Home / Browse projects / Raigarh, Maharashtra / ARIHANT 5 ANAIKA
ARIHANT 5 ANAIKA
By ARIHANT VATIKA REALTY PRIVATE LIMITED
RG-MH-29987 · RERA P52000029482 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARIHANT 5 ANAIKA is a Residential / Group Housing project by ARIHANT VATIKA REALTY PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000029482 on 4 Jun 2021. The registration is recorded completed; possession was promised by 31 Dec 2026. 354 of the 433 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete.
At a glance
Project
- NameARIHANT 5 ANAIKA
- TypeResidential / Group Housing
- Location
- Raigarh
- Panvel
- Koyana Velhe
- 410208
- Pincode410208
- RERA no.P52000029482
- ReraGenie IDRG-MH-29987
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Jun 2021
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings3 building records
- Documents filed117 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| R | NA | 17 | 17 | 171 | 0 | 171 |
| S | NA | 17 | 17 | 122 | 0 | 122 |
| T | NA | 17 | 17 | 140 | 0 | 140 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 99%.
R90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 93% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
S90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 93% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
T90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 99% |
| Sanitary Fittings within the flats / premises | 93% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 30% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed169
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| R | 60 | 60 |
| S | 55 | 55 |
| T | 54 | 54 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| R | NA | Rs 24.79 cr | Rs 24.55 cr |
| S | NA | Rs 24.79 cr | Rs 24.55 cr |
| T | NA | Rs 24.79 cr | Rs 24.55 cr |
| - | NA | Rs 5.21 cr | Rs 3.53 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YOGITA BHANDARKAR |
| Engineer | KALEEM SAYYAD |
| Chartered Accountant | ANJANI KUMAR GOYAL |
| Chartered Accountant | Ummed Jain & Co. |
| Partner | Role in project |
|---|---|
| ARIHANT VATIKA REALTY PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 May 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Dec 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC Order Anaika 5_15042026.pdf | 6 May 2026 |
| Occupational CertificateFile: OC Approved Drawing_Anaika 5_Page 1 to 5.pdf | 6 May 2026 |
| Occupational CertificateFile: OC Approved Drawing_Anaika 5_Page 6 to 10.pdf | 6 May 2026 |
| Occupational CertificateFile: OC Approved Drawing_Anaika 5_Page 11 to 14.pdf | 6 May 2026 |
| Occupational CertificateFile: 5 Anaika_OC Verification email through town planning to RERA.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: 14 Form 1_5 ANAIKA_310326.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_5 Anaika_250326.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: 14 Form 3_5 Anaika_250326.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: Form 1_5 Anaika_31122025.pdf | 21 Jan 2026 |
| Withdrawal Update Form 2File: Form 2_5 Anaika_31122025.pdf | 21 Jan 2026 |
| Withdrawal Update Form 3File: Form 3_Anaika 5_31122025.pdf | 21 Jan 2026 |
| Withdrawal Update Form 1File: Form 1_ARIHANT 5 ANAIKA_30092025.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_5 Anaika_30092025.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: Form 3_5Anaika_30092025.pdf | 27 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_5 Anaika.pdf | 17 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A - 5 Anaika_signed.pdf | 4 Oct 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-5 Anaika_310325.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 5 Anaika_310325.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 5 Anaika_310325.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE SIGNED.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 5 Anaika.pdf | 19 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 5 Anaika.pdf | 19 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 5 Anaika.pdf | 19 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLSOURE SIGNED.pdf | 19 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Anaika 5_signed.pdf | 11 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 5 Anaika.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE_SIGNED.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I - ARIHANT 5 ANAIKA_SIGNED.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5Ananika_SIGNED.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 5 ANAIKA FY 23-24.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 5 Anaika.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arihant 5 Anaika.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure SIGNED.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30062024 5Anaika SIGNED.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 5 Anaika - Dec 23 SIGNED.pdf | 28 May 2024 |
| Disclosure of sold/ booked inventoryFile: 5 Anaika - Mar 24 SIGNED.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 5 Anaika 31032024.PDF | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 5 Anaika 31032024.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I ARIHANT 5 ANAIKA 31ST DECEMBER 2023.PDF | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 5ANAIKA DEC2023.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 CA Certificate on Project Cost Fund withdrawal.pdf | 23 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anaika 5.pdf | 13 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT 5 ANAIKA - 30 SEPTEMBER 2023.PDF | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RERA 5Anaika Sept 2023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Arihant Anaika 5-Vatika.pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anaika 5.pdf | 19 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-5 Anaika.pdf | 9 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Anaikaaa.pdf | 21 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARIHANT 5 ANAIKA - FORM 1 - ARCHITECT CERTIFICATE 30TH JUNE 2023 .PDF | 19 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 RERA 5 Anaika June 2023.pdf | 19 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARIHANT 5 ANAIKA PHASE III - 31 MARCH 2023.PDF | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Anaika_31032023.PDF | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anaika 5_11zon.pdf | 20 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 5 ANAIKA 21 122021.PDF | 22 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 5 ANAIKA 30 06 2022.PDF | 22 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 5 ANAIKA 30 09 2022.PDF | 22 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 5 ANAIKA 31 03 2022.PDF | 22 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 5 ANAIKA 31 12 2021.PDF | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1 5 ANAIKA 31 12 2022.PDF | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1 5 ANAIKA 31 12 2022.PDF | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 ANAIKA5 21122021.pdf | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 ANAIKA5 30062022.pdf | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 ANAIKA5 30092022.pdf | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 ANAIKA5 31032022.pdf | 22 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 ANAIKA5 31122022.pdf | 22 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: anaika v 211221.pdf | 22 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: anaika 5 311221.pdf | 22 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: anaika 5 310322.pdf | 22 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANAIKA 5 1.pdf | 22 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANAIKA 5 2.pdf | 22 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANAIKA 5 4.pdf | 22 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Arihant_5Anaika_Form 5_2021-22 dsc.pdf | 18 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2022.pdf | 17 Dec 2022 |
| Layout approvalFile: 1.pdf | 27 Dec 2021 |
| Building plan approvalFile: 6.pdf | 27 Dec 2021 |
| Building plan approvalFile: 8.pdf | 27 Dec 2021 |
| Building plan approvalFile: 12.pdf | 27 Dec 2021 |
| Building plan approvalFile: 13.pdf | 27 Dec 2021 |
| Building plan approvalFile: 14.pdf | 27 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 27 Dec 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ARIHANT ANMOL PHASE I | JOUVELI BADLAPUR EAST | 434 | Completed | Oct 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
Keep ARIHANT 5 ANAIKA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -1 Sector -31 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
SAI SUNCITY PHASE II
Chariot Properties LLP
Plot No. 14 Sector-37 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
ARIHANT ADARSH PHASE I
ARIHANT SUPERSTRUCTURES LIMITED
See every Raigarh project, with the district possession charts
Builder: ARIHANT VATIKA REALTY PRIVATE LIMITED
ARIHANT VATIKA REALTY PRIVATE LIMITED has 9 registrations on MahaRERA, including ARIHANT ANAIKA PHASE I and ARIHANT ANMOL PHASE II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if ARIHANT 5 ANAIKA is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARIHANT 5 ANAIKA?
The registered promoter entity is ARIHANT VATIKA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARIHANT 5 ANAIKA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARIHANT 5 ANAIKA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARIHANT 5 ANAIKA?
The professionals named in the filing: Architect: YOGITA BHANDARKAR; Engineer: KALEEM SAYYAD; Chartered Accountant: ANJANI KUMAR GOYAL; Chartered Accountant: Ummed Jain & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARIHANT 5 ANAIKA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback