Home / Browse projects / Raigarh, Maharashtra / Ashiyana Village Building no 10

Completed No litigation declared Residential / Group Housing project

Ashiyana Village Building no 10

By Ajaz Yusuf Khot

RG-MH-44645 · RERA P52000049735 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Stilt Floor, 95%
42 of 63Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Ashiyana Village Building no 10 is a Residential / Group Housing project by Ajaz Yusuf Khot in Raigarh, Maharashtra, registered with MahaRERA as P52000049735 on 24 Feb 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 21 of the 63 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAshiyana Village Building no 10
  • TypeResidential / Group Housing
  • Location
    • Katrang Road
    • Katrang
    • Khopoli
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000049735
  • ReraGenie IDRG-MH-44645

Builder

  • NameAjaz Yusuf Khot
  • Entity typeIndividual
  • GSTIN27ABEPK4242K1ZM
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

33%21 of 63 units booked
50.1%Work done, per cost certificate

Figures as on 30 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ashiyana Village Building no 10NA8763063

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

Ashiyana Village Building no 10: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed101

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots101
Closed/Covered101

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,927 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2025

Approvals and building plan

Sanctioning authorityKhopoli Muncipal Council
Permissible FSI4295.0
Proposed, not sanctioned4,295 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFirst Floor Ashiyana Tower Building no 1 Bazar Peth Khopoli
Estimated costRs 11.79 cr
Cost incurredRs 5.91 cr
Work done50.11%
BuildingWingEstimatedIncurred
Ashiyana Village Building no 10NARs 10.71 crRs 5.79 cr
-NARs 1.08 crRs 12.51 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAK Design Cell
EngineerSaurabh Patil
EngineerAdharshila Consultants
EngineerAshiyan Ajaz Khot
Chartered AccountantPrajwal Shetty & Co
Chartered AccountantShrikant Dipak Dongre
PartnerRole in project
Ajaz Yusuf Khot-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: form 5 AC.pdf30 Sep 2025
Occupational CertificateFile: OC CERTIFICATE.pdf25 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC - Architech Certificate (1)_compressed.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC - Engineers Certificate (1)_compressed.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: AC - Inventory (1)_compressed.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate AC (1)_compressed.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AC (1)_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate AC_compressed.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory AC (1)_compressed.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Architect certificate.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form 3.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC Engineering certificate.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: AC Inventory.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 rera ashiyana construction .pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate AC.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate AC.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A AC.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory AC.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 AC_compressed.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate -AcC_compressed.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certiicate-AC_compressed.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A- AC_compressed.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold- Unsold Inventory- AC_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Ashiyana Construction_compressed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC- Architect Certificate_compressed.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC - Form 2_compressed.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AC- Engineers Certificate_compressed.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: AC- Inventory Oct -Dec 23_compressed.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: reraform3_AC_Q3_23-24_compressed (1) (1).pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC Architect's Certificate_compressed (1).pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AC Engineer's Certificate_compressed (1).pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: AC Foem 2A_compressed.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: AC- Sold Booked Inventory_compressed.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form-3_compressed.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AK Form 3_compressed.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 rera ashiyana construction .pdf30 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 23-24Ashiyana construction .pdf22 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AC Form 3-compressed.pdf9 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf7 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf7 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf7 Apr 2023
Declaration in FORM BFile: Ashiyana Construction Notary-compressed.pdf20 Feb 2023
Proforma of Agreement for saleFile: Rera Agreement Draft 18-02-2023.pdf18 Feb 2023
Copy of the legal title reportFile: Legal Title Report-compressed.pdf10 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumburances related to Legal.pdf9 Feb 2023
Details of encumbrances concerned to LegalFile: Encumburances related to Legal.pdf9 Feb 2023
Declaration about Commencement CertificateFile: Format d.pdf9 Feb 2023
CERSAI detailsFile: Cersai.pdf9 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annesure A 1.pdf9 Feb 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER-compressed.pdf9 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format 'A'.pdf9 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report.pdf9 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report 1.pdf9 Feb 2023
Building plan approvalFile: Scan_20220313_165124-compressed.pdf8 Feb 2023
Building plan approvalFile: Scan_20220313_165317-compressed.pdf8 Feb 2023
Layout approvalFile: Scan_20220313_165224-compressed.pdf8 Feb 2023
PAN CardFile: DocScanner Feb 7, 2023 9-07 PM.pdf8 Feb 2023
Copy of Layout Approval (in case of layout)File: Scan_20220313_165224-compressed.pdf8 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan_20220313_165124-compressed.pdf8 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan_20220313_165317-compressed.pdf8 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Ashiyana VIllage CC-compressed.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-compressed.pdf8 Feb 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Rahat 3Katrang Road Khopoli15CompletedDec 2014Oct 2014
Ashiyana Village Phase 1Katrang Road Khopoli96CompletedOct 2013Oct 2013

How this compares with Raigarh

33%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ashiyana Village Building no 10 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Katrang5,900+ in Raigarh

2 kmAshiyana Village BuildinCompleted 16Lapsed / revoked 5Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: Ajaz Yusuf Khot

Ajaz Yusuf Khot has 2 registrations on MahaRERA, including Ashiyana Village Phase 3 and Ashiyana Village Building no 10. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Ashiyana Village Building no 10 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashiyana Village Building no 10?

The registered promoter entity is Ajaz Yusuf Khot, an individual as per the filing. Its GSTIN 27ABEPK4242K1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashiyana Village Building no 10?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashiyana Village Building no 10?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashiyana Village Building no 10?

The professionals named in the filing: Architect: AAK Design Cell; Engineer: Saurabh Patil; Engineer: Adharshila Consultants; Engineer: Ashiyan Ajaz Khot; Chartered Accountant: Prajwal Shetty & Co; Chartered Accountant: Shrikant Dipak Dongre. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashiyana Village Building no 10?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashiyana Village Building no 10. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashiyana Village Building no 10 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.