ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / ARIHANT HEIGHTS

Registered No litigation declared Residential / Group Housing project

ARIHANT HEIGHTS

By ARIHANT INFRASTRUCTURE COMPANY

RG-MH-64563 · RERA P51800015068 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 66 months
  • 5 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 66 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 85%
57 of 104Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

ARIHANT HEIGHTS is a Residential / Group Housing project by ARIHANT INFRASTRUCTURE COMPANY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800015068 on 23 Jan 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 66 months from the original filing. 47 of the 104 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameARIHANT HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • PARSHIWADI
    • GHATKOPAR WEST
    • Kurla
    • Mumbai Suburban
    • 400086
  • Pincode400086
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800015068
  • ReraGenie IDRG-MH-64563

Builder

  • NameARIHANT INFRASTRUCTURE COMPANY
  • Entity typePartnership
  • PartnersVIMAL MOHANLAL JAIN, DHANESH RUPRAJ JAIN, RUPRAJ THANMAL JAIN, RAJENDRAKUMAR PUKHRAJ JAIN, BHUPENDRA MOHANLAL JAIN, BHARAT RAMESHCHANDRA BHANSALI
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2018First promiseJun 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jan 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed107 files

Current status

45%47 of 104 units booked
51.2%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARIHANT HEIGHTSNA13111004104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

ARIHANT HEIGHTS: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,673 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI5325.42
Proposed, not sanctioned5,325 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDR B A ROAD PAREL
Estimated costRs 14.00 cr
Cost incurredRs 7.17 cr
Work done51.21%
BuildingWingEstimatedIncurred
ARIHANT HEIGHTSNARs 13.30 crRs 7.17 cr
-NARs 70.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMEER V KULKARNI
ArchitectArcho Consultant
EngineerS S CONS
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantVikas Abhang & Associates
PartnerRole in project
ARIHANT INFRASTRUCTURE COMPANY-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019062Jun 2021 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 52.5% allottees for purpose of extension of RERA registration period of the said project.

EXT51800013642Jun 2021 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 55.56% allottees for purpose of extension of RERA registration period of the said project.

EXT51800009104Jun 2021 → Jun 2022

Reason as filed by the promoterThe Project has been delayed on account of various reasons beyond our control and more particularly due to Lockdown announced on account of pandemic of Covid-19. Due to this unprecedented crises, we have witnessed the reverse migration of labourers and shortage of liquidity in the market. Moreover various private and Government offices have not been working at full strength and the complete supply chain has broken down. It appears that it is going to take a lot of time to normalize the real estate industry.

EXT51800025556Jun 2021 → Dec 2025

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges, delays in obtaining the Occupancy Certificate (OC), and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We kindly request an extension until 31-12-2025 to complete the project and fulfil all regulatory requirements.

EA14012619438Jun 2021 → Dec 2026

Reason as filed by the promoterThe delay in obtaining the OC is solely due to procedural requirements and administrative processing by the authority, which is beyond the control of the promoter. To ensure full regulatory compliance and to avoid any technical lapse in RERA validity during this period, we are applying for an extension of the project registration. No further construction activity is pending, and the extension is required only until the OC is formally issued.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12500157shivam guptaARIHANT INFRASTRUCTURE COMPANY17/01/2025
CC12602019Bhavana Bharat NandeARIHANT INFRASTRUCTURE COMPANY05/04/2026
CC12602674Rajendra Pandurang ShetkeARIHANT INFRASTRUCTURE COMPANY08/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Arihant Heights as on March 2026.pdf12 Jun 2026
Withdrawal Update Form 2File: Form 2 - Arihant Heights as on March 2026.pdf12 Jun 2026
Withdrawal Update Form 3File: Form 3 - Arihant Heights as on March 2026.pdf12 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 - Arihant Heights FY 24-25.pdf9 Jun 2026
Withdrawal Update Form 1File: Form 1 - Arihant Heights as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 2File: Form 2 - Arihant Heights as on Dec 2025.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 - Arihant Heights as on Dec 2025.pdf4 Feb 2026
Form 1File: Form 1 - Arihant Heights as on June 2025.pdf8 Dec 2025
Form 2File: Form 2 - Arihant Heights as on June 2025.pdf8 Dec 2025
Form 3File: Form 3 - Arihant Heights as on June 2025.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Arihant Heights as on June 2025.pdf8 Dec 2025
Form 1File: Form 1 - Arihant Heights as on Sep 2025.pdf8 Dec 2025
Form 2File: Form 2 - Arihant Heights as on Sep 2025.pdf8 Dec 2025
Form 3File: Form 3 - Arihant Heights as on Sep 2025.pdf8 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Arihant Heights as on Sep 2025.pdf8 Dec 2025
Certificates of CA (Form 3)File: Form 3 Arihant Heights as on 31st March 2025.pdf20 Apr 2025
Certificates of CA (Form 3)File: 14 Certificates of CA (Form 3).pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arihant Heights as on 31st March 2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Arihant Heights as on 2023-24.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arihant Heights as on Dec 2023.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arihant Heights as on March 2024.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arihant Heights as on June 2024.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf4 Mar 2025
Declaration in FORM BFile: Affidavit Cum Declaration Arihant Heights (1)_11zon.pdf24 Feb 2025
Certificates of CA (Form 3)File: FORM 3 As On 31-12-2024 Of Arihant Heights (3)_11zon.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 As On 31-12-2024 Of Arihant Heights (3)_11zon.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: DocScanner 23-Jan-2025 18-59 (1).pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DocScanner 23-Jan-2025 18-58 (1).pdf29 Jan 2025
Certificates of CA (Form 3)File: Form 3 Arihant Heights as on 30th June 2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 Arihant Heights as on 31st December 2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 Arihant Heights as on 30th Sep 2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 Arihant Heights as on 31st March 2024.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Arihant Heights as on Sep 2022.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Arihant Heights as on June 2022.pdf20 Jan 2025
Certificates of CA (Form 3)File: Form 3 - Arihant Heights as on March 2022.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on March 2022.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on December 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on September 2022.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on December 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on Sept 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on June 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on March 2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on June 2022.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Arihant Heights FY 23-24.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 As On 31-12-24 Of Arihant Heights_compressed.pdf18 Jan 2025
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-24_11zon.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: INVENTORY 03202024.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec.pdf15 Mar 2024
Certificates of CA (Form 3)File: Form 3 Dec_11zon.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: Consents.pdf9 Feb 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf9 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf9 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf9 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Adobe Scan 09-Feb-2024 (3).pdf9 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf9 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on Sept 2023 (SIGNED).pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on March 2023.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arihant Heights as on June 2023.pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf1 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arihant.pdf30 Jan 2024
Certificates of CA (Form 3)File: FORM 3 MARCH 202301232024_11zon.pdf23 Jan 2024
Certificates of CA (Form 3)File: FORM 3 JUNE 202301232024_11zon.pdf23 Jan 2024
Certificates of CA (Form 3)File: FORM 3 SEPT 202301232024_11zon.pdf23 Jan 2024
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION001.pdf11 Dec 2023
Disclosure of sold/ booked inventoryFile: Adobe Scan 08-Nov-2023 (1).pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: (Form 2A FY 2022-23).pdf8 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Arihant Heights as on December 2022.pdf14 Apr 2023
Certificates of CA (Form 3)File: Form_3_Arihant_Heights_as_on_December 2022.pdf14 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 of Arihant Heights FY 18-19.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 of Arihant Heights FY 2019-20.pdf13 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 of Arihant Heights FY 2020-21.pdf13 Apr 2023
Declaration about Commencement CertificateFile: Arihant Heights Format D.pdf27 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- Arihant Heights.pdf21 Jan 2023
Disclosure of sold/ booked inventoryFile: Adobe Scan 18-Jan-2023 (1).pdf18 Jan 2023
Declaration about Commencement CertificateFile: Format D.pdf17 Jan 2023

How this compares with Mumbai Suburban

45%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 66 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR WEST6,700+ in Mumbai Suburban

2 kmARIHANT HEIGHTSCompleted 115Lapsed / revoked 66Other 111Dot size: filed unitsN

Filed coordinates, straight-line distance. 292 registered projects within 2 km.

Builder: ARIHANT INFRASTRUCTURE COMPANY

ARIHANT INFRASTRUCTURE COMPANY has 3 registrations on MahaRERA, including ARIHANT RESIDENCY and ARIHANT HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ARIHANT HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT HEIGHTS?

The registered promoter entity is ARIHANT INFRASTRUCTURE COMPANY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT HEIGHTS?

The professionals named in the filing: Architect: SAMEER V KULKARNI; Architect: Archo Consultant; Engineer: S S CONS; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Vikas Abhang & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.