Home / Browse projects / Raigarh, Maharashtra / ARIHANT ANANT PHASE II

Completed No litigation declared Residential / Group Housing project

ARIHANT ANANT PHASE II

By MAHALAXMI COTTON MILLS

RG-MH-74053 · RERA P52000049395 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 96%
14 of 194Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

ARIHANT ANANT PHASE II is a Residential / Group Housing project by MAHALAXMI COTTON MILLS in Raigarh, Maharashtra, registered with MahaRERA as P52000049395 on 8 Feb 2023. The registration is recorded completed; possession was promised by 30 Dec 2027. 180 of the 194 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameARIHANT ANANT PHASE II
  • TypeResidential / Group Housing
  • Location
    • Survey No 112 / (11) (14) /5
    • Taloja
    • Taloje Majkur
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000049395
  • ReraGenie IDRG-MH-74053

Builder

  • NameMAHALAXMI COTTON MILLS
  • Entity typePartnership
  • PartnerPARTH ASHOKKUMAR CHHAJER
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredFeb 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Feb 2023
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed76 files

Current status

93%180 of 194 units booked
90.3%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARIHANT ANANT PHASE II B WINGNA10089089
ARIHANT ANANT PHASE II C WINGNA11101050105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 96%.

ARIHANT ANANT PHASE II B WING88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises87%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.81%
ARIHANT ANANT PHASE II C WING88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises87%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.81%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes90%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56
BuildingClosed/CoveredTotal
ARIHANT ANANT PHASE II B WING2727
ARIHANT ANANT PHASE II C WING2929

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,967 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Mar 2026

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI20148.14
Proposed, not sanctioned10,295 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector 17 Vardhaman Market Premises Co-operative Society, Vashi , Navi-mumbai
Estimated costRs 41.61 cr
Cost incurredRs 37.59 cr
Work done90.33%
BuildingWingEstimatedIncurred
ARIHANT ANANT PHASE II B WINGNARs 19.51 crRs 17.76 cr
ARIHANT ANANT PHASE II C WINGNARs 19.51 crRs 17.76 cr
-NARs 2.59 crRs 2.07 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHANDARKAR
EngineerKALEEM SAYYAD
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantKailash Chand Jain & Co.
PartnerRole in project
MAHALAXMI COTTON MILLS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Anant OC Letter 220526.pdf2 Jun 2026
Occupational CertificateFile: Anant OC Approved Plans 220526 1 to 2 page.pdf2 Jun 2026
Occupational CertificateFile: Anant OC Approved Plans 220526 3 to 4 page.pdf2 Jun 2026
Occupational CertificateFile: Anant OC Approved Plans 220526 5 to 6 page.pdf2 Jun 2026
Occupational CertificateFile: Anant OC Approved Plans 220526 7 to 8 page.pdf2 Jun 2026
Occupational CertificateFile: Anant OC Verification Email Snip 290526.pdf2 Jun 2026
Withdrawal Update Form 1File: 24 Form 1_ANANT PH II_310326.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2_Anant Ph II_250326.pdf16 Apr 2026
Withdrawal Update Form 3File: 24 Form 3_ Anant Ph II_250326.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1_Anant Ph II_31122025.pdf10 Feb 2026
Withdrawal Update Form 2File: Form 2_Anant Ph II_31122025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form 3_Anant Ph II_31122025.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1_ANANT PHASE II_30092025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2_Anant Ph II_30092025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_Anant Ph II_30092025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: ArihantAnantP2_Form5_FY2425.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: Arihant Anant Phase II.pdf4 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Anant Ph-II_310325.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Anant Ph II_31032025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Anant Ph-II_310325.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE signed.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - ANANT PHASE II.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Anant Phase II.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anant Phase II.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Anant Phase 2.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Anant Ph II.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ANANT PHASE II_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anant-2_SIGNED.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ANANT II FY 23-24.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT ANANT PHASE II.PDF20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anant II.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure signed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Anant 2 SIGNED.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Anant II Dec 23 SIGNED.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Anant II Mar 24 SIGNED.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Anant Phase II 31122023.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032024 Anant 2.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE -ANANT PHASE II 30 MARCH 2024.PDF20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anant Phase _2.pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Arihant Anant Phase II.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARIHANT ANANT PHASE II 30 SEPTEMBER 2023.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Anant Ph II Sep 2023.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anant-2.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Arihant Anant II.pdf9 Oct 2023
Disclosure of sold/ booked inventoryFile: Adobe Scan Oct 1, 2023_compressed.pdf1 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT ANANT PHASE II - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Anant 2 June 2023.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ANANT PHASE II - 31 MARCH 2023.PDF21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: anant - II _31032023.PDF21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anant II_11zon.pdf20 Apr 2023
Proforma of Agreement for saleFile: Agreement.pdf4 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation1.pdf4 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA disclosure.pdf12 Jan 2023
Copy of the legal title reportFile: anant title report title flow.pdf7 Dec 2022
Other - LegalFile: Form B Anant Phase II.pdf7 Dec 2022
Details of encumbrances concerned to FinanceFile: 3 Declaration for Encumbrance.PDF6 Dec 2022
Details of encumbrances concerned to LegalFile: 3 Declaration for Encumbrance.PDF6 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation letter for Allotment Letter.PDF30 Nov 2022
Proforma of Allotment letterFile: 4 Allotment Letter Anant II- RERA.pdf24 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anant Ca certificate.PDF17 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Decl.PDF17 Nov 2022
Details of encumbrances concerned to LegalFile: Decl Encumbrances.pdf5 Nov 2022
CERSAI detailsFile: Cersai.pdf5 Nov 2022
Details of encumbrances concerned to FinanceFile: Decl Encumbrances.pdf21 Oct 2022
Declaration about Commencement CertificateFile: C C declaration.pdf21 Oct 2022
Declaration in FORM BFile: Form B.pdf21 Oct 2022
Layout approvalFile: 1.pdf18 Oct 2022
Building plan approvalFile: 2-7.pdf18 Oct 2022
PAN CardFile: Mahalaxmi Cotton Mills_PAN Card.pdf18 Oct 2022
Copy of Layout Approval (in case of layout)File: 1.pdf18 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: 2-7.pdf18 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf18 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - FORM 1.PDF18 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg anant Form 2.pdf18 Oct 2022

How this compares with Raigarh

93%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT ANANT PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Taloja5,900+ in Raigarh

Builder: MAHALAXMI COTTON MILLS

MAHALAXMI COTTON MILLS has 2 registrations on MahaRERA, including ARIHANT ANANT and ARIHANT ANANT PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT ANANT PHASE II is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT ANANT PHASE II?

The registered promoter entity is MAHALAXMI COTTON MILLS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT ANANT PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARIHANT ANANT PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT ANANT PHASE II?

The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Kailash Chand Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT ANANT PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT ANANT PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT ANANT PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.