ASMI SHIMMERS

By AJAY DEDHIA

RG-MH-29410 · RERA P51800029561 · Last updated on MahaRERA portal: 14 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Litigation declared, 2 cases
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 95%
23 of 43Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

ASMI SHIMMERS is a Residential / Group Housing project by AJAY DEDHIA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029561 on 4 Jun 2021. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 36 months from the original filing. 20 of the 43 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameASMI SHIMMERS
  • TypeResidential / Group Housing
  • Location
    • AAREY ROAD VILLAGE PAHADI
    • GOREGAON EAST
    • Borivali
    • Mumbai Suburban
    • 400063
  • Pincode400063
  • RERA no.P51800029561
  • ReraGenie IDRG-MH-29410

Builder

  • NameAJAY DEDHIA
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredJun 2021First promiseDec 2022Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Jun 2021
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2022)
  • Buildings1 building record
  • Documents filed80 files

Current status

47%20 of 43 units booked
96.9%Work done, per cost certificate

Figures as on 14 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Udayachal CHS LTDNA151542143

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Udayachal CHS LTD: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 14 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area949 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Dec 2025
LandownerVillageDistrict
Udayachal CHS LtdBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2614.95
Proposed, not sanctioned2,172 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 7,RUSTUMJEE OZONE, LAXMI SINGH COMPLEX,GOREGAON WEST
Estimated costRs 6.50 cr
Cost incurredRs 6.30 cr
Work done96.87%
BuildingWingEstimatedIncurred
Udayachal CHS LTDNARs 6.50 crRs 6.30 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH KARNIK
ArchitectAMIT DESHPANDEY
EngineerJAYESH SHAH
Chartered AccountantJATINKUMAR JAIN
Chartered AccountantANTIM PATNI
PartnerRole in project
AJAY Malshi DEDHIA-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018982Dec 2022 → Dec 2025

Reason as filed by the promotergovernment compliance

EXT51800012967Dec 2022 → Dec 2023

Reason as filed by the promoterThe project is delayed because of technical issues from due to that competent authority is pending. We require another one year to complete the project which is from 31st December, 2022 to 31st December, 2023 for doing all compliance of competent authority.

Litigation declared2

CaseCourtStatus
CC006000000055322/2020MahareraPending
CC006000000055322/2020MAHARERAOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Asmi Con Form 1.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2 (9).pdf14 Feb 2026
Withdrawal Update Form 3File: Asmi Cons Form 31 Dec 25 Signed NEW.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1 (1).pdf17 Dec 2025
Withdrawal Update Form 2File: Asmi Construction Shah Structurals Pvt Ltd_003052.pdf17 Dec 2025
Withdrawal Update Form 3File: Asmi Constructioin Patni Mandhana u0026 Assiciates 9-10-25_003067 final _compressed (1).pd17 Dec 2025
Form 1File: Form 1.pdf2 Sep 2025
Form 2File: AC Form 2.pdf2 Sep 2025
Form 3File: Form 3.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: AC Sold Unsold.pdf2 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Form1.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form3.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC Form2.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024_Construction.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC FORM 1.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC FORM 2.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form 3.pdf27 Apr 2024
Details of encumbrances concerned to FinanceFile: Title Certificate Udayachal CHSL - AKS Legal.pdf13 Feb 2024
Details of encumbrances concerned to LegalFile: Title Certificate Udayachal CHSL - AKS Legal.pdf13 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anx A.pdf13 Feb 2024
Declaration in FORM BFile: AC Form B.pdf10 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AC Form 2 A.pdf10 Feb 2024
Building plan approvalFile: Plan 1 Page.pdf7 Feb 2024
Building plan approvalFile: Plan 2 Page.pdf7 Feb 2024
Building plan approvalFile: Plan 3 Page.pdf7 Feb 2024
Details of encumbrancesFile: AC NEC.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 1 Page.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 Page.pdf7 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 3 Page.pdf7 Feb 2024
Declaration about Commencement CertificateFile: AC Form D.pdf7 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: AC Bank.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Form 1.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC Form 2 Dec 23.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: AC Sold Unsold.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form 3.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Oct 2023.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ACForm 2.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ACForm 3.pdf20 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 2378017_FurtherCC_signed_2023.pdf13 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Asmi Con Form 5 FY 2223.pdf13 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Asmi Shrimmers CA Certificate.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Asmi Shrimmers CA Certificate.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 July 2023.pdf3 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Up.pdf3 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Up.pdf3 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 April 2023.pdf29 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AC FOrm 5 FY 21-22.pdf26 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form 3.pdf23 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2.pdf22 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: AC Form 2A.pdf7 Dec 2022
Declaration about Commencement CertificateFile: AC Form D.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1.pdf6 Dec 2022
CERSAI detailsFile: AC Sold_Unsold.pdf6 Dec 2022
Disclosure of sold/ booked inventoryFile: AC Sold_Unsold.pdf6 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 2022.pdf22 Aug 2022
Building plan approvalFile: FINAL PLAN APPROVED (3)-Model.pdf5 May 2021
Building Plan Approval / NA Order for plotted developmentFile: FINAL PLAN APPROVED (3)-Model.pdf5 May 2021
PAN CardFile: AjayDedhia Pan Card(1).pdf29 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera form 3.pdf15 Feb 2021
Proforma of Allotment letterFile: Performa SUpp Agreement.pdf15 Feb 2021
OtherFile: Title Certificate CTS 281 (1).pdf15 Feb 2021
OtherFile: Udayachal Order.pdf15 Feb 2021
Layout approvalFile: layout plan.pdf12 Feb 2021
Copy of the legal title reportFile: Title Certificate CTS 281 (1).pdf12 Feb 2021
Details of encumbrancesFile: NON ENCUMBRANCE CERTIFICATE.pdf12 Feb 2021
Copy of Layout Approval (in case of layout)File: layout plan.pdf12 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: Udyachal CC.pdf12 Feb 2021
Declaration in FORM BFile: Form B Asmi Construction.pdf12 Feb 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ASMI DREAMZJUNCTION OF S V ROAD AND S V ROAD GOREGAON WEST46CompletedJan 2019Late, Jun 2019

How this compares with Mumbai Suburban

47%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASMI SHIMMERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOREGAON EAST6,700+ in Mumbai Suburban

Builder: AJAY DEDHIA

AJAY DEDHIA has 1 registration on MahaRERA, including ASMI SHIMMERS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that ASMI SHIMMERS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ASMI SHIMMERS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASMI SHIMMERS?

The registered promoter entity is AJAY DEDHIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASMI SHIMMERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASMI SHIMMERS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASMI SHIMMERS?

The professionals named in the filing: Architect: MANISH KARNIK; Architect: AMIT DESHPANDEY; Engineer: JAYESH SHAH; Chartered Accountant: JATINKUMAR JAIN; Chartered Accountant: ANTIM PATNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASMI SHIMMERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASMI SHIMMERS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASMI SHIMMERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.