Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 90%
39 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Ashok Business Centre is a Commercial project by Nagratan Ashok Kangokar & Family in Nashik, Maharashtra, registered with MahaRERA as P51600050976 on 16 May 2023. Possession is promised by 31 Dec 2028. 8 of the 47 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameAshok Business Centre
  • TypeCommercial
  • Location
    • Near K K Wagh Agriculture College
    • Nashik Shiwar
    • Nashik (M Corp.)
    • Nashik
    • 422003
  • Pincode422003
  • RERA no.P51600050976
  • ReraGenie IDRG-MH-83595

Builder

  • NameNagratan Ashok Kangokar & Family
  • Entity typeOthers
  • Named personsAnand Ashok Kangokar, Nagratan Ashok Kangokar, Ashok Mahadevrao Kagokar, Rajesh Ashok Kangokar

Key dates

this monthRegisteredMay 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed76 files

Current status

17%8 of 47 units booked
52.6%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ashok Business Centre Building No 01NA3302929
Ashok Business Centre Building No 02NA3001818

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Ashok Business Centre Building No 0142%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Ashok Business Centre Building No 0241%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed110

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots110
Closed/Covered50
Open Space60
BuildingClosed/CoveredOpen SpaceTotal
Ashok Business Centre Building No 01253055
Ashok Business Centre Building No 02253055

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,847 sq m
Land owned byThe promoter
Named landownersNone
Declared on24 Jul 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI3620.71
Proposed, not sanctioned3,621 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShaktisagar Opp Renuka Baug, Station Road,, Deolali Naka, Pincode - 422001
Estimated costRs 9.74 cr
Cost incurredRs 5.12 cr
Work done52.57%
BuildingWingEstimatedIncurred
Ashok Business Centre Building No 01NARs 4.99 crRs 2.76 cr
Ashok Business Centre Building No 02NARs 4.75 crRs 2.36 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVINDRA G BHAVSAR
EngineerBhanuvilas Bhavskar
Chartered AccountantKaliprasad Jayraj Bhatt
Chartered AccountantAnand Kabra & Co.
PartnerRole in project
Nagratan Ashok Kangokar & Family-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q4.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf25 Feb 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 Rera q3.pdf25 Feb 2026
Withdrawal Update Form 1File: FORM-1.pdf12 Dec 2025
Withdrawal Update Form 1File: FORM-1.pdf12 Dec 2025
Withdrawal Update Form 2File: Form2 Q2.pdf12 Dec 2025
Withdrawal Update Form 2File: Form2 Q2.pdf12 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf12 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf12 Dec 2025
Form 5 (FY 2024-2025)File: form 5.pdf12 Dec 2025
Withdrawal Update Form 1File: FORM-1.pdf5 Dec 2025
Withdrawal Update Form 2File: Form2 Q2.pdf5 Dec 2025
Withdrawal Update Form 3File: form 3 q2.pdf5 Dec 2025
Withdrawal Update Form 1File: FORM 1 .pdf12 Sep 2025
Withdrawal Update Form 2File: Nagratan ER mar 24.pdf12 Sep 2025
Withdrawal Update Form 3File: form 3 Q1.pdf12 Sep 2025
Form 1File: form1_11zon.pdf24 Jul 2025
Form 2File: form 2.pdf24 Jul 2025
Form 3File: form 3.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf24 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form 1.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca certificate form 3 SIGNED_compressed.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate form 2.pdf8 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA FORM 5 FY23-24.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FOR Q2 24-25_11zon.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Q2.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 .pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Nagratan AR mar 24.pdf24 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nagratan ER mar 24.pdf24 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nagratan CA mar 24.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Final.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Final.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf9 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Ashok Business Centre.pdf24 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf18 Apr 2024
Other - TechnicalFile: form 2A.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Sept 23.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Sept 23.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Sept-23_compressed.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June 2023.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Ashok Business Centre.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 2023_compressed.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 2023_compressed.pdf29 Nov 2023
Proforma of Agreement for saleFile: AFS Uploading final.pdf13 May 2023
Layout approvalFile: Plan 01.pdf29 Apr 2023
Layout approvalFile: Plan 02.pdf29 Apr 2023
Building plan approvalFile: Plan 01.pdf29 Apr 2023
Building plan approvalFile: Plan 02.pdf29 Apr 2023
Copy of the legal title reportFile: Title 1.pdf29 Apr 2023
Copy of Layout Approval (in case of layout)File: Plan 01.pdf29 Apr 2023
Copy of Layout Approval (in case of layout)File: Plan 02.pdf29 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 01.pdf29 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 02.pdf29 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Initial.pdf29 Apr 2023
PAN CardFile: Firm Pan Card.pdf11 Apr 2023
Details of encumbrances concerned to FinanceFile: EC to finance.pdf11 Apr 2023
Details of encumbrances concerned to FinanceFile: EC to legal.pdf11 Apr 2023
Details of encumbrances concerned to LegalFile: EC to finance.pdf11 Apr 2023
Details of encumbrances concerned to LegalFile: EC to legal.pdf11 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf11 Apr 2023
Declaration about Commencement CertificateFile: Form D.pdf11 Apr 2023
Declaration in FORM BFile: Form B.pdf11 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf11 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Anand 1.pdf11 Apr 2023
Proforma of Allotment letterFile: Allotment letter.pdf11 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration-Ashok Business Centre.pdf11 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter.pdf11 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for sale.pdf11 Apr 2023

How this compares with Nashik

17%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ashok Business Centre on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik Shiwar4,100+ in Nashik

Builder: Nagratan Ashok Kangokar & Family

Nagratan Ashok Kangokar & Family has 1 registration on MahaRERA, including Ashok Business Centre. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Ashok Business Centre is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashok Business Centre?

The registered promoter entity is Nagratan Ashok Kangokar & Family, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashok Business Centre?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashok Business Centre?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashok Business Centre?

The professionals named in the filing: Architect: RAVINDRA G BHAVSAR; Engineer: Bhanuvilas Bhavskar; Chartered Accountant: Kaliprasad Jayraj Bhatt; Chartered Accountant: Anand Kabra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashok Business Centre?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashok Business Centre. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashok Business Centre to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.