ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / ARIHANT AAKARSHAN PHASE I

Registered No litigation declared Others project

ARIHANT AAKARSHAN PHASE I

RG-MH-59741 · RERA P52000034793 · Last updated on MahaRERA portal: 15 Mar 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
0 of 66Construction stages doneacross 6 buildings; furthest along: Excavation, 0%
1Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

ARIHANT AAKARSHAN PHASE I is a Others project by Promoter name not stated in filing in Raigarh, Maharashtra, registered with MahaRERA as P52000034793 on 28 Apr 2022. Possession is promised by 31 Mar 2030. 1 complaint is on record with the regulator.

At a glance

Project

  • NameARIHANT AAKARSHAN PHASE I
  • TypeOthers
  • Location
    • GHOT
    • PANVEL
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000034793
  • ReraGenie IDRG-MH-59741

Builder

  • NamePromoter name not stated in filing
  • DirectorsASHOKKUMAR BHANWARLAL CHHAJER, PARTH ASHOKKUMAR CHHAJER

Key dates

this monthRegisteredApr 2022PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings6 building records
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HUBERTONA140000
ISABELLENA140000
JONASNA140000
ADORANA140000
BENECIANA140000
FIDELNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 15 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Excavation, at 0%.

HUBERTO0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ISABELLE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JONAS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ADORA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BENECIA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
FIDEL0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,634 sq m
Land owned byThe promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd Office No 4 Awing Arihant Aura Building TTC Industrial Area Thane Belapur Road

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHNDARKAR
EngineerSAURABH PUROHIT
Chartered AccountantK C JAIN KALA & CO
PartnerRole in project
ARIHANT SUPERSTRUCTURES LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000428971Archana SuklaM/s. Arihant Superstructures Ltd.05/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: Akarshan I_11zon (2).pdf15 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_Asset_Id_Based_200522.pdf23 May 2022
Details of encumbrancesFile: Details of encumbrances Arihant Aakarshan Phase.pdf19 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Aakarshan Phase I_RERA_Revised.pdf27 Apr 2022
Declaration in FORM BFile: Form B_Aakarshan Phase I_RERA.pdf26 Apr 2022
Copy of the legal title reportFile: Title Certificate Arihant Aakarshan Phase I_RERA.pdf23 Apr 2022
Details of encumbrancesFile: Declaration for encumberances against land_RERA.pdf23 Apr 2022
Declaration about Commencement CertificateFile: Declaratio for Commencement Certificate_RERA.pdf23 Apr 2022
CERSAI detailsFile: Declaration for CERSAI_RERA.pdf23 Apr 2022
Building plan approvalFile: 8.pdf22 Apr 2022
Building plan approvalFile: 9.pdf22 Apr 2022
Layout approvalFile: Layout Plan_Arihant Aakarshan Phase I.pdf22 Apr 2022
Building plan approvalFile: 2.pdf22 Apr 2022
Building plan approvalFile: 3.pdf22 Apr 2022
Building plan approvalFile: 4.pdf22 Apr 2022
Building plan approvalFile: 5.pdf22 Apr 2022
Building plan approvalFile: 6.pdf22 Apr 2022
Building plan approvalFile: 7.pdf22 Apr 2022
Building plan approvalFile: 10.pdf22 Apr 2022
Building plan approvalFile: 10.pdf22 Apr 2022
Building plan approvalFile: 11.pdf22 Apr 2022
PAN CardFile: ASL PAN Card.pdf22 Apr 2022
Copy of Layout Approval (in case of layout)File: Layout Plan_Arihant Aakarshan Phase I.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf22 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf22 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_Aakarshan Phase I.pdf22 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Aakarshan Phase I_RERA.pdf22 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Aakarshan Phase I_RERA.pdf22 Apr 2022
Proforma of Allotment letterFile: Arihant Akarshan Draft Sale Agreement Phase 1.pdf22 Apr 2022
Proforma of Allotment letterFile: Performa of the allotement letter_Arihant Aalishan Phase I.pdf22 Apr 2022

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT AAKARSHAN PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

Builder: Promoter name not stated in filing

The filing does not name a promoter organisation for this registration. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT AAKARSHAN PHASE I is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT AAKARSHAN PHASE I?

The registered promoter entity is Promoter name not stated in filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT AAKARSHAN PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ARIHANT AAKARSHAN PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ARIHANT AAKARSHAN PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT AAKARSHAN PHASE I?

The professionals named in the filing: Architect: YOGITA BHNDARKAR; Engineer: SAURABH PUROHIT; Chartered Accountant: K C JAIN KALA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT AAKARSHAN PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT AAKARSHAN PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT AAKARSHAN PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one