish market conditions and a downturn in the real estate sector. The economic crises resulting from these factors impeded the progress of sale transactions, creating a substantial impact on the project's cash flow. Just as market conditions were showing signs of improvement, the emergence of the Covid-19 outbreak led to a massive downturn, further disrupting the project's financial stability. Consequently, the construction project experienced a considerable delay, causing moneta

EXT52100027765Dec 2021 → Sep 2025

Reason as filed by the promoterWe encountered significant challenges in completing the project within the stipulated timeline, primarily due to sluggish market conditions and a downturn in the real estate sector. These economic crises impeded the progress of sale transactions, substantially impacting the project's cash flow. Just as market conditions began to show signs of improvement, the emergence of the Covid-19 outbreak led to a massive downturn, further disrupting the project's financial stability. Consequently, the construction project experienced considerable delays, causing monetary distress. Throughout these challe

Litigation declared1

CaseCourtStatus
112/2016District and Session Court PuneArgument on Exhibit

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Astonia Royale K-L Building Completion Certificate.pdf31 Jul 2025
Form 1File: Form 1 Architect Certificate Astonia Royale K-L Building.pdf9 Jul 2025
Form 2File: Royale KL Form 2.pdf9 Jul 2025
Form 3File: Form 3 - Astonia Royale KL Bld.pdf9 Jul 2025
Disclosure of Sold and Booked InventoryFile: Astonia Rpyale - K L Bld.pdf9 Jul 2025
Certificates of CA (Form 3)File: Form 3 - Astonia Royale KL Bld.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K-L Building.pdf14 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Royale KL Form 2.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: Astonia Rpyale - K L Bld.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Royale KL Form 2A.pdf14 Apr 2025
Certificates of CA (Form 3)File: Form 3 - Astonia Royale K L.pdf17 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Astonia Royale K L - Form 2A.pdf16 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Astonia Royale K L - Form 2.pdf16 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Astonia Royale K L - Form 2A.pdf16 Jan 2025
Certificates of CA (Form 3)File: Astonia Royale - K and L.pdf14 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Astonia Royale K-L Building.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Astonia Royale - K L.pdf10 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K-L Building.pdf22 Oct 2024
Certificates of CA (Form 3)File: Form 3 Astonia Royale K L.pdf22 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-AstoniaRoyale-KL-Jul24-Sep24.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Astonia Royale K L.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-AstoniaRoyale-KL-Jul24-Sep24.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Astonia Royale KL.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K-L Building.pdf11 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-AstoniaRoyale-KL-Apr24-June24.pdf11 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A-AstoniaRoyale-KL-Apr24-June24.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory Astonia Royale K-L Building.pdf11 Jul 2024
Certificates of CA (Form 3)File: CA Certificate Astonia Royale K-L Building.pdf11 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-AstoniaRoyale-KL-Jan24-Mar24.pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory Astonia Royale K L Building.pdf13 Apr 2024
Certificates of CA (Form 3)File: CA Certificate Astonia Royale K-L Building.pdf13 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K-L Building.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent.pdf23 Jan 2024
Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent.pdf23 Jan 2024
CERSAI detailsFile: CERSAI Declaration.pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of interest in other real estate ( Kishor Sir).pdf23 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of interest in other real estate ( Sanjeev Sir).pdf23 Jan 2024
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for separate bank Account.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for separate bank Account.pdf23 Jan 2024
Layout approvalFile: ASTONIA ROYAL K L layout.pdf13 Jan 2024
Copy of Layout Approval (in case of layout)File: ASTONIA ROYAL K L layout.pdf13 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K-L Building Dec-2023_.pdf13 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K-L Building Dec-2023_.pdf13 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-ASTR-KL-04-01-2024.pdf13 Jan 2024
Certificates of CA (Form 3)File: Form 3 - Astonia Royale K L.pdf13 Jan 2024
Layout approvalFile: Astonia Royale K L Building Layout.pdf11 Jan 2024
Copy of Layout Approval (in case of layout)File: Astonia Royale K L Building Layout.pdf11 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: K - L Building -Plinth Certificate.pdf11 Jan 2024
Declaration about Commencement CertificateFile: Declaration about Commencment Certificate Astonia Royale Phase -II - K and L Building.pdf11 Jan 2024
Declaration in FORM BFile: Declaration format B.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory Astonia Royale K- L Building.pdf11 Jan 2024
Declaration about Commencement CertificateFile: Astonia Royale - K L Declaration about C C.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Booked Inventory Astonia Royale K- L Building.pdf31 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf28 Dec 2023
Proforma of Allotment letterFile: Form 5.pdf28 Dec 2023
Proforma of Allotment letterFile: Form 5.pdf28 Dec 2023
Declaration in FORM BFile: Declaration Form B.pdf26 Dec 2023
Certificates of CA (Form 3)File: AEHL - FORM 3 - ROYALE KL - 30-9-23.pdf17 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K L Building.pdf14 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2-ASTR-KL-July-September2023.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A-ASTR-KL-July-September2023.pdf11 Oct 2023
Disclosure of sold/ booked inventoryFile: Booked Inventory Astonia Royale K-L Building.pdf11 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ASTONIA ROYALE K L 31-3-2023.pdf11 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Astonia Royale K-L Building Form 1 Architect Certificate.pdf18 Jul 2023
Certificates of CA (Form 3)File: REAR FORM 3 ROYALE KL 31-03-2023.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: Astonia Royale K L Building.pdf13 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale Phase -II K-L Building.pdf13 Apr 2023
Disclosure of sold/ booked inventoryFile: Astonia Royale K- L Building.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate form 1 Astonia Royale -K L Building.pdf7 Jan 2023
Disclosure of sold/ booked inventoryFile: Astonia Royale K L.pdf7 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate ASTR KL.pdf22 Oct 2022
Certificates of CA (Form 3)File: ASTONIA ROYALE K L FORM 3.pdf22 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA FORM 5 ASTONIA ROYALE K L.pdf13 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Astonia Royale K L Building.pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate ASTR K L.pdf7 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate ASTR KL.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Astonia Royale K L.pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Astonia Royale K L Engg Certificate.pdf1 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Astonia Royale K,L Quality assurance certificate.pdf1 Aug 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Astonia Classic A1 to A4 BuildingVillage Undri Taluka Haveli Dist. Pune384CompletedDec 2015Late, Nov 2016
Amits Colori A to F BuildingVillage Undri Taluka Haveli District Pune288CompletedDec 2012Mar 2012
Astonia Royale A to J, Q and R BuildingVillage Ambegaon Budruk Taluka Haveli Dist Pune576CompletedAug 2012Late, Nov 2013

How this compares with Pune

88%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 45 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Astonia Royale Phase II - K and L Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambegaon Bk13,700+ in Pune

2 kmAstonia Royale Phase II Completed 84Lapsed / revoked 36Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 185 registered projects within 2 km.

Builder: AMIT ENTERPRISES HOUSING LIMITED

AMIT ENTERPRISES HOUSING LIMITED has 8 registrations on MahaRERA, including AMITs COLORI Phase-II H and I Building and AMITs COLORI Phase-III G Building. Its filings disclose 10 earlier MahaRERA projects: declares 1 of 6 past projects completed on time. Litigation is declared on 4 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Astonia Royale Phase II - K and L Building is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Astonia Royale Phase II - K and L Building?

The registered promoter entity is AMIT ENTERPRISES HOUSING LIMITED, a company as per the filing. Its CIN U45200PN2008PLC131731 and GSTIN 27AAGCA9192A1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Astonia Royale Phase II - K and L Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Astonia Royale Phase II - K and L Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Astonia Royale Phase II - K and L Building?

The professionals named in the filing: Architect: Mr Manoj Tatooskar; Engineer: Mr. Umesh Joshi; Chartered Accountant: SSAP & Associates LLP; Chartered Accountant: Dharini Naswa & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Astonia Royale Phase II - K and L Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Astonia Royale Phase II - K and L Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Astonia Royale Phase II - K and L Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.