Home / Browse projects / Raigarh, Maharashtra / ARIHANT ARSHIYA PHASE IV

Registered No litigation declared Residential / Group Housing project

ARIHANT ARSHIYA PHASE IV

By ARIHANT SUPERSTRUCTURES LIMITED

RG-MH-50719 · RERA P52000056037 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 65%
127 of 138Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

ARIHANT ARSHIYA PHASE IV is a Residential / Group Housing project by ARIHANT SUPERSTRUCTURES LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000056037 on 10 May 2024. Possession is promised by 31 Dec 2030. 11 of the 138 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameARIHANT ARSHIYA PHASE IV
  • TypeResidential / Group Housing
  • Location
    • Dahivali Tarf Boreti
    • Sajgaon B O
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • RERA no.P52000056037
  • ReraGenie IDRG-MH-50719

Builder

  • NameARIHANT SUPERSTRUCTURES LIMITED
  • Entity typeCompany
  • CINL51900MH1983PLC029643
  • GSTIN27AABCS1848L1Z2
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations13 more →
  • Completed5 of 14

Key dates

this monthRegisteredMay 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

8%11 of 138 units booked
12.3%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CatalinaNA15141380138

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 65%.

Catalina: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered39
Open Space36

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,943 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Oct 2025

Approvals and building plan

Sanctioning authorityMAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION LIMITED
Permissible FSI8383.07
Proposed, not sanctioned8,383 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOpposite Turbhe Railway Station
Estimated costRs 24.96 cr
Cost incurredRs 3.06 cr
Work done12.27%
BuildingWingEstimatedIncurred
CatalinaNARs 23.64 crRs 3.06 cr
-NARs 1.31 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogita Bhandarkar
EngineerKALEEM SAYYAD
EngineerSatish Mhatre
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantUmmed Jain & Co.
PartnerRole in project
ARIHANT SUPERSTRUCTURES LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12401231VIKASH PRADHANARIHANT SUPERSTRUCTURES LIMITED25/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 5 Form 1_ARSHIYA PHASE IV_310326.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2_Arshiya Ph IV_250326.pdf16 Apr 2026
Withdrawal Update Form 3File: 5 Form 3_Arshiya Ph IV_250326.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1_Arshiya Phase IV_31122025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2_Arshiya Ph IV_31122025.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3_Arshiya Ph IV_31122025.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1_Arshiya Phase IV_31122025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2_Arshiya Ph IV_31122025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3_Arshiya Ph IV_31122025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1_ARSHIYA PHASE IV_30092025.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2_Arshiya Ph IV_30092025.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3_ARSHIYA PHASE IV_30092025.pdf24 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_Arihant Arshiya Phase IV.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Arshiya Phase IV.pdf4 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Adarsh Ph 1_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Arshiya Ph-IV_310325.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Arshiya Ph-IV_310325_SIGNED.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Arshiya 4_31032025_SIGNED_compressed.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Arshiya -4 V-1 - SIGNED.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Arshiya IV.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Arshiya Phase IV.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Arshiya IV.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ARIHANT ARSHIYA PHASE IV_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arshiya Phase 4_SIGNED.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Arshiya IV 30062024.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arihant Arshiya Phase IV.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Arshiya Phase IV signed.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Architect Work Completion Certificate upto Plinth Level.pdf7 May 2024
Layout approvalFile: 1.pdf29 Apr 2024
Layout approvalFile: 2.pdf29 Apr 2024
Layout approvalFile: 4.pdf29 Apr 2024
Layout approvalFile: 5.pdf29 Apr 2024
Copy of Layout Approval (in case of layout)File: 1.pdf29 Apr 2024
Copy of Layout Approval (in case of layout)File: 2.pdf29 Apr 2024
Copy of Layout Approval (in case of layout)File: 4.pdf29 Apr 2024
Copy of Layout Approval (in case of layout)File: 5.pdf29 Apr 2024
Other - TechnicalFile: format D.PDF29 Apr 2024
Other - TechnicalFile: CLARIFICATION.PDF29 Apr 2024
Other - TechnicalFile: Form A Declaration Cum Undertaking.PDF4 Apr 2024
Other - LegalFile: Merger Order.pdf15 Mar 2024
Other - LegalFile: AGREEMENT TO SALE 21-2A.PDF14 Mar 2024
Other - LegalFile: KHAREDIKHAT 14 GUNTHA SNO 21-2A.PDF14 Mar 2024
Other - LegalFile: KHAREDIKHAT 14 GUNTHA SNO 21-2A_1.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 20-1,2 plus 3, 25-11.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 20-1,2 plus 3, 25-11_1.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 21-1,2, 23-2, 25-9.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 21-1,2, 23-2, 25-9_1.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 21-1.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 21-1_1.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 21-2B.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 21-2B_1.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 22-3.PDF14 Mar 2024
Other - LegalFile: Sale Deed of 22-3_1.PDF14 Mar 2024
Other - LegalFile: Sale deed of 22-4.PDF14 Mar 2024
Other - LegalFile: Sale deed of 22-4_1.PDF14 Mar 2024
Copy of the legal title reportFile: TITLE REPORT__compressed.pdf4 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION.pdf21 Apr 2023
Other - LegalFile: ARSHIYA PROJECT LAYOUT _11zon.pdf21 Apr 2023
Other - LegalFile: Area Declaration.pdf5 Apr 2023
Other - FinanceFile: fORM B.pdf28 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA 170323.pdf17 Mar 2023
Details of encumbrances concerned to FinanceFile: Declaration for Encumbrances.PDF9 Mar 2023
Details of encumbrances concerned to LegalFile: Declaration for Encumbrances.PDF9 Mar 2023
Proforma of Agreement for saleFile: Draft Agreemnt to be upload on RERA dt 27-02-2023.pdf9 Mar 2023
Proforma of Allotment letterFile: Allotment Letter A_Arshiya Phase IV_RERA.pdf9 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.PDF9 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2 .pdf4 Mar 2023
Declaration in FORM BFile: ARSHIYA PROJECT- FORM B.PDF1 Mar 2023
CERSAI detailsFile: Cersai.pdf1 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf1 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Decl.pdf1 Mar 2023
Building plan approvalFile: Building approval.pdf27 Feb 2023
PAN CardFile: PAN Card_ASL.pdf27 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Building approval.pdf27 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: cOMMENCEMENT certificate.pdf27 Feb 2023
Declaration about Commencement CertificateFile: cc decl.pdf27 Feb 2023

How this compares with Raigarh

8%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ARSHIYA PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sajgaon B O5,900+ in Raigarh

Builder: ARIHANT SUPERSTRUCTURES LIMITED

ARIHANT SUPERSTRUCTURES LIMITED has 14 registrations on MahaRERA, including ARIHANT ARSHIYA PHASE II and ARIHANT ARSHIYA PHASE III. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT ARSHIYA PHASE IV is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ARSHIYA PHASE IV?

The registered promoter entity is ARIHANT SUPERSTRUCTURES LIMITED, a company as per the filing. Its CIN L51900MH1983PLC029643 and GSTIN 27AABCS1848L1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ARSHIYA PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT ARSHIYA PHASE IV?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT ARSHIYA PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ARSHIYA PHASE IV?

The professionals named in the filing: Architect: Yogita Bhandarkar; Engineer: KALEEM SAYYAD; Engineer: Satish Mhatre; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ARSHIYA PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ARSHIYA PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ARSHIYA PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.