Home / Browse projects / Pune, Maharashtra / ASHTAVINAYAK CITY PHASE 1

Completed No litigation declared Residential / Group Housing project

ASHTAVINAYAK CITY PHASE 1

By ASHTAVINAYAK CITY PUNE LLP

RG-MH-11720 · RERA P52100003514 · Last updated on MahaRERA portal: 4 Jul 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

ASHTAVINAYAK CITY PHASE 1 is a Residential / Group Housing project by ASHTAVINAYAK CITY PUNE LLP in Pune, Maharashtra, registered with MahaRERA as P52100003514 on 5 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameASHTAVINAYAK CITY PHASE 1
  • TypeResidential / Group Housing
  • Location
    • Fursungi
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003514
  • ReraGenie IDRG-MH-11720

Builder

  • NameASHTAVINAYAK CITY PUNE LLP
  • Entity typePartnership
  • PartnersAMIT DATTATRAY GHULE, SANTOSH MURLIDHAR RUKARI, PRATTHAMESH SANJJOY RUKARI, VIGHNES SANJJOY RUKARI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings3 building records
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VINAYAK 1 WING ABNA120000
VINAYAK 2 WING CDNA120000
VINAYAK 3 WING EFNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

VINAYAK 1 WING AB91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VINAYAK 2 WING CD91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VINAYAK 3 WING EF91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes80%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes80%
Open ParkingYes100%

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80
BuildingClosed/CoveredTotal
VINAYAK 1 WING AB2828
VINAYAK 2 WING CD2424
VINAYAK 3 WING EF2828

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,822 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
SANTOSH MURLIDHAR RUKARI HUFParvatiPune
SANJAY MURLIDHAR RUKARI HUFWadgaon BkPune
PRABHAKAR KASHINATH RUKARIFursungiPune
SUJEET PRABHAKAR RUKARIFursungiPune
SONAL PRATISH BELPATRESashtePune

Approvals and building plan

Permissible FSI19762.85
Proposed, not sanctioned19,263 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHADAPSAR PUNE 411028

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANTOSH RASKAR
EngineerSHISHIR DHAWADE
PartnerRole in project
ASHTAVINAYAK CITY PUNE LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001023Dec 2018 → Dec 2019

Reason as filed by the promoterRespected Sir, Due to new tax reform introduced by Government of India in the name of GST on 1 July 2017 , We had unable to purchase material from our vendors in the month of July & August due to initial confusion of new GST tax. After many clarifications & notification by finance department trade had started working smoothly in first week of September, Even our National GDP had reduced with negative growth of 3 % in said period. Due to above tax reform our Project had delayed by three months.& Considering one month period to receive completion certificate from component authorities i.e. PMC w

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Mar 2021

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: FORMATION BUL 2.pdf4 Jul 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: FORMATION BUL 2.pdf4 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Plase 1 Completion.pdf18 Mar 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Vinayak Bldg No 1.pdf18 Mar 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Vinayak Bldg No 3.pdf18 Mar 2021
OtherFile: Completion Cetificate.pdf7 Aug 2019
Certificates of CA (Form 3)File: FORM Cpmpress.pdf29 Dec 2018
Certificates of CA (Form 3)File: Form Compress 1.pdf29 Dec 2018
Certificates of CA (Form 5)File: Form 5.pdf28 Dec 2018
Building plan approvalFile: 14 - 19.PDF28 Jul 2017
Building plan approvalFile: 15 - 19.PDF28 Jul 2017
Building plan approvalFile: 16 - 19.PDF28 Jul 2017
Building plan approvalFile: 17 - 19.PDF28 Jul 2017
Building plan approvalFile: 18 - 19.PDF28 Jul 2017
Building plan approvalFile: 19 - 19.PDF28 Jul 2017
Building plan approvalFile: 2 - 19.pdf28 Jul 2017
Layout approvalFile: 1 - 19.pdf28 Jul 2017
Building plan approvalFile: 11 - 19.PDF28 Jul 2017
Building plan approvalFile: 12 - 19.PDF28 Jul 2017
Building plan approvalFile: 13 - 19.PDF28 Jul 2017
Building plan approvalFile: 3 - 19.PDF28 Jul 2017
Building plan approvalFile: 4 - 19.PDF28 Jul 2017
Building plan approvalFile: 5 - 19.PDF28 Jul 2017
Building plan approvalFile: 6 - 19.PDF28 Jul 2017
Building plan approvalFile: 7 - 19.PDF28 Jul 2017
Building plan approvalFile: 8 - 19.PDF28 Jul 2017
Building plan approvalFile: 9 - 19.PDF28 Jul 2017
Building plan approvalFile: 10 - 19.PDF28 Jul 2017
Copy of Layout Approval (in case of layout)File: 1 - 19.pdf28 Jul 2017
Building Plan Approval (IOD)File: 2 - 19.pdf28 Jul 2017
Building Plan Approval (IOD)File: 3 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 4 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 5 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 6 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 7 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 8 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 9 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 10 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 11 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 12 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 13 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 14 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 15 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 16 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 17 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 18 - 19.PDF28 Jul 2017
Building Plan Approval (IOD)File: 19 - 19.PDF28 Jul 2017
Copy of the legal title reportFile: Additional Search Report.pdf27 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA Order Old(1).pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Raskar Sir Certificate.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer City.pdf27 Jul 2017
Certificates of CA (Form 3)File: Form 3.PDF27 Jul 2017
Proforma of Allotment letterFile: Final Agreement Draft City.pdf27 Jul 2017
PAN CardFile: Pan Card0001.pdf26 Jul 2017
Copy of the legal title reportFile: Search And Title.pdf26 Jul 2017
Declaration in FORM BFile: Ashtavinayak City From B.pdf26 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ASHTAVINAYAK AARAMBHLONI KALBHOR PUNE3CompletedJul 2016Late, Sep 2016
ASHTAVINAYAK NISARGFURSUNGI PUNE2CompletedDec 2015Late, Jan 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHTAVINAYAK CITY PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Fursungi13,700+ in Pune

2 kmASHTAVINAYAK CITY PHASE Completed 43Lapsed / revoked 15Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: ASHTAVINAYAK CITY PUNE LLP

ASHTAVINAYAK CITY PUNE LLP has 3 registrations on MahaRERA, including ASHTAVINAYAK CITY PHASE 1 and Ashtavinayak City Phase II. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if ASHTAVINAYAK CITY PHASE 1 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHTAVINAYAK CITY PHASE 1?

The registered promoter entity is ASHTAVINAYAK CITY PUNE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHTAVINAYAK CITY PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHTAVINAYAK CITY PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHTAVINAYAK CITY PHASE 1?

The professionals named in the filing: Architect: SANTOSH RASKAR; Engineer: SHISHIR DHAWADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHTAVINAYAK CITY PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHTAVINAYAK CITY PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHTAVINAYAK CITY PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.