ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Anora Residency

Completed No litigation declared Others project

Anora Residency

By ANORA RESIDENCY

RG-MH-12031 · RERA P99000008234 · Last updated on MahaRERA portal: 29 Jul 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jul 2026Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 98%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Anora Residency is a Others project by ANORA RESIDENCY in Palghar, Maharashtra, registered with MahaRERA as P99000008234 on 18 Aug 2017. The registration is recorded completed; possession was promised by 16 Jul 2026.

At a glance

Project

  • NameAnora Residency
  • TypeOthers
  • Location
    • PREMIUM PARK ROAD
    • OPP PARITOSH TOWER
    • BH. PARIKH COMMERCIAL CENTER
    • VIRAR WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000008234
  • ReraGenie IDRG-MH-12031

Builder

  • NameANORA RESIDENCY
  • Entity typePartnership
  • PartnersSunil Laxman Vartak, Sudhir Mahadeo Raut, Rajesh Jagganath Raut, Sanjesh Jagganath Raut, Shubangi Satish Vartak, Rajan Laxman Vartak, Prashant Mahadeo Vartak, Kalpana Sudhir Raut, Varsha Vijay Patil

Key dates

this monthRegisteredAug 2017PromisedJul 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion16 Jul 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANORA RESIDENCY WING ANA140000
ANORA RESIDENCY WING BNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 98%.

ANORA RESIDENCY WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ANORA RESIDENCY WING B72%
ActivityProgress
Excavation98%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor92%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 29 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes10%

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered36
Open Space32
BuildingClosed/CoveredOpen SpaceTotal
ANORA RESIDENCY WING A161733
ANORA RESIDENCY WING B201535

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,016 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7539.32
Proposed, not sanctioned7,529 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchADINATH APARTMENT, AMBADI ROAD, NAVGHAR, VASAI

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshutosh G Jathar
PartnerRole in project
ANORA RESIDENCY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jan 2020

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JULY-2022 ANORA.pdf29 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 JULY-2022 ANORA.pdf29 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2-A FY YR 2021-22 ANORA.pdf29 Jul 2022
Disclosure of sold/ booked inventoryFile: Anora Sold Unsold Flats For Wing A.pdf29 Jul 2022
Disclosure of sold/ booked inventoryFile: Anora Sold Unsold Flats For Wing B.pdf29 Jul 2022
Disclosure of sold/ booked inventoryFile: ANORA A WING SOLD INVENTORY.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: ANORA WING B SOLD INVENTORY.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 5 .pdf21 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 .pdf21 Oct 2020
Architect’s Certificate on Completion of Project (Form 4)File: OC Anora Residency Wing A .pdf17 Feb 2020
OtherFile: OC Anora Residency Wing A .pdf17 Feb 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Anora.pdf3 Feb 2020
Architect’s Certificate on Completion of Project (Form 4)File: Architects Certificate 28-1-20 .pdf1 Feb 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Anora Residency Wing A .pdf28 Jan 2020
Building plan approvalFile: Sheet 1 (2).pdf19 Mar 2019
Building plan approvalFile: Sheet 7.pdf19 Mar 2019
Building Plan Approval (IOD)File: Sheet 1 (2).pdf19 Mar 2019
Building Plan Approval (IOD)File: Sheet 7.pdf19 Mar 2019
Layout approvalFile: Sheet 2 .pdf2 Mar 2019
Layout approvalFile: Sheet 1 (2).pdf2 Mar 2019
Building plan approvalFile: Sheet 2 .pdf2 Mar 2019
Building plan approvalFile: Sheet 3 (1).pdf2 Mar 2019
Building plan approvalFile: sheet 4 .pdf2 Mar 2019
Building plan approvalFile: Sheet 5.pdf2 Mar 2019
Building plan approvalFile: Sheet 6 .pdf2 Mar 2019
Building plan approvalFile: Sheet 8 (1).pdf2 Mar 2019
Building plan approvalFile: Sheet 9.pdf2 Mar 2019
Copy of Layout Approval (in case of layout)File: Sheet 2 .pdf2 Mar 2019
Copy of Layout Approval (in case of layout)File: Sheet 1 (2).pdf2 Mar 2019
Building Plan Approval (IOD)File: Sheet 2 .pdf2 Mar 2019
Building Plan Approval (IOD)File: Sheet 3 (1).pdf2 Mar 2019
Building Plan Approval (IOD)File: sheet 4 .pdf2 Mar 2019
Building Plan Approval (IOD)File: Sheet 5.pdf2 Mar 2019
Building Plan Approval (IOD)File: Sheet 6 .pdf2 Mar 2019
Building Plan Approval (IOD)File: Sheet 8 (1).pdf2 Mar 2019
Building Plan Approval (IOD)File: Sheet 9.pdf2 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate 7-12-2018.pdf13 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 30072018.pdf15 Oct 2018
Certificates of CA (Form 5)File: Certificates of CA (Form 5).pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: FINALCC.pdf30 Jul 2018
Proforma of Allotment letterFile: Anora Residency Sale Agreement1.pdf30 Jul 2018
Proforma of Allotment letterFile: Anora Residency Sale Agreement.pdf24 May 2018
Details of encumbrancesFile: Index 2 of Mortgage (1).pdf9 May 2018
Declaration in FORM BFile: New FORM ‘B’ promoter.pdf9 May 2018
Building plan approvalFile: Revised development 13102017.pdf8 Dec 2017
Building plan approvalFile: plan 13102017 .pdf8 Dec 2017
Building Plan Approval (IOD)File: Revised development 13102017.pdf8 Dec 2017
Building Plan Approval (IOD)File: plan 13102017 .pdf8 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: Revised development 13102017.pdf8 Dec 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for RERA.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf29 Jul 2017
Proforma of Allotment letterFile: Agreement for Sale RERA.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate plot 5.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate plot 6.pdf27 Jul 2017
Building plan approvalFile: Plan No 6.pdf26 Jul 2017
Layout approvalFile: Plan No 1.pdf26 Jul 2017
Building plan approvalFile: Plan No 3.pdf26 Jul 2017
Building plan approvalFile: Plan No 2.pdf26 Jul 2017
Building plan approvalFile: Plan No 5.pdf26 Jul 2017
PAN CardFile: Pan Card Of Anora Residency.pdf26 Jul 2017
Copy of the legal title reportFile: Title Clearance Certificate of Plot No 5 and 6.pdf26 Jul 2017
Details of encumbrancesFile: Details of Encumbrances.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Plan No 1.pdf26 Jul 2017
Building Plan Approval (IOD)File: Plan No 3.pdf26 Jul 2017
Building Plan Approval (IOD)File: Plan No 2.pdf26 Jul 2017
Building Plan Approval (IOD)File: Plan No 5.pdf26 Jul 2017
Building Plan Approval (IOD)File: Plan No 6.pdf26 Jul 2017
Declaration in FORM BFile: Form B.pdf26 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anora Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BH. PARIKH COMMERCIAL CENTER, VIRAR WEST3,200+ in Palghar

2 kmAnora ResidencyCompleted 46Lapsed / revoked 30Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: ANORA RESIDENCY

ANORA RESIDENCY has 1 registration on MahaRERA, including Anora Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Anora Residency is delayed beyond 16 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anora Residency?

The registered promoter entity is ANORA RESIDENCY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anora Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anora Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anora Residency?

The professionals named in the filing: Architect: Ashutosh G Jathar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anora Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anora Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anora Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.