Home / Browse projects / Sangli, Maharashtra / ARIHANT CAPITAL
ARIHANT CAPITAL
RG-MH-41913 · RERA P53100019171 · Last updated on MahaRERA portal: 23 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT CAPITAL is a Others project by ARIHANT DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100019171 on 9 Jan 2019. Possession is promised by 25 Dec 2026. The completion date has moved by 36 months from the original filing. 9 of the 30 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameARIHANT CAPITAL
- TypeOthers
- Location
- VIJAYNAGAR
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416416
- Pincode416416
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100019171
- ReraGenie IDRG-MH-41913
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Jan 2019
- Promised completion25 Dec 2026
- Revised completionRevised to 25 Dec 2026 (originally 29 Dec 2023)
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 23 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ARIHANT CAPITAL | NA | 7 | 7 | 12 | 18 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
ARIHANT CAPITAL: 88% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VIJAYRAO VASANTRAO CHAVAN | Sangli Miraj Kupwad (M Corp.) | Sangli |
| VIJAY GANPATRAO SHINDE | Mhaisal(s) | Sangli |
| VAIJAYANTI VITTHAL KAMBLE | Sangli Miraj Kupwad (M Corp.) | Sangli |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ARIHANT CAPITAL | NA | Rs 2.87 cr | Rs 2.02 cr |
| - | NA | Rs 5.00 lakh | Rs 9.00 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SACHIN KANOJE |
| Engineer | AJAY NARAYAN DESAI |
| Chartered Accountant | GHANSHYAM B KHATAVKAR |
| Partner | Role in project |
|---|---|
| ARIHANT DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO LOW BOOKING BECAUSE INTEREST RATE HIGH & LABOUR AND MATERIAL COST IS INCREASE .
Reason as filed by the promoterLOCKDOWN RATE HIKE OF MATERIAL AND LABOUR BOOKING SLOW DETAILS REASON ATTACHED SEPRATLY
Reason as filed by the promoterDue To Material Shortage , Labor Shortage , Slow Booking due to Corona & Flood ,
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jan 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 25 Dec 2026
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: Form 1 Up To Jun 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Up To Sep 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Up To Dec 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Up To Jun 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Up To Sep 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Up To Dec 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Up To Jun 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Up To Sep 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Up To Dec 2025.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Up To Dec 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Up To Dec 2025.pdf | 9 Mar 2026 |
| Declaration in FORM BFile: form b.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold dec 2024.pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold dec 2025.pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a 23-24.pdf | 14 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC 23.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAR 24.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUN 24.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEP 24.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC 24.pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan Mar 24, 2025 (1).pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan Mar 24, 2025 (2).pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan Mar 24, 2025 (3).pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan Mar 24, 2025 (4).pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan Mar 24, 2025 (5).pdf | 24 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Adobe Scan Mar 24, 2025 (13).pdf | 24 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Adobe Scan Mar 24, 2025.pdf | 24 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: pdf 2 Ac_compressed.pdf | 24 Mar 2025 |
| Certificates of CA (Form 3)File: DEC 23_compressed.pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: MAR 24_compressed.pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: JUN 24_compressed.pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: SEP 24_compressed.pdf | 22 Mar 2025 |
| Certificates of CA (Form 3)File: 31 DEC 24_compressed.pdf | 22 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM A KANOJE.pdf | 16 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ARIHANT.pdf | 16 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY FORM.pdf | 16 Feb 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200297146366_For_Asset_Based_Search_16_02_2024_17_31_21_032.pdf | 16 Feb 2024 |
| Certificates of CA (Form 3)File: cA.pdf | 16 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: deepa - a.pdf | 16 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: mahavir - a.pdf | 16 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (2).pdf | 25 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf | 25 Jan 2024 |
| Declaration in FORM BFile: FORM B.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: LATEST SOLD UNSOLD INVENTORY.pdf | 11 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 1.pdf | 15 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 2.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 15 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: CA FORM.pdf | 15 Dec 2023 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 15 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 27 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 27 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGI.pdf | 27 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY.pdf | 27 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 1.pdf | 27 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 2.pdf | 27 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 3.pdf | 27 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 4.pdf | 27 Oct 2023 |
| Certificates of CA (Form 3)File: FORM 3 A_compressed.pdf | 27 Oct 2023 |
| Certificates of CA (Form 3)File: FORM 3 B_compressed.pdf | 27 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE.pdf | 2 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3_compressed.pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Adobe Scan Dec 09, 2022 (2).pdf | 9 Dec 2022 |
| PAN CardFile: pan card.pdf | 28 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Other.pdf | 22 Nov 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about seprate bank acc for real estate project.pdf | 25 Aug 2022 |
| Building plan approvalFile: dwg.pdf | 7 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ARIHANT CAPITAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VIJAYNAGAR790+ in Sangli
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
VISION CITY
VISION GROUP
NAKSHTRA
SHIV-NAKSHTRA DEVELOPERS LLP
SAHYADRISIDDHI
SAHYADRIDEVELOPERS
See every Sangli project, with the district possession charts
Builder: ARIHANT DEVELOPERS
Arihant Developers has 9 registrations on MahaRERA, including ARIHANT A & B WING and Sukruti Pinnacle. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if ARIHANT CAPITAL is delayed beyond 25 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT CAPITAL?
The registered promoter entity is ARIHANT DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABKFA3644B1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT CAPITAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARIHANT CAPITAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT CAPITAL?
The professionals named in the filing: Architect: SACHIN KANOJE; Engineer: AJAY NARAYAN DESAI; Chartered Accountant: GHANSHYAM B KHATAVKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT CAPITAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback