Home / Browse projects / Mumbai Suburban, Maharashtra / ANUTAM
ANUTAM
By TRULY HIGHDREAMS REALTORS LLP
RG-MH-28450 · RERA P51800026032 · Last updated on MahaRERA portal: 13 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANUTAM is a Residential / Group Housing project by TRULY HIGHDREAMS REALTORS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800026032 on 11 Aug 2020. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 36 months from the original filing. 31 of the 59 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameANUTAM
- TypeResidential / Group Housing
- Location
- ANDHERI WEST
- ANDHERI
- Mumbai Suburban
- 400058
- Pincode400058
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800026032
- ReraGenie IDRG-MH-28450
Builder
- NameTRULY HIGHDREAMS REALTORS LLP
- Entity typePartnership
- GSTIN27AALFT4303N1ZT
- Designated PartnerMAHESH NARENDRA SINGH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Aug 2020
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Sep 2023)
- Buildings1 building record
- Documents filed156 files
Current status
Figures as on 13 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SALE BUILDING - ANUTAM Wing C and D | NA | 10 | 10 | 59 | 0 | 59 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 50%.
SALE BUILDING - ANUTAM Wing C and D: 15% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 10% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed31
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| TRULY CREATIVE DEVELOPERS PVT LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SALE BUILDING - ANUTAM Wing C and D | NA | Rs 13.00 cr | Rs 84.20 lakh |
| - | NA | Rs 1.11 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHRI ARCH |
| Engineer | SUDHIR DESHPANDE |
| Engineer | Rakesh Tiwari |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | MOHANDAS & CO |
| Chartered Accountant | M N J & Associates |
| Chartered Accountant | Chetan Shah |
| Chartered Accountant | Anand Yadav |
| Partner | Role in project |
|---|---|
| TRULY HIGHDREAMS REALTORS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30/09/2023
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502342 | Prakash Vishnu Gurav | TRULY HIGHDREAMS REALTORS LLP | 10/07/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed156
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 156 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: ENGINEER CERTIFICATE FORM-2A 10082026-Signed.pdf | 13 Aug 2026 |
| Form 1File: architect certificate 31-03-23.pdf | 21 Jul 2026 |
| Form 2File: 11 Rera Form-2 THDRLLP_310323-Signed.pdf | 21 Jul 2026 |
| Form 3File: Form 3 Q4 31032023_signed_opt.pdf | 21 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: THDRLLP-Sold Inventory 31032023.pdf | 21 Jul 2026 |
| Form 1File: architect certificate31-03-24.pdf | 21 Jul 2026 |
| Form 2File: 15 Rera Form-2 THDRLLP_310324-Signed.pdf | 21 Jul 2026 |
| Form 3File: Form 3 Q4 31032024_signed_opt.pdf | 21 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: THDRLLP- Sold Inventory 31032024.pdf | 21 Jul 2026 |
| Form 1File: architect certificate june 24.pdf | 21 Jul 2026 |
| Form 2File: 16 Rera Form-2 THDRLLP_300624-Signed.pdf | 21 Jul 2026 |
| Form 3File: Form 3 Q1 30062024_signed_opt.pdf | 21 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: THDRLLP-Sold Inventory 30062024.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: Form-1 ARCHITECT CERT_30062026_Signed.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: Form2 Engg Cert 30062026_signed_opt.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Q1 30062026_signed_opt.pdf | 21 Jul 2026 |
| Form 5 (FY 2024-2025)File: Truly Highdreams Realtors LLP Form-5-310325_Signed_opt.pdf | 20 Jul 2026 |
| Form 5 (FY 2020-2021)File: Truly LLP_Form 5_310321_Scanned.pdf | 19 Jul 2026 |
| Form 5 (FY 2021-2022)File: Truly LLP_Form 5_310322_Scanned.pdf | 19 Jul 2026 |
| Form 5 (FY 2022-2023)File: Truly LLP_Form 5_310323_Scanned.pdf | 19 Jul 2026 |
| Form 5 (FY 2023-2024)File: Truly LLP_Form 5_310324_Signed_Compressed.pdf | 19 Jul 2026 |
| Withdrawal Update Form 1File: Form-1 Architects Certificate_31-03-2026.pdf | 13 May 2026 |
| Withdrawal Update Form 2File: Form-2_ENGINEERS CERTIFICATE_31-03-2026.pdf | 13 May 2026 |
| Withdrawal Update Form 3File: Form-3_CA Certificate_31-03-2026.pdf | 13 May 2026 |
| Form 1File: Form-1 Architech Cert 30092020.pdf | 8 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_30092020.pdf | 8 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_30092020.pdf | 8 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 30092020.pdf | 8 Apr 2026 |
| Form 1File: Form-1 Architech Cert 31122023.pdf | 8 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_31122023.pdf | 8 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_31122023_opt.pdf | 8 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 31122023 - Copy.pdf | 8 Apr 2026 |
| Form 1File: Form-1 Architech Cert_31032021.pdf | 8 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_31032021.pdf | 8 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_31032021.pdf | 8 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 31032021.pdf | 8 Apr 2026 |
| Form 1File: Form-1 Architech Cert 31032022.pdf | 8 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_31032022.pdf | 8 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_31032022_opt.pdf | 8 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 31032022.pdf | 8 Apr 2026 |
| Form 1File: Form-1 Architech Cert 31122020.pdf | 7 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_31122020.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_31122020.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory 31122020.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 30062021.pdf | 7 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_30062021.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_30062021.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 30062021.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 30092021.pdf | 7 Apr 2026 |
| Form 2File: 5 Rera Form-2 THDRLLP_300921-Signed.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_30092021.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 30092021.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 31122021.pdf | 7 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_31122021.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_31122021.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 31122021.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 30062022.pdf | 7 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_30062022.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_30062022.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 30062022.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 30092022.pdf | 7 Apr 2026 |
| Form 2File: 9 Rera Form-2 THDRLLP_300922-Signed.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_30092022.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 30092022.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 31122022.pdf | 7 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_31122022.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_31122022.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 31122022.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 30062023.pdf | 7 Apr 2026 |
| Form 2File: ENGINEERS CERTIFICATE_FORM-2_30062023.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_30062023.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 30062023 - Copy.pdf | 7 Apr 2026 |
| Form 1File: Form-1 Architech Cert 30092023.pdf | 7 Apr 2026 |
| Form 2File: 13 Rera Form-2 THDRLLP_300923-Signed.pdf | 7 Apr 2026 |
| Form 3File: FORM-3_CA CERTIFICATE_30092023.pdf | 7 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: 30092023 - Copy.pdf | 7 Apr 2026 |
| Form 2A (FY 2020-2021)File: ENGINEERS CERTIFICATE_FORM-2A_31032021.pdf | 7 Apr 2026 |
| Form 2A (FY 2021-2022)File: ENGINEERS CERTIFICATE_FORM-2A_31032022.pdf | 7 Apr 2026 |
| Form 2A (FY 2022-2023)File: ENGINEERS CERTIFICATE_FORM-2A_31032023.pdf | 7 Apr 2026 |
| Form 2A (FY 2024-2025)File: ENGINEERS CERTIFICATE_FORM-2A_31032025.pdf | 7 Apr 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 156 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANUTAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ANDHERI6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 375 registered projects within 2 km.
PEARL UNIVERSE
CHANDIWALA ENTERPRISES PRIVATE LIMITED
PRANAMI BLISS
Pranami Neev Realty Limited
Alpine Primo
ALPINE INFRAHEIGHTS LLP
NAMAN HABITAT
SHREE NAMAN DEVELOPERS PVT LTD
Vantage
Rolland Spaces Private Limited
Nasar Enclave Sale Building A and B Wing
M/s. Nasar Associates
See every Mumbai Suburban project, with the district possession charts
Builder: TRULY HIGHDREAMS REALTORS LLP
TRULY HIGHDREAMS REALTORS LLP has 1 registration on MahaRERA, including ANUTAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if ANUTAM is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANUTAM?
The registered promoter entity is TRULY HIGHDREAMS REALTORS LLP, a partnership as per the filing. Its GSTIN 27AALFT4303N1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANUTAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ANUTAM?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ANUTAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANUTAM?
The professionals named in the filing: Architect: SHRI ARCH; Engineer: SUDHIR DESHPANDE; Engineer: Rakesh Tiwari; Chartered Accountant: NEHALI & CO; Chartered Accountant: MOHANDAS & CO; Chartered Accountant: M N J & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANUTAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback