Home / Browse projects / Raigarh, Maharashtra / ARIHANT 6 ANAIKA

Registered No litigation declared Residential / Group Housing project

ARIHANT 6 ANAIKA

By ARIHANT ENTERPRISES

RG-MH-30714 · RERA P52000031132 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 17 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
16 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 98%
19 of 267Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

ARIHANT 6 ANAIKA is a Residential / Group Housing project by ARIHANT ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000031132 on 5 Oct 2021. Possession is promised by 31 Dec 2027. 248 of the 267 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.

At a glance

Project

  • NameARIHANT 6 ANAIKA
  • TypeResidential / Group Housing
  • Location
    • Raigarh
    • Panvel
    • Koyana Velhe
    • 410208
  • Pincode410208
  • RERA no.P52000031132
  • ReraGenie IDRG-MH-30714

Builder

  • NameARIHANT ENTERPRISES
  • Entity typePartnership
  • PartnerPARTH CHHAJER
  • Other registrations17 more →
  • Completed4 of 18
  • No longer live5 lapsed, de-registered or revoked

Key dates

this monthRegisteredOct 2021PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2021
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed119 files

Current status

93%248 of 267 units booked
89.1%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VNA15131400140
UNA15131270127

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 98%.

V90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
U90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises93%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes100%

Parking filed310

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots310
Closed/Covered310
BuildingClosed/CoveredTotal
V156156
U154154

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,210 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Apr 2026

Approvals and building plan

Sanctioning authorityPANVEL MUNICIPAL CORPORATION
Permissible FSI15897.6
Proposed, not sanctioned15,897 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd Office No 4A wing Arihant Aura Building TTC Industrial Area Thane Belapur Road Opposi
Estimated costRs 69.31 cr
Cost incurredRs 61.74 cr
Work done89.08%
BuildingWingEstimatedIncurred
VNARs 32.63 crRs 30.24 cr
UNARs 32.63 crRs 30.24 cr
-NARs 4.05 crRs 1.25 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGITA BHANDARKAR
EngineerKALEEM SAYYAD
Chartered AccountantANJANI KUMAR GOYAL
Chartered AccountantKailash Chand Jain & Co
PartnerRole in project
ARIHANT ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Nov 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 17 Form 1_6 ANAIKA_310326.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2_6 Anaika_250326.pdf16 Apr 2026
Withdrawal Update Form 3File: 17 Form 3_6 Anaika_250326.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1_6 Anaika_Jun2025.pdf27 Jan 2026
Withdrawal Update Form 2File: Form 2_6 Anaika_Jun2025.pdf27 Jan 2026
Withdrawal Update Form 3File: Form 3_6 Anaika_Jun2025.pdf27 Jan 2026
Withdrawal Update Form 1File: Form 1_6 Anaika_31122025.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2_6 Anaika_31122025.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3_6 Anaika_31122025.pdf21 Jan 2026
Layout approvalFile: 1 - 31-12-2021.pdf6 Nov 2025
Layout approvalFile: 2 - 7.pdf6 Nov 2025
Layout approvalFile: 3 - 7.pdf6 Nov 2025
Building plan approvalFile: 4 - 7.pdf6 Nov 2025
Building plan approvalFile: 5 - 7.pdf6 Nov 2025
Building plan approvalFile: 6 - 7.pdf6 Nov 2025
Building plan approvalFile: 7 - 7.pdf6 Nov 2025
Building plan approvalFile: 1 - 31-12-2021 - Parking Highlighted.pdf6 Nov 2025
Withdrawal Update Form 1File: Form 1_6 ANAIKA_30092025.pdf27 Oct 2025
Withdrawal Update Form 1File: Form 1_6 ANAIKA_30092025.pdf27 Oct 2025
Withdrawal Update Form 1File: Form 1_6 ANAIKA_30092025.pdf27 Oct 2025
Withdrawal Update Form 1File: Form 1_6 ANAIKA_30092025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2_6 Anaika_30092025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2_6 Anaika_30092025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2_6 Anaika_30092025.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2_6 Anaika_30092025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3_6 ANAIKA_30092025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3_6 ANAIKA_30092025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3_6 ANAIKA_30092025.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3_6 Anaika_30092025.pdf27 Oct 2025
Withdrawal Update Form 1File: Form 1_6 ANAIKA_30092025.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2_6 Anaika_30092025.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3_6 ANAIKA_30092025.pdf24 Oct 2025
Withdrawal Update Form 1File: Form 1_6 ANAIKA_30092025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2_6 Anaika_30092025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3_6 ANAIKA_30092025.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Arihant6Anaika_Form5_FY2425.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: Arihant 6 Anaika.pdf4 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-6 Anaika_310325.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 6 Anaika_310325.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 6 Anaika_310325_SIGNED.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 6 ANAIKA.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 6 Ananika.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 6 Anaika.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 6 Anaika.pdf7 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 6 Anaika.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ARIHANT 6 ANAIKA_SIGNED.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6Anaika_SIGNED.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 6 Anaika 30062024.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 6 ANAIKA FY 22-23.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 6 ANAIKA FY 23-24.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT 6 ANAIKA.PDF20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure signed.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 Anaika6 V Signed.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_6 Anaika_FY 22-23.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 6 Anaika 31122023 SIGNED.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 6 Anaika 31032024 SIGNED.pdf3 Jun 2024
Disclosure of sold/ booked inventoryFile: 6 Anaika_Disclosure of Sold Booked Inventory_31122023.pdf30 May 2024
Disclosure of sold/ booked inventoryFile: 6 Anaika_Disclosure of Sold Booked Inventory_31032024.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ARCHITECT CERTIFICATE - 6 ANAIKA.PDF20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anaika 6.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA 6ANAIKA JUNE2023.PDF20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT 6 ANAIKA - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023.PDF19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 ANAIKA -FORM 1 - 31 MARCH 23.PDF21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Anaika_31032023.PDF21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6Anaika_11zon.pdf20 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 6 Anaika_Form 5_2021-22[46401].pdf6 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ANAIKA FORM 1 21 DEC 2021.PDF2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ANAIKA FORM 1 30 JUNE 2022.PDF2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ANAIKA FORM 1 30 SEPTEMBER 2022.PDF2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ANAIKA FORM 1 31 DEC 2021.PDF2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ANAIKA FORM 1 31 DEC 2022.PDF2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 ANAIKA FORM 1 31 MARCH 2022.PDF2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 ANAIKA FORM 1 31 DEC 2021.PDF2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA 6ANAIKA 211221.PDF2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA 6ANAIKA 300622.PDF2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA 6ANAIKA 300922.PDF2 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA 6ANAIKA 310322.PDF2 Mar 2023

How this compares with Raigarh

93%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARIHANT 6 ANAIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

Builder: ARIHANT ENTERPRISES

Arihant Enterprises has 18 registrations on MahaRERA, including SAI MANGAL RESIDENCY and JAGDAMBA CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if ARIHANT 6 ANAIKA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARIHANT 6 ANAIKA?

The registered promoter entity is ARIHANT ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARIHANT 6 ANAIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARIHANT 6 ANAIKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARIHANT 6 ANAIKA?

The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Kailash Chand Jain & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARIHANT 6 ANAIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARIHANT 6 ANAIKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARIHANT 6 ANAIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.