Home / Browse projects / Nagpur, Maharashtra / ANURAG ORCHID

Completed No litigation declared Residential / Group Housing project

ANURAG ORCHID

By ANURAG DEVELOPERS

RG-MH-04088 · RERA P50500045638 · Last updated on MahaRERA portal: 13 Nov 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Stilt Floor, 80%
2 of 7Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

ANURAG ORCHID is a Residential / Group Housing project by ANURAG DEVELOPERS in Nagpur, Maharashtra, registered with MahaRERA as P50500045638 on 26 May 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 5 of the 7 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameANURAG ORCHID
  • TypeResidential / Group Housing
  • Location
    • Jaitala Vaishali Nagar Road
    • Near Dhyandeep Convet SRPF Gate No 3 Jaitala
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440036
  • Pincode440036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500045638
  • ReraGenie IDRG-MH-04088

Builder

  • NameANURAG DEVELOPERS
  • Entity typePartnership
  • GSTIN27AAMFA7249R1ZK
  • PartnersWAMAN SADASHIV KHUNE, VIMAL WAMAN KHUNE, RASHMI CHANDRASHEKHAR KHUNE, CHANDRASHEKHAR WAMAN KHUNE
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 May 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed56 files

Current status

71%5 of 7 units booked
100.0%Work done, per cost certificate

Figures as on 13 Nov 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANURAG ORCHIDNA80707

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

ANURAG ORCHID: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 13 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,328 sq m
Land owned byThe promoter
Named landownersNone
Declared on12 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3717.0
Proposed, not sanctioned3,717 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEENDAYAL NAGAR NAGPUR 440022
Estimated costRs 11.99 cr
Cost incurredRs 11.99 cr
Work done99.98%
BuildingWingEstimatedIncurred
ANURAG ORCHIDNARs 11.99 crRs 11.99 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR SHASHANK ARYA
ArchitectSaurabh Arya
EngineerMR SANDEEP GAIKWAD
EngineerSANDEEP GAIKWAD
Chartered AccountantMR SANDEEP VIRANI
Chartered AccountantK P R AND ASSOCIATES
Chartered AccountantVIRANI & CO
PartnerRole in project
ANURAG DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Nov 2024

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 24-08-2024-2.pdf13 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE.pdf13 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC certificate.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3 - ARCHITECT CERTIFICATE.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHITECTS CERTIFICATE.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate-.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: sold inventory.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA CERTIFICATE ANURAG ORCHID-Q4-compressed_compressed_compressed_compressed.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 3 - ARCHITECT CERTIFICATE.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 3 - Engineer Certificate-.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf30 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf20 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECTS CERTIFICATE 28-08-23.pdf30 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate _compressed.pdf30 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A certificate _compressed.pdf30 Aug 2023
Building plan approvalFile: REVISE MAP (2)_compressed.pdf18 Jul 2023
Building plan approvalFile: REVISE MAP (1)_compressed.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISE MAP (2)_compressed.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: REVISE MAP (1)_compressed.pdf18 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Revise Building commencement certificate_compressed.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate-2.pdf23 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cerficate-2.pdf23 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: chartered accountants certificate.pdf23 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE SAGAR_221201_111455.pdf3 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11-02-23 ARCHITECT CERTIFICATE ANURAG ORCHID.pdf3 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11-02-23 Anurag Orchid Engineer certificate.pdf3 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11-02-23 C A Anurag orchid Form 3_compressed-1.pdf3 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE ORCHID.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate sagar enclave -1.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate sagar enclave -1.pdf2 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate anurag orchid-1.pdf2 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATES 1.pdf2 Dec 2022
Declaration about Commencement CertificateFile: undertaking.pdf21 May 2022
Building plan approvalFile: Building plan_.pdf7 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Building plan_.pdf7 Apr 2022
Layout approvalFile: layout plan 2.pdf1 Apr 2022
Details of encumbrancesFile: Encumberence certificate.pdf1 Apr 2022
Copy of Layout Approval (in case of layout)File: layout plan 2.pdf1 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf1 Apr 2022
PAN CardFile: pan cards.pdf26 Mar 2022
Copy of the legal title reportFile: legal title report.pdf26 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: permit.pdf26 Mar 2022
Declaration about Commencement CertificateFile: Declaration about Commencement certificate.pdf26 Mar 2022
Declaration in FORM BFile: Form B.pdf26 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf26 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf26 Mar 2022
CERSAI detailsFile: CERSAI Report.pdf26 Mar 2022
Proforma of Allotment letterFile: Allotment Letter.pdf26 Mar 2022
Proforma of Allotment letterFile: AGREEMENT-ANURAG DEVELOPERS-'ANURAG ORCHID'.pdf26 Mar 2022
OtherFile: Sale Deed.pdf26 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHEKHAR ENCLAVEPLOT NO 01 DHYANDEEP NAGAR DIGDOH NAGPUR25CompletedDec 2021Feb 2021

How this compares with Nagpur

71%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANURAG ORCHID on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Dhyandeep Convet SRPF Gate No 3 Jaitala2,800+ in Nagpur

2 kmANURAG ORCHIDCompleted 12Lapsed / revoked 6Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: ANURAG DEVELOPERS

ANURAG DEVELOPERS has 4 registrations on MahaRERA, including ANAND RESIDENCY and SHEKHAR ENCLAVE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ANURAG ORCHID is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANURAG ORCHID?

The registered promoter entity is ANURAG DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAMFA7249R1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANURAG ORCHID?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANURAG ORCHID?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANURAG ORCHID?

The professionals named in the filing: Architect: MR SHASHANK ARYA; Architect: Saurabh Arya; Engineer: MR SANDEEP GAIKWAD; Engineer: SANDEEP GAIKWAD; Chartered Accountant: MR SANDEEP VIRANI; Chartered Accountant: K P R AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANURAG ORCHID?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANURAG ORCHID. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANURAG ORCHID to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.