Home / Browse projects / Raigarh, Maharashtra / Ashiyana Infinity Phase 1

Completed No litigation declared Others project

Ashiyana Infinity Phase 1

By Ashiyana Dream Homes Pvt. Ltd.

RG-MH-66919 · RERA P52000017538 · Last updated on MahaRERA portal: 27 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
27 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

Ashiyana Infinity Phase 1 is a Others project by Ashiyana Dream Homes Pvt. Ltd. in Raigarh, Maharashtra, registered with MahaRERA as P52000017538 on 24 Aug 2018. The registration is recorded completed; possession was promised by 25 Dec 2024.

At a glance

Project

  • NameAshiyana Infinity Phase 1
  • TypeOthers
  • Location
    • Mumbai Pune Highway
    • Near Hanuman Temple
    • Opposite Mulgaon Industrial Estate
    • Khopoli
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000017538
  • ReraGenie IDRG-MH-66919

Builder

  • NameAshiyana Dream Homes Pvt. Ltd.
  • Entity typeCompany
  • CINU70102MH2015PTC270197
  • GSTIN27AANCA9050G1ZH
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorMarjeena Ateeque Khot
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2018PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Aug 2018
  • Promised completion25 Dec 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1 CommercialNA30000
Building No 1 A WingNA110000
Building No 1 B WingNA110000
Building No 2 A WingNA110000
Building No 2 B WingNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 27 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 90%.

Building No 1 Commercial95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Building No 1 A Wing75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Building No 1 B Wing76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Building No 2 A Wing55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Building No 2 B Wing56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities18

As on 27 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Open GymYes0%
On Grid Solar Power Plant for Common AmmenitiesYes0%
Swimming PoolYes0%

Parking filed423

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots423
Closed/Covered112
Open Space311
BuildingClosed/CoveredOpen SpaceTotal
Building No 1 B Wing8681167
Building No 2 A Wing13115128
Building No 2 B Wing13115128

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,930 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI15598.16
Proposed, not sanctioned10,496 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch101, Ashiyana Tower, Bazar Peth, Khopoli 410203

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhikalpa Architects & Interior Designer
EngineerAdharshila Consultants
Chartered AccountantCA Shrikant D Dongre
PartnerRole in project
Ashiyana Dream Homes Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jan 2023

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Phase I-compressed.pdf27 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 ADH Ph 1-compressed.pdf23 Jan 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 ADH (1)-compressed.pdf23 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Bldg No 1-compressed.pdf19 Jan 2023
Certificates of CA (Form 3)File: Form 3 PH1 compressed.pdf18 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q2 22 23.pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q2 22 23.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf7 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 AI Phase 1 Q1 FY 22-23_compressed.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 AI Phase 1 Q1 FY 22-23_compressed.pdf7 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A AI Phase 1 Q1 FY 22-23_compressed.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory AI Phase 1 Q1 FY 22-23_compressed.pdf7 Jul 2022
CERSAI detailsFile: AI Phase 1 Self Declaration No Security Interest_compressed.pdf7 Jul 2022
Certificates of CA (Form 3)File: Form 3 AI Phase 1 Q1 FY 22-23_compressed.pdf7 Jul 2022
Proforma of Allotment letterFile: AI Phase 1 Allotment Letter_compressed.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 AI Phase 1 Q4 FY 21-22_compressed.pdf4 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 AI Phase 1 Q4 21-22_compressed.pdf4 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A AI Phase 1 Q4 FY 21-22_compressed.pdf4 May 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory AI Phase 1_compressed.pdf4 May 2022
Certificates of CA (Form 3)File: Form 3 AI Phase 1_compressed.pdf4 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AI Phase 1 Form 1 FY 21-22 Q3_compressed.pdf9 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AI Phase 1 Form 2 FY 21-22 Q3_compressed.pdf9 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: AI Phase 1 Form 2A FY 21-22 Q3_compressed.pdf9 Jan 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory AI Phase 1 FY 21-22 Q3_compressed.pdf9 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AI 1 - Architects Certificate FY 21-22 Q2_compressed.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2A Part 2.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A part 1.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: AI Phase 1 - Disclosure of Inventory_compressed.pdf7 Oct 2021
Certificates of CA (Form 3)File: FORM 3 ASHIYANA INFINITY PHASE 1 30-09-2021_0001_compressed.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 ADH 2020-21_compressed.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AI Phase 1 Form 2_compressed.pdf6 Oct 2021
Declaration about Commencement CertificateFile: Declaration of CC.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q4 FY2020-21.pdf14 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q1 FY 2021-22.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 3 Q4 2020-21.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 3 Q4 2020-21.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q4 2020-21.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q1 2021-22.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A FY 20-21 Q1.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A FY 20-21 Q2.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A FY 20-21 Q3.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A FY 20-21 Q4.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Q1 FY 2021-22Disclosure Of Inventory.pdf14 Aug 2021
Certificates of CA (Form 3)File: Form 3 Q4 2020-21.pdf14 Aug 2021
Certificates of CA (Form 3)File: Form 3 Q1 2021-22.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ADH Form 5 2019-20-compressed.pdf9 Mar 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's certificate Q3 .pdf22 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate FY 20-21 Q2_compressed.pdf22 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate FY 20-21 Q1.pdf22 Feb 2021
Certificates of CA (Form 3)File: CA Certificate FY 19-20 - Q4-compressed.pdf22 Feb 2021
Certificates of CA (Form 3)File: CA Certificate FY 20-21 Q2.pdf22 Feb 2021
Certificates of CA (Form 3)File: CA Certificate FY 20-21 Q3.pdf22 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Q-1 2020.pdf21 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Q-2 2020.pdf21 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Q-3 2020.pdf21 Feb 2021
Certificates of CA (Form 3)File: RERA CA CERTIFICATE OCT 2019 Upload.pdf21 Feb 2021
Certificates of CA (Form 3)File: Ashiyana Infinity CA Certitificate for Q1 - June 2020.pdf21 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 March 2019.pdf2 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: September 2019 Upload.pdf21 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: December 2019 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rehman - Q1 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rehman - Q2 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rehman - Q3 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rehman - Q4 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Laxman Q1 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Laxman Q2 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Laxman Q3 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Laxman Q4 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ganesh Q1 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ganesh Q2 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ganesh Q3 Upload.pdf21 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ganesh Q4 Upload.pdf21 Feb 2020
Certificates of CA (Form 3)File: RERA CA CERTIFICATE OCT 2019 Upload.pdf21 Feb 2020
Certificates of CA (Form 3)File: RERA CA CERTIFICATE JAN 2020 Upload.pdf21 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certifcate upto September 2019.pdf26 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate upto December 2019.pdf26 Jan 2020
Annual Audit Report of Statutory CA (Form 5)File: Form 5 March 2019.pdf30 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers cirficate Upto May 2019.pdf27 Jun 2019
Certificates of CA (Form 3)File: Ca Cetificate form 3 Upto may.pdf27 Jun 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ashiyana Infinity Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Hanuman Temple, Opposite Mulgaon Industrial Estate5,900+ in Raigarh

2 kmAshiyana Infinity Phase Completed 22Lapsed / revoked 5Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 58 registered projects within 2 km.

Builder: Ashiyana Dream Homes Pvt. Ltd.

Ashiyana Dream Homes Pvt. Ltd. has 3 registrations on MahaRERA, including Ashiyana Infinity Phase 1 and Ashiyana Infinity Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Ashiyana Infinity Phase 1 is delayed beyond 25 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ashiyana Infinity Phase 1?

The registered promoter entity is Ashiyana Dream Homes Pvt. Ltd., a company as per the filing. Its CIN U70102MH2015PTC270197 and GSTIN 27AANCA9050G1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ashiyana Infinity Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ashiyana Infinity Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ashiyana Infinity Phase 1?

The professionals named in the filing: Architect: Abhikalpa Architects & Interior Designer; Engineer: Adharshila Consultants; Chartered Accountant: CA Shrikant D Dongre. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ashiyana Infinity Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ashiyana Infinity Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ashiyana Infinity Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.