ARTHA

By AUM LIFESPACES

RG-MH-18034 · RERA P51800056140 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
14 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
35 of 50Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

ARTHA is a Residential / Group Housing project by AUM LIFESPACES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056140 on 16 May 2024. Possession is promised by 19 Dec 2027. 15 of the 50 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameARTHA
  • TypeResidential / Group Housing
  • Location
    • 18th ROAD
    • Khar West Mumbai
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400052
  • Pincode400052
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056140
  • ReraGenie IDRG-MH-18034

Builder

  • NameAUM LIFESPACES
  • Entity typePartnership
  • GSTIN27ABIFA6287G1Z5
  • PartnersSUDHIR PARIKH, SAHIL PARIKH, RAJAN BANDELKAR, SUMIT MODY, SHYAMAL MODY

Key dates

this monthRegisteredMay 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion19 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Current status

30%15 of 50 units booked
67.5%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARTHA A WINGNA191626026
ARTHA B WINGNA191624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

ARTHA A WING89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
ARTHA B WING89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered122
BuildingClosed/CoveredTotal
ARTHA A WING6161
ARTHA B WING6161

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,264 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Jul 2025
LandownerVillageDistrict
NUGGET COOPERATIVE HOUSING SOCIETY LIMITEDBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6992.31
Proposed, not sanctioned5,682 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch2-KHAR WEST MUMBAI
Estimated costRs 160.48 cr
Cost incurredRs 108.30 cr
Work done67.49%
BuildingWingEstimatedIncurred
-NARs 80.24 crRs 54.15 cr
ARTHA A WINGNARs 40.12 crRs 27.07 cr
ARTHA B WINGNARs 40.12 crRs 27.07 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYMS CONSULTANTS LTD
EngineerDINESH KUMAR P SINGH SINGH
EngineerChaitanya R Mehta
Chartered AccountantSandeep Shah and Associates
Chartered AccountantA.A. Noorsumar & Associates
PartnerRole in project
AUM LIFESPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 19 Dec 2027

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form - 1- S.pdf17 Jun 2026
Withdrawal Update Form 2File: Withdrawal Application Form 2 - S.pdf17 Jun 2026
Withdrawal Update Form 3File: AUM ARTHA CA CERTIFICATE DT 11th June 2026.pdf17 Jun 2026
Withdrawal Update Form 1File: Withdrawal Application Form 1 (Artha).pdf29 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form 2 (Artha).pdf29 Apr 2026
Withdrawal Update Form 3File: Withdrawal Application Form 3 (Artha).pdf29 Apr 2026
Withdrawal Update Form 1File: ARTHA - (Aum Lifespaces) Architect Certificate.pdf23 Jan 2026
Withdrawal Update Form 1File: ARTHA- Architecture Certificate-Form 1.pdf23 Jan 2026
Withdrawal Update Form 2File: ARTHA - (Aum Lifespaces) Eng Certificate.pdf23 Jan 2026
Withdrawal Update Form 2File: ARTHA- Engineer Certificate-Form 2.pdf23 Jan 2026
Withdrawal Update Form 3File: ARTHA - (Aum Lifespaces) CA Certificate 28th Aug 2025_compressed.pdf23 Jan 2026
Withdrawal Update Form 3File: ARTHA- CA Certificate - Form 3 -F.pdf23 Jan 2026
Withdrawal Update Form 1File: ARTHA- Architecture Certificate-Form 1.pdf17 Jan 2026
Withdrawal Update Form 2File: ARTHA- Engineer Certificate-Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: ARTHA- CA Certificate - Form 3 -F.pdf17 Jan 2026
Withdrawal Update Form 1File: ARTHA - (Aum Lifespaces) Architect Certificate.pdf29 Aug 2025
Withdrawal Update Form 2File: ARTHA - (Aum Lifespaces) Eng Certificate.pdf29 Aug 2025
Withdrawal Update Form 3File: ARTHA - (Aum Lifespaces) CA Certificate 28th Aug 2025_compressed.pdf29 Aug 2025
Withdrawal Update Form 1File: ARTHA - (Aum Lifespaces) Architect Certificate.pdf23 Aug 2025
Withdrawal Update Form 2File: Aum Lifespaces - Engineering Certificate 30th June 2024.pdf23 Aug 2025
Withdrawal Update Form 3File: Aum Lifespaces - Form 3 CA Certificate Rera 30th June 2024.pdf23 Aug 2025
Layout approvalFile: Drawing-165-1.pdf29 Mar 2025
Layout approvalFile: Drawing-165-2.pdf29 Mar 2025
Layout approvalFile: Drawing-165-3.pdf29 Mar 2025
Layout approvalFile: Drawing-165-4.pdf29 Mar 2025
Building plan approvalFile: 2463994Amendletter_signed.pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Drawing-165-1.pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Drawing-165-2.pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Drawing-165-3.pdf29 Mar 2025
Copy of Layout Approval (in case of layout)File: Drawing-165-4.pdf29 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2463994Amendletter_signed.pdf29 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARTHA Form 3 CA 18th Feb 2025compressed.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARTHA Engineers Certificate 5th Feb 2025.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aum Lifespaces -Architects Certificate 4th Dec 2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aum Lifespaces - Form 3 CA Certificate 30th Sept 2024 compressed.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aum Lifespaces - Engineer Certificate 30th Sept 2024.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AUM Lifespaces(Artha) Form 5 April 23 to March 24.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aum Lifespaces -Architect's Certificate Rera Cft 15th July 2024.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aum Lifespaces - Engineering Certificate 30th June 2024.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aum Lifespaces - Form 3 CA Certificate Rera 30th June 2024.pdf12 Aug 2024
Building plan approvalFile: Amended IOD.pdf26 Jul 2024
Layout approvalFile: Artha Amended Drawing 18th June 2024 pages 1 to 3.pdf26 Jul 2024
Layout approvalFile: Artha Amended Drawing 18th June 2024 pages 1-3.pdf26 Jul 2024
Layout approvalFile: Artha Amended Drawing 18th June 2024 pages 4-7.pdf26 Jul 2024
Layout approvalFile: Architect Letter dated 25th July 2024.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: Artha Amended Drawing 18th June 2024 pages 1 to 3.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: Artha Amended Drawing 18th June 2024 pages 1-3.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: Artha Amended Drawing 18th June 2024 pages 4-7.pdf26 Jul 2024
Copy of Layout Approval (in case of layout)File: Architect Letter dated 25th July 2024.pdf26 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOD.pdf26 Jul 2024
Other - LegalFile: Architect Letter dated 25th July 2024.pdf26 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sahil Parikh Annexure A.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sudhir Parikh Annexure A.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of interest In Real estate Organization Sumit Mody Aum Lifespaces.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of interest Shyamal.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Of interest Rajan.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Revised CA Certificate_compressed.pdf25 Apr 2024
Copy of the legal title reportFile: Nugget Title Certificate with Highlight_compressed.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: No encumbance legal.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: No encumbrance Finance (save and except clause).pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: No encumbance legal.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: No encumbrance Finance (save and except clause).pdf12 Apr 2024
Other - TechnicalFile: Order 50 Notarised.pdf11 Apr 2024
Declaration in FORM BFile: Form B New Draft- Society compressed.pdf10 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank Account_0001.pdf10 Apr 2024
Layout approvalFile: Drawing (5) - converted.pdf1 Apr 2024
Copy of Layout Approval (in case of layout)File: Drawing (5) - converted.pdf1 Apr 2024
Building plan approvalFile: 2356153_IOD_signed.pdf22 Mar 2024
PAN CardFile: AUM LIFESPACES - PAN.pdf22 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumberance Finance.pdf22 Mar 2024
Details of encumbrances concerned to LegalFile: No Encumberance Finance.pdf22 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 2356153_IOD_signed.pdf22 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 2406614_FirstCC_signed.pdf22 Mar 2024
Declaration about Commencement CertificateFile: Declaration about CC_0001.pdf22 Mar 2024
Declaration in FORM BFile: Form B- Promoter compressed.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- architect certificate_0001.pdf22 Mar 2024
CERSAI detailsFile: AUM LIFESPACES CERSAI.pdf22 Mar 2024
Proforma of Allotment letterFile: Allotment Letter- RERA.pdf22 Mar 2024
Proforma of Agreement for saleFile: AFS-RERA.pdf22 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation report- Allotment letter_0001.pdf22 Mar 2024

How this compares with Mumbai Suburban

30%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARTHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khar West Mumbai6,700+ in Mumbai Suburban

2 kmARTHACompleted 112Lapsed / revoked 56Other 129Dot size: filed unitsN

Filed coordinates, straight-line distance. 297 registered projects within 2 km.

Builder: AUM LIFESPACES

AUM LIFESPACES has 1 registration on MahaRERA, including ARTHA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ARTHA is delayed beyond 19 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARTHA?

The registered promoter entity is AUM LIFESPACES, a partnership as per the filing. Its GSTIN 27ABIFA6287G1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARTHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARTHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARTHA?

The professionals named in the filing: Architect: YMS CONSULTANTS LTD; Engineer: DINESH KUMAR P SINGH SINGH; Engineer: Chaitanya R Mehta; Chartered Accountant: Sandeep Shah and Associates; Chartered Accountant: A.A. Noorsumar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARTHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARTHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARTHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.