Registration approved Residential/Group Housing project

ARNAVA HOMES

By ARANAVA BUILDERS AND DEVELOPERS

RG-KA-06510 · RERA PRM/KA/RERA/1257/333/PR/181031/002106 · Last updated on RERA Karnataka portal: 9 Oct 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Oct 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 89 documents Report an error

ARNAVA HOMES is a Residential/Group Housing project by ARANAVA BUILDERS AND DEVELOPERS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/333/PR/181031/002106 on 31 Oct 2018. Possession is promised by 20 Oct 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameARNAVA HOMES
  • TypeResidential/Group Housing
  • Location
    • Dakshina Kannada
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1257/333/PR/181031/002106
  • ReraGenie IDRG-KA-06510

Builder

  • NameARANAVA BUILDERS AND DEVELOPERS
  • Entity typePartnership Firm
  • Authorized SignatoryKIRAN KUMAR SHETTY

Key dates

this monthRegisteredOct 2018First promiseOct 2019Revised toOct 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Oct 2018
  • Promised completion20 Oct 2020
  • Revised completionRevised to 20 Oct 2020 (originally 20 Oct 2019)
  • Buildings1 building record
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARNAVA HOMES-----62

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 9 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 9 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,630 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.32 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionOct 2019 → Apr 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1257/333/PR/201021/002106Apr 2021 → Oct 2020

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed89

As listed on the registration, under the names the promoter filed them with; the newest 80 of 89 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/333/PR/181031/002106 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Affidavit u/s 18(1)File: Affidavit us 18(1).pdf9 Oct 2020
Commencement CertificateFile: licence_1525946042913.pdf9 Oct 2020
Affidavit for Extension and Form BFile: Affidavit for Extension and form B.pdf9 Oct 2020
CertificateFile: arnava firm.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architects Certificate Work completed_compressed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineers Certificate Work completed_compressed.pdf-
CA Certificate for Funds UtilizationFile: CA certificate - fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architects Certificate Pending work_compressed.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineers Certificate Pending work_compressed.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate - funds required.pdf-
AffidavitFile: Affidavit 1_compressed.pdf-
Latest Encumbrance CertificateFile: EC (1)_1525946042904.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent Letter-Extension Signed_compressed.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: CANARA BANK STMT_compressed.pdf-
Document 2File: Bharat Bank Stmt.pdf-
Document 3File: Form B_compressed.pdf-
Document 4File: Consent Letter-Bank account Signed_compressed.pdf-
Document 5File: licence_1525946042913.pdf-
Document 6File: Affidavit.pdf-
Document 7File: 715 account stmt.pdf-
licence-
buiding plan black)-
single site (1)-
sale deed draft - arnava-
final draft sale deed arnava-
combinepdf-
section-min-
area development plan-
not app-
brouchers arnava (1)-
compresspdf_q1OftofZ-
EC (1)-
katha (1)-
mou (1)-
not app-
conversion 9th aug 2018-
not app-
not app-
not app-
not app-
fire (1)-
not app-
not app-
not app-
not app-
not app-
not app-
not app-
Unnamed document-
not app-
not app-
not app-
not app-
not app-
not app-
not app-
not app-
not app-
not app-
not app-
not app-
Balance Sheet 2016 - 2017File: not app1 (1).pdf-
Balance Sheet 2015 - 2016File: not app1 (1).pdf-
Balance Sheet 2014 - 2015File: not app1 (1).pdf-
Audited Profit and Loss Statement 2016 - 2017File: not app1 (1).pdf-
Audited Profit and Loss Statement 2015 - 2016File: not app1 (1).pdf-
Audited Profit and Loss Statement 2014 - 2015File: not app1 (1).pdf-
Director's Report 2016 - 2017File: not app1 (1).pdf-
Director's Report 2015 - 2016File: not app1 (1).pdf-
Director's Report 2014 - 2015File: not app1 (1).pdf-
Cash Flow Statement 2016 - 2017File: not app1 (1).pdf-
Cash Flow Statement 2015 - 2016File: not app1 (1).pdf-
Auditor's Report 2016 - 2017File: not app1 (1).pdf-
Auditor's Report 2015 - 2016File: not app1 (1).pdf-
Auditor's Report 2014 - 2015File: not app1 (1).pdf-
Income Tax Return Acknowledgement 2016 - 2017File: not app1 (1).pdf-
Income Tax Return Acknowledgement 2015 - 2016File: not app1 (1).pdf-
Income Tax Return Acknowledgement 2014 - 2015File: not app1 (1).pdf-
declartion (1)-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep ARNAVA HOMES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: ARANAVA BUILDERS AND DEVELOPERS

ARANAVA BUILDERS AND DEVELOPERS has 1 registration on RERA Karnataka, including ARNAVA HOMES. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if ARNAVA HOMES is delayed beyond 20 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ARNAVA HOMES?

The registered promoter entity is ARANAVA BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ARNAVA HOMES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in ARNAVA HOMES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARNAVA HOMES. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARNAVA HOMES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.