Home / Browse projects / Nashik, Maharashtra / Anmol Nayantara Empire

Completed No litigation declared Residential / Group Housing project

Anmol Nayantara Empire

By Bafna Builders and Land Developers

RG-MH-00968 · RERA P51600001304 · Last updated on MahaRERA portal: 10 Jun 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
32 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

Anmol Nayantara Empire is a Residential / Group Housing project by Bafna Builders and Land Developers in Nashik, Maharashtra, registered with MahaRERA as P51600001304 on 27 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameAnmol Nayantara Empire
  • TypeResidential / Group Housing
  • Location
    • Nashik
    • 422002
  • Pincode422002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600001304
  • ReraGenie IDRG-MH-00968

Builder

  • NameBafna Builders and Land Developers
  • Entity typePartnership
  • PartnersTaradevi Ratanlal Bafna, Siddharth Ratanlal Bafna, Sushil Kasturchand Bafna
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJul 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jul 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings4 building records
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA120000
B WingNA120000
C WingNA120000
D WingNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 10 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

32 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.

A wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D Wing73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed116

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots116
Closed/Covered72
Open Space44
BuildingClosed/CoveredOpen SpaceTotal
A wing181129
B Wing181129
C Wing181129
D Wing181129

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,166 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19221.07
Proposed, not sanctioned8,063 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB 19 utility center sharanpur road nasik

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHomework
PartnerRole in project
Bafna Builders and Land Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600001028Dec 2018 → Dec 2019

Reason as filed by the promoter• The Project Anmol Nayantara Empire comprising 4 buildings, Clubhouse and Multi-purpose Hall along with basic infrastructure is virtually completed. • Total Handover are 65 / 80 as of December 2018. • Total Occupants Residing 41 Nos as of December 2018 • Nashik Municipal Corporation has granted appropriate water supply Connection based on occupied number of premises. • MSEDCL has also provided residential meter to common areas and individual. • All other basic infrastructure is in place and being augmented on the basis of physical occupation of the customer. • Bafna Builders and Land Develope

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Jun 2022

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Layout.pdf10 Jun 2022
Building plan approvalFile: Typical Plan.pdf10 Jun 2022
Building plan approvalFile: Upper floor Plan.pdf10 Jun 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf10 Jun 2022
Building Plan Approval (IOD)File: Typical Plan.pdf10 Jun 2022
Building Plan Approval (IOD)File: Upper floor Plan.pdf10 Jun 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf10 Jun 2022
Building plan approvalFile: 8th n 10th floor _R1.pdf6 Jan 2022
Building plan approvalFile: Typical even floor_R1.pdf6 Jan 2022
Building plan approvalFile: Typical odd n 9th floor R1.pdf6 Jan 2022
Building Plan Approval (IOD)File: 8th n 10th floor _R1.pdf6 Jan 2022
Building Plan Approval (IOD)File: Typical even floor_R1.pdf6 Jan 2022
Building Plan Approval (IOD)File: Typical odd n 9th floor R1.pdf6 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: EMPIRE - DEED OF DECLARATION - 6-8203-2021 - 21-10-2021 - BAFNA BUILDERS AND LAND DEVELOPE22 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5-Empire.pdf30 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: form-4- Empire.pdf30 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: empire architect cer(1)_compressed.pdf24 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate empire.pdf24 Aug 2019
Certificates of CA (Form 3)File: CA certificate Empire part 2.pdf24 Aug 2019
Certificates of CA (Form 5)File: CA certificate Empire part 1.pdf24 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: empire architect (1).pdf24 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: empire architect (2).pdf24 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng empire.pdf24 Dec 2018
Certificates of CA (Form 3)File: empire cA (1).pdf24 Dec 2018
Certificates of CA (Form 3)File: empire cA (2).pdf24 Dec 2018
Certificates of CA (Form 5)File: empire form5_1.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Empire Rera Certificate archi part 1.pdf2 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Empire Rera Certificate archi part 2.pdf2 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: empire eng certificate_20180302154039.pdf2 Mar 2018
Certificates of CA (Form 3)File: form 3 empire_20180302153830.pdf2 Mar 2018
Certificates of CA (Form 5)File: form 5 empire_20180302153845.pdf2 Mar 2018
Proforma of Allotment letterFile: EMPIRE - RERA AGREEMENT - FINAL.pdf17 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: scan copy of Empire Rera Certificate.pdf21 Jul 2017
Proforma of Allotment letterFile: EMPIRE - RERA AGREEMENT - FINAL(1).pdf21 Jul 2017
Certificates of CA (Form 3)File: form 3 empire_20170720120141(1).pdf20 Jul 2017
Certificates of CA (Form 5)File: Form5 Empire.pdf20 Jul 2017
Layout approvalFile: scan288(1)(1).pdf19 Jul 2017
Building plan approvalFile: scan288(1)(1).pdf19 Jul 2017
Layout approvalFile: clearity cetificate empire.pdf19 Jul 2017
Building plan approvalFile: clearity cetificate empire.pdf19 Jul 2017
PAN CardFile: bbld pan card.pdf19 Jul 2017
Copy of the legal title reportFile: legal tittle empire.pdf19 Jul 2017
Details of encumbrancesFile: details of encumbrance Empire.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: scan288(1)(1).pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: clearity cetificate empire.pdf19 Jul 2017
Building Plan Approval (IOD)File: scan288(1)(1).pdf19 Jul 2017
Building Plan Approval (IOD)File: clearity cetificate empire.pdf19 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: commencement Empire.pdf19 Jul 2017
Declaration in FORM BFile: form B empire_20170719105135.pdf19 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Empire_engg certificate(1).pdf19 Jul 2017

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 12 months
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anmol Nayantara Empire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nashik4,100+ in Nashik

2 kmAnmol Nayantara EmpireCompleted 3Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: Bafna Builders and Land Developers

Bafna Builders and Land Developers has 2 registrations on MahaRERA, including Anmol Nayantara Empire and Anmol Nayantara Gold. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Anmol Nayantara Empire is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anmol Nayantara Empire?

The registered promoter entity is Bafna Builders and Land Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anmol Nayantara Empire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anmol Nayantara Empire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anmol Nayantara Empire?

The professionals named in the filing: Architect: Homework. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anmol Nayantara Empire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anmol Nayantara Empire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anmol Nayantara Empire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.