ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / ARAIA

Registered No litigation declared Residential / Group Housing project

ARAIA

By KAVITA DIMENSION LLP

RG-MH-60691 · RERA P51900050460 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of AU SMALL FINANCE BANK LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 70%
68 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

ARAIA is a Residential / Group Housing project by KAVITA DIMENSION LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900050460 on 17 Apr 2023. Possession is promised by 31 Dec 2027. 3 of the 71 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameARAIA
  • TypeResidential / Group Housing
  • Location
    • 66-78 NAUSHIR BHARUCHA MARG
    • GRANT ROAD WEST
    • TARDEO
    • Mumbai City
    • 400007
  • Pincode400007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900050460
  • ReraGenie IDRG-MH-60691

Builder

  • NameKAVITA DIMENSION LLP
  • Entity typePartnership
  • PartnersJAYANTILAL LUNKAD, Rachit Lunkad

Key dates

this monthRegisteredApr 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

4%3 of 71 units booked
42.2%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ARAIANA2120531871

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.

ARAIA: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area483 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK LIMITED
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on6 Feb 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4200.53
Proposed, not sanctioned3,501 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.4,RUNWALANTHURIUM RETAIL,OLD GABRIEL FACTORY,LBS MARG,IN FRONT OF VEENA NAGAR,MULUND ( W),400080
Estimated costRs 24.00 cr
Cost incurredRs 10.14 cr
Work done42.25%
BuildingWingEstimatedIncurred
ARAIANARs 24.00 crRs 10.14 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNilesh Kadakia
EngineerAparna D. Dabak
Chartered AccountantAnand Jain & Associates
Chartered AccountantDilip Kumar B Agrawal
Chartered AccountantTodi Tulsyan & Co.
Chartered AccountantManish B Ranpariya
PartnerRole in project
KAVITA DIMENSION LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 March 2026.pdf29 Apr 2026
Withdrawal Update Form 2File: form 2 March 2026.pdf29 Apr 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec 2025.pdf25 Apr 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf25 Apr 2026
Withdrawal Update Form 3File: form 3 Dec 2025.pdf25 Apr 2026
Form 1File: Form 1 March 2024.pdf21 Nov 2025
Form 2File: Form 2 March 2024.pdf21 Nov 2025
Form 3File: Form 3 March 2024.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: 31 march 2024.pdf21 Nov 2025
OthersFile: Form 2A MArch 2024.pdf21 Nov 2025
Form 1File: Form 1 March 2025.pdf21 Nov 2025
Form 2File: Form 2 March 2025.pdf21 Nov 2025
Form 3File: Form 3 March 2025 (1).pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: 31 march 2025.pdf21 Nov 2025
OthersFile: Form 2A March 2025.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 June 2025.pdf21 Nov 2025
Withdrawal Update Form 1File: Form 1 Sept 2025.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf21 Nov 2025
Withdrawal Update Form 2File: Form 2 Sept 2025.pdf21 Nov 2025
Withdrawal Update Form 3File: Form3 June 2025.pdf21 Nov 2025
Withdrawal Update Form 3File: form 3 Sept 2025.pdf21 Nov 2025
Form 1File: Form 1 Sept 2023.pdf20 Nov 2025
Form 2File: Form 2 Sept 2023.pdf20 Nov 2025
Form 3File: Form 3 Sept 2023.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 30 September 2023.pdf20 Nov 2025
Form 1File: Form 1 Dec 2023.pdf20 Nov 2025
Form 2File: Form 2 Dec 2023.pdf20 Nov 2025
Form 3File: Form 3 Dec 2023.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 31 december 2023.pdf20 Nov 2025
Form 1File: Form 1 Sept 2024.pdf20 Nov 2025
Form 2File: Form 2 Sept 2024.pdf20 Nov 2025
Form 3File: Form 3 sept 2024.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 30 September 2024.pdf20 Nov 2025
Form 1File: Form 1 June 2024.pdf20 Nov 2025
Form 2File: Form 2 June 2024.pdf20 Nov 2025
Form 3File: Form 3 jun 2024.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 30 jun 2024.pdf20 Nov 2025
Form 1File: Form 1 June 2023.pdf20 Nov 2025
Form 2File: Form 2 June 2023.pdf20 Nov 2025
Form 3File: Form 3_June 2023.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 30 jun 2023.pdf20 Nov 2025
Form 1File: Form 1 Dec 2024.pdf20 Nov 2025
Form 2File: Form 2 Dec 2024.pdf20 Nov 2025
Form 3File: Form 3 dec 2024.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: 31 december 2024.pdf20 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate RERA.pdf17 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate RERA.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rera CA Certificate for withdrawl.pdf13 Jan 2024
Details of encumbrances concerned to FinanceFile: RERA ENCUMBRANCE LETTER.pdf13 Jun 2023
Details of encumbrances concerned to LegalFile: RERA ENCUMBRANCE LETTER.pdf13 Jun 2023
Other - TechnicalFile: IOD Plan_1-1.pdf12 Apr 2023
Other - TechnicalFile: IOD Plan_2-2.pdf12 Apr 2023
Other - TechnicalFile: IOD Plan_3-3.pdf12 Apr 2023
Other - TechnicalFile: IOD Plan_4-4.pdf12 Apr 2023
Other - TechnicalFile: IOD Plan_5-5.pdf12 Apr 2023
CERSAI detailsFile: Cersai Asset Based Search.pdf4 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf4 Mar 2023
Proforma of Agreement for saleFile: Agreement For Sale 04_03_2023.pdf4 Mar 2023
Proforma of Allotment letterFile: Allotment Letter 04_03_2023.pdf4 Mar 2023
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT OF LETTER OF ALLOTMENT(3).pdf4 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report of Agreement For Sale Compressed.pdf4 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Clarification for Bank Account.pdf2 Mar 2023
Declaration in FORM BFile: Form B.pdf23 Feb 2023
CERSAI detailsFile: Undertaking of No CERSAI Report.pdf23 Feb 2023
Layout approvalFile: Declaration for No Layout.pdf22 Feb 2023
Building plan approvalFile: 2329073_IOD_signed (1).pdf22 Feb 2023
Details of encumbrances concerned to FinanceFile: Declaration on No Encumbrance.pdf22 Feb 2023
Details of encumbrances concerned to LegalFile: Declaration on No Encumbrance.pdf22 Feb 2023
Copy of Layout Approval (in case of layout)File: Declaration for No Layout.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 2329073_IOD_signed (1).pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Rachit Lunkad disclosure of interest.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Jayantilal Lunkad disclosure of interest.pdf22 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format 'A ' Bank Account Disclosure.pdf22 Feb 2023
PAN CardFile: Pan Card.pdf15 Feb 2023
Copy of the legal title reportFile: Legal title report.pdf15 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 2358519_FirstCC_signed.pdf15 Feb 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf15 Feb 2023

How this compares with Mumbai City

4%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARAIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TARDEO780+ in Mumbai City

2 kmARAIACompleted 16Lapsed / revoked 21Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 102 registered projects within 2 km.

Builder: KAVITA DIMENSION LLP

KAVITA DIMENSION LLP has 1 registration on MahaRERA, including ARAIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if ARAIA is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARAIA?

The registered promoter entity is KAVITA DIMENSION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARAIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARAIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARAIA?

The professionals named in the filing: Architect: Nilesh Kadakia; Engineer: Aparna D. Dabak; Chartered Accountant: Anand Jain & Associates; Chartered Accountant: Dilip Kumar B Agrawal; Chartered Accountant: Todi Tulsyan & Co.; Chartered Accountant: Manish B Ranpariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARAIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARAIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARAIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.