Home / Browse projects / Nashik, Maharashtra / ANTARANG APARTMENT
ANTARANG APARTMENT
RG-MH-41474 · RERA P51600048580 · Last updated on MahaRERA portal: 25 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 16.00 crore secured on the land, in favour of STATE BANK OF INDIA
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANTARANG APARTMENT is a Others project by SHRINATH REALTY in Nashik, Maharashtra, registered with MahaRERA as P51600048580 on 10 Jan 2023. Possession is promised by 31 Dec 2027. 36 of the 100 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.
At a glance
Project
- NameANTARANG APARTMENT
- TypeOthers
- Location
- Nashik Road
- Nashik
- Deolaligaon
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600048580
- ReraGenie IDRG-MH-41474
Builder
- NameSHRINATH REALTY
- Entity typePartnership
- PartnersRAMESHWAR SHANKARLAL MALANI, SNEHA ANKIT MALANI, KISHOR RAJENDRA MALANI, ASHISH NANDKISHOR MALANI, VIVEK RAJESH KASAT, GOVIND RAMESHWAR MALANI, GIRISH VIJAY MALANI
- Other registrations2 more →
- Completed1 of 3
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Jan 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed83 files
Current status
Figures as on 25 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Antarang Apartment Wing A | NA | 13 | 13 | 42 | 12 | 54 |
| Antarang Apartment Wing B | NA | 13 | 12 | 46 | 0 | 46 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
Antarang Apartment Wing A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Antarang Apartment Wing B90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership8
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Dinesh Prabhudas Sachdev | Deolaligaon | Nashik |
| Vijay Mudhanna Shetty | Deolaligaon | Nashik |
| Chandrashekhar Keshav Chandankhede | Deolaligaon | Nashik |
| Anju Prabhudas Sachdev | Deolaligaon | Nashik |
| Vrusha Dinesh Motwani | Pune (M Corp.) | Pune |
| Muskan Kamal Mewani | Deolaligaon | Nashik |
| Bhagwandas Alias Bhagwan Jethanand Krishnani | Deolaligaon | Nashik |
| Jay Jethanand Sachdev | Deolaligaon | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Antarang Apartment Wing A | NA | Rs 16.35 cr | Rs 12.66 cr |
| Antarang Apartment Wing B | NA | Rs 15.45 cr | Rs 11.97 cr |
| - | NA | Rs 2.00 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shailesh Ramesh Devi |
| Engineer | Associated Structural Engineers LLP |
| Chartered Accountant | Anand S Daga |
| Chartered Accountant | Aditya Pravin Rathi |
| Chartered Accountant | Pravin R Rathi & Associates |
| Partner | Role in project |
|---|---|
| SHRINATH REALTY | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 RERA Antarang 4th - Architect Certificate Jan to Mar 2026.pdf | 25 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 RERA Antarang 4th Quarter Eng Certificate Wing Wise Jan to Mar 2026.pdf | 25 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Antarang Q4 2025-26.pdf | 25 Jun 2026 |
| Form 5 (FY 2024-2025)File: Form 5 CA Certificate Antarang 01-02-24 to 31-03-25.pdf | 27 May 2026 |
| Form 1File: Form 1 Jul to Sep 2025 Apr 2025 - Architect Certificate.pdf | 18 May 2026 |
| Form 2File: Form 2 Jul to Sep 2025- July Antarang Engineers Certificate.pdf | 18 May 2026 |
| Form 3File: Form 3 Antarang Q2 25-26.pdf | 18 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sep2025 Antarang Sold Unsold Inventory.pdf | 18 May 2026 |
| OthersFile: Form 2A Annexure C Form 2A Antarang Quality Assurance Certificate.pdf | 18 May 2026 |
| Form 1File: Form 1 RERA Antarang 3rd Quarter Architect Cerficate Oct to Dec-2025.pdf | 18 May 2026 |
| Form 2File: Form 2 RERA Antarang 3rd Quarter Eng Certificate Oct to Dec 2025.pdf | 18 May 2026 |
| Form 3File: Form 3 Antarang Apartment Q3.pdf | 18 May 2026 |
| Disclosure of Sold and Booked InventoryFile: RERA Antarang 3rd Quarter Sold Unsold Oct to Dec 2025.pdf | 18 May 2026 |
| Form 1File: Jan to Mar 2025 Apr 2025 Form 1 - Architect Certificates.pdf | 26 Oct 2025 |
| Form 2File: Revised Antarang Jan to Mar 2025 Eng Certificate.pdf | 26 Oct 2025 |
| Form 3File: Form 3 Q4 24-25.pdf | 26 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Mar 2025 Revised Antarang Sold Unsold Inventory.pdf | 26 Oct 2025 |
| OthersFile: Annexure C Form 2A Mar 25 Antarang Quality Assurance Certificate.pdf | 26 Oct 2025 |
| Form 1File: Apr to Jun 2025 Apr 2025 Form 1 - Architect Certificates.pdf | 26 Oct 2025 |
| Form 2File: Revised Antarang April to Jun 2025 Eng Certificate.pdf | 26 Oct 2025 |
| Form 3File: Form 3 Q1 25-26.pdf | 26 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Jun 2025 Revised Antarang Sold Unsold Inventory.pdf | 26 Oct 2025 |
| OthersFile: Annexure C Form 2A Jun 25 Antarang Quality Assurance Certificate.pdf | 26 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Oct to Dec 2024 Jan 2025 Form 1 - Architect Certificate.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Oct to Dec 2024 Jan 2025 Form 2 - Engineer's Certificate.pdf | 11 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Dec 2024 Revised Antarang Sold Unsold Inventory.pdf | 11 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Antarang CA Form 5, Annual April 23 to Mar 24.pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Apr to June 2024- July Antarang Form 2 - Engineer's Certificate.pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jan to Mar 2024- Apr Antarang Form 2 - Engineer's Certificate (1).pdf | 29 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Oct to Dec 2023- Jan Antarang Form 2 - Engineer's Certificate.pdf | 29 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Annexure C Form 2A Antarang Qualty Assurance Certificate.pdf | 29 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 29 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Form1 Apl 2023.pdf | 20 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Form1 July 2023.pdf | 20 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form1 Oct 2023.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form2 Apl 2023.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form2 July 2023.pdf | 20 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form2 Oct 2023.pdf | 20 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New CA Form 3.pdf | 20 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Antarang Sold Unsold.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf | 26 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate Form 2A.pdf | 26 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 26 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 26 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Annual Report Form 5.pdf | 26 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration about Finance.pdf | 5 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Declaration about Finance.pdf | 5 Jan 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 5.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 6.pdf | 5 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 7.pdf | 5 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Declaration.pdf | 5 Jan 2023 |
| Other - FinanceFile: Naradco Certificate.pdf | 3 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Finace and Legal.pdf | 13 Dec 2022 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Finace and Legal.pdf | 13 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 13 Dec 2022 |
| Other - LegalFile: Declaration about Legal.pdf | 12 Dec 2022 |
| Other - FinanceFile: Declaration about Finance.pdf | 12 Dec 2022 |
| Building plan approvalFile: Building Plan1_compressed (1).pdf | 29 Nov 2022 |
| Building plan approvalFile: Building Plan2_compressed.pdf | 29 Nov 2022 |
| Building plan approvalFile: Building Plan3_compressed (1).pdf | 29 Nov 2022 |
| Building plan approvalFile: Building Plan4_compressed.pdf | 29 Nov 2022 |
| Copy of the legal title reportFile: Title Report_compressed.pdf | 29 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan1_compressed (1).pdf | 29 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan2_compressed.pdf | 29 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan3_compressed (1).pdf | 29 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan4_compressed.pdf | 29 Nov 2022 |
| Declaration in FORM BFile: Form B Developer.pdf | 29 Nov 2022 |
| Declaration in FORM BFile: Form B Land Owner.pdf | 29 Nov 2022 |
| Proforma of Agreement for saleFile: Model Agreement For Sale.pdf | 29 Nov 2022 |
| Layout approvalFile: Layout.pdf | 28 Nov 2022 |
| PAN CardFile: Shrinath Realty PAN Card.pdf | 28 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 28 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 28 Nov 2022 |
| Declaration about Commencement CertificateFile: Form D.pdf | 28 Nov 2022 |
| Proforma of Allotment letterFile: Model Allotment letter.pdf | 28 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ANTARANG APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 286 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: SHRINATH REALTY
SHRINATH REALTY has 3 registrations on MahaRERA, including SUKHAYUSH APARTMENT and ANTARANG APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if ANTARANG APARTMENT is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANTARANG APARTMENT?
The registered promoter entity is SHRINATH REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANTARANG APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ANTARANG APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANTARANG APARTMENT?
The professionals named in the filing: Architect: Shailesh Ramesh Devi; Engineer: Associated Structural Engineers LLP; Chartered Accountant: Anand S Daga; Chartered Accountant: Aditya Pravin Rathi; Chartered Accountant: Pravin R Rathi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANTARANG APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback