ARADHANA ENCLAVE
By A C JAIN BUILDERS AND DEVELOPERS LLP
RG-MH-14083 · RERA P51600031439 · Last updated on MahaRERA portal: 24 Mar 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ARADHANA ENCLAVE is a Residential / Group Housing project by A C JAIN BUILDERS AND DEVELOPERS LLP in Nashik, Maharashtra, registered with MahaRERA as P51600031439 on 23 Oct 2021. The registration is recorded completed; possession was promised by 31 Dec 2025. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameARADHANA ENCLAVE
- TypeResidential / Group Housing
- Location
- GOPAL NAGAR
- ARTILLERY CENTER ROAD NASIKROAD
- Nashik
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600031439
- ReraGenie IDRG-MH-14083
Builder
- NameA C JAIN BUILDERS AND DEVELOPERS LLP
- Entity typePartnership
- GSTIN27ABOFA9179M1ZH
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnerVIDHYA ABHAY JAIN TODARWAL
- Other registrations7 more →
- Completed3 of 8
- Past their filed date1
- Declared earlier projects11 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Oct 2021
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2022)
- Buildings1 building record
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ARADHANA ENCLAVE | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
ARADHANA ENCLAVE: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ALOK NILKANTH CHANDRATRE | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR DINESH UGHADE |
| Architect | AR MOHIT KANAVAT |
| Engineer | SANJAY SHRIRAM PATIL |
| Chartered Accountant | CA Paresh P. Sabadra |
| Partner | Role in project |
|---|---|
| A C JAIN BUILDERS AND DEVELOPERS LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe Have Completed Said Project But Due To Low Sale and Gst Liability To Be Paid On Completion, We Need Said Extention.
Reason as filed by the promoterProject Completion Date Revision for Sub Registrar Agreement Execution Purpose.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 1 Mar 2025
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rera Audit Report 23-24.pdf | 24 Mar 2025 |
| Other - TechnicalFile: Architect Certificate - Form 4-Aradhana Enclave.pdf | 4 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC and Form 4.pdf | 1 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aradhana Enclave jun24.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aradhana Enclave1.pdf | 22 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aradhana Enclave.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate_June 24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect Certificate_Sept 24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate_Dec 24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_CA_Cert_Enclave_June_24[1].pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_CA_Cert_Enclave_Sept_24[1].pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA DEC 24.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate_Enclave_June 24.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate_Enclave_Sept 24.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Enclave_Dec 24.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate_Enclave_March 24.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Cert_Enclave_March 2024 signed.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate_Enclave_March 24.pdf | 5 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Aradhana Enclave.pdf | 20 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aradhana Enclave.pdf | 20 Jun 2024 |
| Declaration in FORM BFile: Form B - Aradhana Enclave.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Mar 23 - Aradhana Enclave.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aradhana Enclave.pdf | 19 Apr 2024 |
| CERSAI detailsFile: Declaration-Nil-CERSAI Report - Aradhana Enclave.pdf | 19 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations - Aradhana Enclave.pdf | 19 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200302903290_For_Asset_Based_Search_03_04_2024_10_13_11_208.pdf | 3 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organization.pdf | 3 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate June 2023_signed.pdf | 29 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate Sept 2023_Signed.pdf | 29 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Certificate Dec 2023_Signed.pdf | 29 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect Certificate_June 23.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect Certificate_Sept 23.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate_Dec 23.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate_Aradhana Enclave_June 23.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate_Aradhana Enclave_Sept 23.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer Certificate_Aradhana Enclave_Dec 23.pdf | 27 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Aradhana Enclave.pdf | 27 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aradhana Enclave - Sep 23.pdf | 26 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Aradhana Enclave - Dec 23.pdf | 26 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_New format from June 22.pdf | 29 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_New format from Sep 22.pdf | 29 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_New format from Dec 22.pdf | 29 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_New format from Mar 23.pdf | 29 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate_ Enclave_June 22.pdf | 29 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Enclave CA certificate Jun'22.pdf | 29 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Enclave CA certificate Sept'22.pdf | 29 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Enclave CA certificate Dec'22.pdf | 29 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Enclave CA certificate Mar'23.pdf | 29 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Enclave_from Dec 21.pdf | 29 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Enclave_MAR 22.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT-ENCLAVE-DEC-21.pdf | 29 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT- ENCLAVE-MAR-22.pdf | 29 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer Certificate_Aradhana Enclave_dec21.pdf | 23 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer Certificate_Aradhana Enclave_March22.pdf | 23 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA_ Audit Report_ Enclave_signed_ 21 22.pdf | 23 May 2023 |
| Other - TechnicalFile: Quality Assurance Certificate Form 2A- Aradhana Enclave.pdf | 6 May 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold INVENTORY - MAR23 .pdf | 14 Apr 2023 |
| Declaration about Commencement CertificateFile: FORM D - DECLARATION OF COMMENCEMENT CERTIFICATE.pdf | 2 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 07009 2021 .pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1012 2021.pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 0103 2022.pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 0406 2022.pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 0709 2022.pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1012 2022.pdf | 2 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold INVENTORY .pdf | 2 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - 2021-22.pdf | 2 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Master 8891.pdf | 2 Feb 2023 |
| Details of encumbrancesFile: ENCLAVE_ENC.pdf | 26 Nov 2022 |
| Details of encumbrancesFile: ENC_MORTGAGE.pdf | 26 Nov 2022 |
| Copy of the legal title reportFile: Title nEw Rera.pdf | 14 Oct 2021 |
| Proforma of Allotment letterFile: Agmt to Sale_Format.pdf | 14 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Binder1.pdf | 8 Oct 2021 |
| Declaration in FORM BFile: Form B ACJLLP.pdf | 24 Sep 2021 |
| Building plan approvalFile: Full page photo.pdf | 23 Sep 2021 |
| PAN CardFile: PAN Alok.pdf | 23 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Full page photo.pdf | 23 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 23 Sep 2021 |
| Declaration about Commencement CertificateFile: commencement declaration.pdf | 23 Sep 2021 |
| Layout approvalFile: LAYOUT PLAN.pdf | 18 Aug 2021 |
Promoter's earlier projects11
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Abhinav | S. No. G. No. 87 1 2 11 3 of Deolali Shiwar Nashik - 422101 | 78 | - | Ongoing | Dec 2026 | Dec 2026 |
| AARADHYA RESIDENCY PHASE II | S NO 31 2 1 19 Nashik Maharashtra | 63 | - | Ongoing | Dec 2026 | Dec 2026 |
| ARADHANA ENCLAVE | S NO 40 8 9 10 PLOT NO 4 Nashik Maharashtra | 14 | - | Ongoing | Dec 2025 | Dec 2025 |
| ARRPAN HOUSINGP51600022627 | VIHITGAON, Nashik | 415 | Oct 2019 | Completed | Apr 2025 | Jun 2024 |
| AARADHANA RESIDENCY - A | S no - 39 6 40 6 7 2 3 - Plot No 25 to 46 Nashik Maharashtra | 84 | - | Completed | Dec 2022 | Dec 2022 |
| AARADHANA RESIDENCY - B | S NO - 39 6 40 6 7 2 3 PLOT NO 62 65 Nashik Maharashtra | 16 | - | Completed | Dec 2022 | Dec 2022 |
| AARADHANA VILLAS | 39 6 40 6 7 2 3 Nashik Maharashtra | 13 | - | Completed | Dec 2020 | Dec 2020 |
| ABHINANDAN HEIGHTS | ANUSAYA NAGAR NEAR MHADA BUILDINGS MAKHMALABAD NASIK | 48 | - | Completed | Jun 2019 | Late, Jul 2019 |
| KAPALESHWAR CO OP HSG SOCIETY | OPP SURANA HOSPITAL ARTILLERY CENTER ROAD NASIKROAD | 38 | - | Completed | Mar 2019 | Mar 2019 |
| AARADHYA RESIDENCY | A WING OPP JADHAV HOSPITAL JAGTAP MALA ANAND NAGAR NASIKROAD | 45 | - | Completed | Jun 2018 | May 2018 |
| AANUSHREE RESIDENCY | PLOT NO 1 TO 8 BEHIND KAMAL AUTO ASHOKA MARG OPP ASHOKA SCHOOL NASIK | 53 | - | Completed | Mar 2018 | Late, May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
Keep ARADHANA ENCLAVE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ARTILLERY CENTER ROAD NASIKROAD4,100+ in Nashik
Filed coordinates, straight-line distance. 71 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: A C JAIN BUILDERS AND DEVELOPERS LLP
A C JAIN BUILDERS AND DEVELOPERS LLP has 8 registrations on MahaRERA, including ARRPAN HOUSING and AARADHANA RESIDENCY - A. Its filings disclose 11 earlier MahaRERA projects: declares 9 of 11 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if ARADHANA ENCLAVE is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ARADHANA ENCLAVE?
The registered promoter entity is A C JAIN BUILDERS AND DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27ABOFA9179M1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ARADHANA ENCLAVE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ARADHANA ENCLAVE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ARADHANA ENCLAVE?
The professionals named in the filing: Architect: AR DINESH UGHADE; Architect: AR MOHIT KANAVAT; Engineer: SANJAY SHRIRAM PATIL; Chartered Accountant: CA Paresh P. Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ARADHANA ENCLAVE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback