Home / Browse projects / Raigarh, Maharashtra / ARIHANT AMISHA PHASE II

Completed No litigation declared Others project

ARIHANT AMISHA PHASE II

By ARIHANT AASHIYANA PRIVATE LIMITED

RG-MH-30205 · RERA P52000029991 · Last updated on MahaRERA portal: 17 Oct 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Internal walls, 99%
10 of 134Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

ARIHANT AMISHA PHASE II is a Others project by ARIHANT AASHIYANA PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000029991 on 20 Jul 2021. The registration is recorded completed; possession was promised by 30 Dec 2026. 124 of the 134 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameARIHANT AMISHA PHASE II
  • TypeOthers
  • Location
    • MAHODAR
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000029991
  • ReraGenie IDRG-MH-30205

Builder

  • NameARIHANT AASHIYANA PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2021PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jul 2021
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

93%124 of 134 units booked
99.6%Work done, per cost certificate

Figures as on 17 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C1NA8711222134

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

C1: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed16

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots16
Closed/Covered16

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,776 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Sep 2025

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI4582.67
Proposed, not sanctioned4,583 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector 17 Vardhman Market Premises Co-Operative Society, Vashi, Navi Mumbai, Maharashtra 400703
Estimated costRs 17.74 cr
Cost incurredRs 17.67 cr
Work done99.61%
BuildingWingEstimatedIncurred
C1NARs 16.06 crRs 15.99 cr
-NARs 1.68 crRs 1.68 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA SHIVCHARAN BHANDARKAR
EngineerKALEEM SAYYAD
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantUmmed Jain & Co.
PartnerRole in project
ARIHANT AASHIYANA PRIVATE LIMITED-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601916QUTBUDDIN NIZAMUDDIN KHANARIHANT AASHIYANA PRIVATE LIMITED01/04/2026
SM12600281Bhakti AchrekarARIHANT AASHIYANA PRIVATE LIMITED27/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Amisha Phase II.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Arihant Amisha Phase II.pdf4 Oct 2025
Occupational CertificateFile: Amisha Ph II_OC Verification Snip.pdf20 Sep 2025
Occupational CertificateFile: Amisha Ph II_OC with Plans.pdf20 Sep 2025
Occupational CertificateFile: Amisha Ph II_OC 04082025.pdf13 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Amisha Ph II_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Amisha Ph-II_310325.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Amisha Ph II_310325_SIGNED.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - AMISHA PHASE II.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Amisha Phase II.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - AMISHA PH II.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLSOURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Amisha Phase II_signed.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Amisha Ph II.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ARIHANT AMISHA PHASE II_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha Phase 2 SIGNED.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AMISHA II FY 23-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amisha II.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arihant Amisha Phase II.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Amisha Phase 2 SIGNED.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_Amisha Phase 2_FY 22-23.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Amisha II - Dec 23 SIGNED.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Amisha II - Mar 24 SIGNED.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amisha Phase 2 31122023.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amisha Phase II 31032024.PDF6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amisha Phase II 31032024.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 AMISHA PH2 DEC2023.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amisha Phase 2 SIGN.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31032024 Amisha Phase 2 SIGN.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ARIHANT AMISHA PHSE II -30 SEPTEMBER 2023.PDF19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA Amisha Ph II Sept 2023.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Arihant Amisha Phase 2-Aashiyana.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha Phase -2.pdf19 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Arihant Amisha Phase II.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT AMISHA PHASE II - FORM I - ARCHITECT CERTIFICATE 30TH JUNE 2023 .PDF19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA Amisha II June 2023.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II f 3_compressed.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA AMISHA PH2 MARCH2023.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AMISHA PHASE II 31 MARCH 23 .PDF18 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II 211221.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II 300622.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II 300922.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II 310322.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II 311221.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amisha II 311222.pdf22 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AMISHA PHASE II FORM 1 21 DECEMBER 2021.PDF21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AMISHA PHASE II FORM 1 30 JUNE 2022.PDF21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AMISHA PHASE II FORM 1 30 SEPTEMBER 2022.PDF21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AMISHA PHASE II FORM 1 31 DECEMBER 2021.PDF21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AMISHA PHASE II FORM 1 31 DECEMBER 2022.PDF21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AMISHA PHASE II FORM 1 31 MARCH 2022.PDF21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA AMISHA2 300622.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA AMISHA2 300922.PDF21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM2 RERA AMISHA2 211221.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM2 RERA AMISHA2 310322.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM2 RERA AMISHA2 311221.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Arihant_Amisha_Phase2_Form 5_2021-22 d.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_ARIHANT AMISHA PHASE II_RERA.pdf6 Jul 2021
Proforma of Allotment letterFile: Agreement for Sale_Arihant Amisha Phase II_060721_final.pdf6 Jul 2021
Details of encumbrancesFile: Declaration for Encumbrances_Amisha II.pdf2 Jul 2021
Declaration about Commencement CertificateFile: Declaration for Commencemement Certificate.pdf2 Jul 2021
Declaration in FORM BFile: Affidavit for Amisha Phase II_RERA.pdf2 Jul 2021
Proforma of Allotment letterFile: Performa of the allotement letter_Arihant Amisha Phase II.pdf2 Jul 2021
Layout approvalFile: LAYOUT 01_RERA.pdf30 Jun 2021
Layout approvalFile: LAYOUT 02_RERA.pdf30 Jun 2021
Building plan approvalFile: BUILDING PLANS-1.pdf30 Jun 2021
Building plan approvalFile: BUILDING PLANS-2.pdf30 Jun 2021
Building plan approvalFile: BUILDING PLANS-3.pdf30 Jun 2021
PAN CardFile: PAN_Arihant Aashiyana.PDF30 Jun 2021
Copy of the legal title reportFile: Title Certificate_Amisha Phase II_RERA.pdf30 Jun 2021
Copy of Layout Approval (in case of layout)File: LAYOUT 01_RERA.pdf30 Jun 2021
Copy of Layout Approval (in case of layout)File: LAYOUT 02_RERA.pdf30 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLANS-1.pdf30 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLANS-2.pdf30 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLANS-3.pdf30 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 Jun 2021

How this compares with Raigarh

93%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT AMISHA PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHODAR5,900+ in Raigarh

Builder: ARIHANT AASHIYANA PRIVATE LIMITED

ARIHANT AASHIYANA PRIVATE LIMITED has 12 registrations on MahaRERA, including ARIHANT ANSHULA and ARIHANT AMISHA PHASE I. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT AMISHA PHASE II is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT AMISHA PHASE II?

The registered promoter entity is ARIHANT AASHIYANA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT AMISHA PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT AMISHA PHASE II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT AMISHA PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT AMISHA PHASE II?

The professionals named in the filing: Architect: YOGITA SHIVCHARAN BHANDARKAR; Engineer: KALEEM SAYYAD; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT AMISHA PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT AMISHA PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT AMISHA PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.