ASHLAR TATTVA

By AKSHAR ENTERPRISES

RG-MH-28946 · RERA P51700027399 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 24.00 crore secured on the land, in favour of TRUHOME FINANCE LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
10 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 80%
68 of 139Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

ASHLAR TATTVA is a Others project by AKSHAR ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700027399 on 8 Dec 2020. Possession is promised by 30 Jun 2027. 71 of the 139 units on this registration are recorded sold or booked, and 10 of 33 construction stages are filed complete.

At a glance

Project

  • NameASHLAR TATTVA
  • TypeOthers
  • Location
    • STATION ROAD
    • MANDA
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700027399
  • ReraGenie IDRG-MH-28946

Builder

  • NameAKSHAR ENTERPRISES
  • Entity typePartnership
  • GSTIN27ABJFA8683K1ZR
  • PartnersASHOK SHAMJI PATEL, DHIREN SHAMJI PATEL, HARESH ANANDJI PATEL, MUKESH MANJI VAVIYA, WAMAN SHIVRAM PATIL, PREMJI LADHA VAVIYA, JEET TUSHAR PATIL, SHAILESH ANANDJI PATEL
  • Other registrations4 more →
  • Completed3 of 5
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2020PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Dec 2020
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed54 files

Current status

51%71 of 139 units booked

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA151512316139
BULIDING BNA150000
BUILDING-CNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

BUILDING A80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BULIDING B9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING-C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes55%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Open Space39
BuildingOpen SpaceTotal
BUILDING A1313
BULIDING B1313
BUILDING-C1313

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area7,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTRUHOME FINANCE LTD
Secured amountRs 24.00 crore
CERSAI search filedYes
Declared on26 Jun 2026
LandownerVillageDistrict
STALWART IMPEX PRIVATE LIMITEDNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI18243.28
Proposed, not sanctioned4,743 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4, YASHRAJ HOMES, SUBHASH ROAD, NEAR KAGADE CHOWK DOMBIVALI WEST-421202

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectD M D ARCHITECTS Shailaja Vaidya
EngineerShanti Consulatants
EngineerAssociated Structural Engineers LLP
Chartered AccountantPRITESH GADA & CO
Chartered AccountantANKUR SANGOI AND ASSOCIATES
Chartered AccountantKETAN SANGOI & ASSOCIATES
PartnerRole in project
AKSHAR ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Dec 2024

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25 Akshar Enterprises_Signed and Stamped.pdf18 May 2026
Form 5 (FY 2021-2022)File: (Form 5) Annual Audit Report FY 2021-22.pdf29 Jan 2026
Form 5 (FY 2022-2023)File: (Form 5)_Ashlar Tattva A Wing_FY 2022-23.pdf29 Jan 2026
Form 5 (FY 2023-2024)File: (Form 5)_Ashlar Tattva A Wing FY 2023-24.pdf29 Jan 2026
Form 5 (FY 2020-2021)File: (Form 5) Annual Audit Report FY 2020-21.pdf28 Jan 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf21 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AKSHAR ENT FORM 2 30TH SEPT 2024.pdf2 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC ASHLAR TATTVA.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ashlar Tattva Architect certificate 31March 2023.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aSHLAR tATTVA Architect Certficate 31 MARCH 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 31 mARCH 2023.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 mARCH 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30 JUNE 2024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Ashlar Tattva INVENTORY 31-3-2023.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Ashlar Tattva iNVENTORY 31-3-2024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Ashlar Tattva iNVENTORY 30-6-2024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM CA.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ashlar Tattva Architect certificate 31March 2023.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aSHLAR tATTVA Architect Certficate 31 MARCH 2024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM CA.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 31 mARCH 2023.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31 mARCH 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30 JUNE 2024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Ashlar Tattva INVENTORY 31-3-2023.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Ashlar Tattva iNVENTORY 31-3-2024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Ashlar Tattva iNVENTORY 30-6-2024.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY SOLD AS ON 31JAN2023.pdf20 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 akshar enterprises 31jan2023.pdf18 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21.pdf14 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form_5 FY 21-22.pdf14 Mar 2023
CERSAI detailsFile: AKSHAR ENT - CERSAI.pdf3 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: pdf-converter-202302283730.pdf1 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect letter 30-6-20.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect letter 12-11-22.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATED27-11-20.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DATED 31-3-22.pdf25 Feb 2023
Other - LegalFile: Declaration.pdf30 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Compressed.pdf29 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Scan Form 3_compressed.pdf29 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12)Akshar Enterprises Form 3.pdf4 Dec 2020
Building plan approvalFile: NA ORDER NOTICE FROM TAHSILDAR STALWART IMPEX PRIVATE LTD-min.pdf2 Dec 2020
Layout approvalFile: 4I) PLAN 1.pdf2 Dec 2020
Layout approvalFile: 4 II)PLAN 2.pdf2 Dec 2020
PAN CardFile: 1)PAN ABJFA8683K - AKSHAR ENTERPRISES_compressed.pdf2 Dec 2020
Copy of Layout Approval (in case of layout)File: 4I) PLAN 1.pdf2 Dec 2020
Copy of Layout Approval (in case of layout)File: 4 II)PLAN 2.pdf2 Dec 2020
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER NOTICE FROM TAHSILDAR STALWART IMPEX PRIVATE LTD-min.pdf2 Dec 2020
Copy of the legal title reportFile: 2) TITLE CERTIFICATE.pdf1 Dec 2020
Details of encumbrancesFile: 3) SELF DECLARATION REGARDING ENCUMBRANCES AKSHAR ENTERPRISES.pdf1 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: 6) COMMENCEMENT CERTIFICATE xerox-min.pdf1 Dec 2020
Declaration in FORM BFile: FORMB AKSHAR ENTERPRISES.pdf1 Dec 2020
Proforma of Allotment letterFile: 15 I)ALLOTMENT LETTER.pdf1 Dec 2020
Proforma of Allotment letterFile: 15 II)AGREEMENT FOR SALE.pdf1 Dec 2020

How this compares with Thane

51%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHLAR TATTVA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANDA7,600+ in Thane

2 kmASHLAR TATTVACompleted 24Lapsed / revoked 15Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 69 registered projects within 2 km.

Builder: AKSHAR ENTERPRISES

Akshar Enterprises has 5 registrations on MahaRERA, including AKSHAR DEEP and Akshar Jyot. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ASHLAR TATTVA is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHLAR TATTVA?

The registered promoter entity is AKSHAR ENTERPRISES, a partnership as per the filing. Its GSTIN 27ABJFA8683K1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHLAR TATTVA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHLAR TATTVA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHLAR TATTVA?

The professionals named in the filing: Architect: D M D ARCHITECTS Shailaja Vaidya; Engineer: Shanti Consulatants; Engineer: Associated Structural Engineers LLP; Chartered Accountant: PRITESH GADA & CO; Chartered Accountant: ANKUR SANGOI AND ASSOCIATES; Chartered Accountant: KETAN SANGOI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHLAR TATTVA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHLAR TATTVA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHLAR TATTVA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.