ARIHANT TOWER

By ARIHANT REALTY

RG-MH-17649 · RERA P51700055564 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 25.00 crore secured on the land, in favour of GODREJ FINANCE LIMITED
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 50%
69 of 89Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

ARIHANT TOWER is a Others project by ARIHANT REALTY in Thane, Maharashtra, registered with MahaRERA as P51700055564 on 2 Apr 2024. Possession is promised by 31 Dec 2028. 20 of the 89 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameARIHANT TOWER
  • TypeOthers
  • Location
    • NAVGHAR ROAD
    • BHAYANDAR
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401105
  • Pincode401105
  • RERA no.P51700055564
  • ReraGenie IDRG-MH-17649

Builder

  • NameARIHANT REALTY
  • Entity typePartnership
  • PartnersAARTI RAJKUMAR MUTHA, NIDHI DILIP KATARIA, RAJESH P PATEL, VIREN RAJKUMAR MUTHA, AMITH B MUTHA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredApr 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

22%20 of 89 units booked
24.9%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARIHANT TOWERNA2017721789

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 50%.

ARIHANT TOWER: 14% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,760 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofGODREJ FINANCE LIMITED
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on4 Jun 2026
LandownerVillageDistrict
INDERS INFRAMira-Bhayandar (M Corp.)Thane
SHREE MANSADEVI CO-OPERATIVE HSG SOC LTDMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMira-Bhayandar Municipal Corporation
Permissible FSI7937.94
Proposed, not sanctioned5,938 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAYANDAR BRANCH SHOP NO 1 2 AND 9 ARIHANT DARSHAN 90 FT ROAD BHAYANDAR 401101
Estimated costRs 22.37 cr
Cost incurredRs 5.57 cr
Work done24.88%
BuildingWingEstimatedIncurred
ARIHANT TOWERNARs 15.66 crRs 3.90 cr
-NARs 6.71 crRs 1.67 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH AND ASSOCIATES
EngineerNEEL DHOLIA
Chartered AccountantR D LUKAD
Chartered AccountantJASMITA MODI
Chartered AccountantRAMESH DHONDIRAM LUKAD
PartnerRole in project
ARIHANT REALTY-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600295Bhakti AchrekarARIHANT REALTY28/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Arihant Tower.pdf29 Jun 2026
Withdrawal Update Form 2File: arihant Form2 (1).pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 2025-26 QUATER 4.pdf29 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf27 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf27 Jun 2026
Form 5 (FY 2024-2025)File: ARIHANT REALTY 2024-25.pdf27 Jun 2026
Form 5 (FY 2025-2026)File: ARIHANT REALTY 2025-26.pdf27 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf13 May 2026
Withdrawal Update Form 2File: DocScanner 20-Jul-2024 12-31 pm.pdf13 May 2026
Withdrawal Update Form 3File: FORM 2.pdf13 May 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Feb 2026
Withdrawal Update Form 2File: DocScanner 20-Jul-2024 12-31 pm.pdf25 Feb 2026
Withdrawal Update Form 3File: FORM 2.pdf25 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Dec 2025
Withdrawal Update Form 2File: DocScanner 20-Jul-2024 12-31 pm.pdf30 Dec 2025
Withdrawal Update Form 3File: FORM 2.pdf30 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arihant realty (1).pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arihant realty.pdf13 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arihant realty.pdf17 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 signed (1)_compressed.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mob 9619617434_compressed.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: ARIHANT_compressed.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner 20-Jul-2024 12-31 pm.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2.pdf22 Jul 2024
Layout approvalFile: GetUserDocumentFileContent(5)(1).pdf19 Mar 2024
Copy of Layout Approval (in case of layout)File: GetUserDocumentFileContent(5)(1).pdf19 Mar 2024
Other - TechnicalFile: Arihant-Undertaking.pdf12 Mar 2024
Building plan approvalFile: 02_.pdf4 Mar 2024
Building plan approvalFile: 03_.pdf4 Mar 2024
Building plan approvalFile: 04_.pdf4 Mar 2024
Building plan approvalFile: 05_.pdf4 Mar 2024
Building plan approvalFile: 06_.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 02_.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 03_.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 04_.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 05_.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 06_.pdf4 Mar 2024
PAN CardFile: PAN CARD ARIHANT REALTY.pdf5 Feb 2024
Copy of the legal title reportFile: TITLE ARIHANT REALTY RERA.pdf5 Feb 2024
Details of encumbrances concerned to FinanceFile: Legal En.pdf5 Feb 2024
Details of encumbrances concerned to FinanceFile: Finance En.pdf5 Feb 2024
Details of encumbrances concerned to LegalFile: Legal En.pdf5 Feb 2024
Details of encumbrances concerned to LegalFile: Finance En.pdf5 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 Feb 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf5 Feb 2024
Declaration in FORM BFile: RERA FORM-B ARIHANT REALTY.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM-2 ENGINEERS.pdf5 Feb 2024
CERSAI detailsFile: RERA CERSAI.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM-3 CA.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA DISCLOSURE SUMIT.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA DISCLOSURE AARTI.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA DISCLOSURE AMIT.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA DISCLOSURE NIDHI.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA DISCLOSURE RAJESH.pdf5 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA DISCLOSURE VIREN.pdf5 Feb 2024
Proforma of Agreement for saleFile: Rera Draft Agreement- Arihant Realty.pdf5 Feb 2024
Proforma of Allotment letterFile: rera allotment letter format.pdf5 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA FORMAT-Seperate.pdf5 Feb 2024
Deviation Report with respect to Allotment letterFile: AL-En.pdf5 Feb 2024
Deviation Report with respect to model copy of AgreementFile: AG-EN.pdf5 Feb 2024

How this compares with Thane

22%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHAYANDAR7,600+ in Thane

Builder: ARIHANT REALTY

Arihant Realty has 2 registrations on MahaRERA, including Arihant Baug and ARIHANT TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ARIHANT TOWER is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT TOWER?

The registered promoter entity is ARIHANT REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT TOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT TOWER?

The professionals named in the filing: Architect: ANISH AND ASSOCIATES; Engineer: NEEL DHOLIA; Chartered Accountant: R D LUKAD; Chartered Accountant: JASMITA MODI; Chartered Accountant: RAMESH DHONDIRAM LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.