Home / Browse projects / Nashik, Maharashtra / Anmol Nayantara City One phase 4
Anmol Nayantara City One phase 4
RG-MH-00719 · RERA P51600000299 · Last updated on MahaRERA portal: 16 Jan 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Anmol Nayantara City One phase 4 is a Residential / Group Housing project by Bafna Realtors Pvt Ltd in Nashik, Maharashtra, registered with MahaRERA as P51600000299 on 15 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing.
At a glance
Project
- NameAnmol Nayantara City One phase 4
- TypeResidential / Group Housing
- Location
- Nashik
- 422008
- Pincode422008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600000299
- ReraGenie IDRG-MH-00719
Builder
- NameBafna Realtors Pvt Ltd
- Entity typeCompany
- Managing DirectorAbhay Kantilal Tated
- Other registrations7 more →
- Completed7 of 8
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Jul 2017
- Promised completion30 Dec 2021
- Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
- Buildings5 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F-Eucalyptus | NA | 15 | 0 | 0 | 0 | 0 |
| Q-Woodward | NA | 15 | 0 | 0 | 0 | 0 |
| Building One -Silver Oak | NA | 15 | 0 | 0 | 0 | 0 |
| O-Spring grove | NA | 15 | 0 | 0 | 0 | 0 |
| P- Willow | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 16 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
25 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 90%.
F-Eucalyptus68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 78% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Q-Woodward70%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 87% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Building One -Silver Oak71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 35% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
O-Spring grove76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
P- Willow71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 16 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 25% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 85% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 85% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 50% |
Parking filed229
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| F-Eucalyptus | 39 | 8 | 47 |
| Q-Woodward | 42 | 6 | 48 |
| Building One -Silver Oak | 35 | 10 | 45 |
| O-Spring grove | 36 | 6 | 42 |
| P- Willow | 41 | 6 | 47 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| EVERPLUS Properties and Developers LLP | Andheri | Mumbai Suburban |
| Paresh Bhagat | Mumbai City | Mumbai City |
| Rajendra Babulal Malu | jaysingpur | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shri Architect |
| Architect | Homework |
| Partner | Role in project |
|---|---|
| Bafna Realtors Pvt Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo The RERA, Maharashtra State. Sir, The project Anmol Nayantara City-One by Bafna Realtors Private Limited are divided into following: Phase-1-Wing- A,B,C,D & E (RERA No.-P51600000539) Phase-2-Wing- I, J, K & Building-2 (RERA No.-P51600000565) Phase-3-Wing- G & H (RERA No.-P51600000354) Phase-4-Wing- F, Q, O, P & Building-1 (RERA No.-P51600000299) Phase-5-Wing- L, M & N (RERA No.-P51600001252) The said project has received complete approval for all phases from Nashik Municipal Corporation. The CC No.-LND/BP/A3/22412/17084 dated 01.03.2018. Initially as per NMC Bylaws elements like cupboards,
Litigation declared8
| Case | Court | Status |
|---|---|---|
| SPCS no 666/2011 | Civil judge senior division | pending |
| CMA no 287/2014 | Civil judge senior division | pending |
| RCS no 1194 ,old SPCS no 326/2002/2012 | Civil judge senior division | pending |
| SPCS no 433/2011 | Civil judge senior division | pending |
| Final Decree no 1/2014 | Civil judge senior division | pending |
| WP no 10622/2005 | High Court Bombay | pending |
| CP no 306/2015 | High Court Bombay | pending |
| 63/2017/2017 | Civil Judge Senior Division Nashik | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 16 Jan 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: City one O wing.pdf | 29 Nov 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: City one P wing.pdf | 29 Nov 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: City one Q wing.pdf | 29 Nov 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: CITY ONE-F-EUCALYPTUS.pdf | 29 Nov 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: City One Phase4.pdf | 9 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: archi phase 4 c1 (2).pdf | 19 Jun 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: archi phase 4 c1 (3).pdf | 19 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: City One- 4th Phase_compressed.pdf | 19 Jun 2019 |
| Certificates of CA (Form 3)File: form 3 phase 4 c1 (2)_compressed.pdf | 19 Jun 2019 |
| Building plan approvalFile: Bldg F J Q.pdf | 10 Apr 2018 |
| Building plan approvalFile: Bldg H I O.pdf | 10 Apr 2018 |
| Layout approvalFile: Bldg E P G.pdf | 10 Apr 2018 |
| Building plan approvalFile: Bldg 1.pdf | 10 Apr 2018 |
| Copy of Layout Approval (in case of layout)File: Bldg E P G.pdf | 10 Apr 2018 |
| Building Plan Approval (IOD)File: Bldg F J Q.pdf | 10 Apr 2018 |
| Building Plan Approval (IOD)File: Bldg H I O.pdf | 10 Apr 2018 |
| Building Plan Approval (IOD)File: Bldg 1.pdf | 10 Apr 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch C-1 PH 4.pdf | 3 Mar 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate c1 ph4_20180303165654.pdf | 3 Mar 2018 |
| Certificates of CA (Form 3)File: City-1 P-4 Form 3.pdf | 3 Mar 2018 |
| Certificates of CA (Form 5)File: City-1 Ph 4 Form 5.pdf | 3 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement city one.pdf | 2 Mar 2018 |
| Proforma of Allotment letterFile: CITY ONE - RERA - MASTER AGREEMENT - PHASE 4 - FQOP B1 - REVISED.pdf | 17 Jan 2018 |
| Building plan approvalFile: 1.pdf | 12 Jul 2017 |
| Building plan approvalFile: 2.pdf | 12 Jul 2017 |
| Building plan approvalFile: 3.pdf | 12 Jul 2017 |
| Building plan approvalFile: 4.pdf | 12 Jul 2017 |
| Building plan approvalFile: clarity_20170711120427(1).pdf | 12 Jul 2017 |
| Layout approvalFile: P1.pdf | 12 Jul 2017 |
| Layout approvalFile: P2.pdf | 12 Jul 2017 |
| Layout approvalFile: P3.pdf | 12 Jul 2017 |
| Layout approvalFile: P4.pdf | 12 Jul 2017 |
| Layout approvalFile: Proposed Plan_CITY ONE RERA.pdf | 12 Jul 2017 |
| Layout approvalFile: clarity_20170711120427(1).pdf | 12 Jul 2017 |
| PAN CardFile: BRPL Pan card-min.pdf | 12 Jul 2017 |
| Copy of the legal title reportFile: search of city one all in one(1).pdf | 12 Jul 2017 |
| Details of encumbrancesFile: details encumbrance c1_20170711131614.pdf | 12 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: P1.pdf | 12 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: P2.pdf | 12 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: P3.pdf | 12 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: P4.pdf | 12 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Proposed Plan_CITY ONE RERA.pdf | 12 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: clarity_20170711120427(1).pdf | 12 Jul 2017 |
| Building Plan Approval (IOD)File: 1.pdf | 12 Jul 2017 |
| Building Plan Approval (IOD)File: 2.pdf | 12 Jul 2017 |
| Building Plan Approval (IOD)File: 3.pdf | 12 Jul 2017 |
| Building Plan Approval (IOD)File: 4.pdf | 12 Jul 2017 |
| Building Plan Approval (IOD)File: clarity_20170711120427(1).pdf | 12 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: comencement certificate c1_20170711122945.pdf | 12 Jul 2017 |
| Declaration in FORM BFile: phase 4 form b.pdf | 12 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate c1p4_20170712113333.pdf | 12 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate phase 4_20170711162300(1).pdf | 12 Jul 2017 |
| Certificates of CA (Form 3)File: Form-3 p4.pdf | 12 Jul 2017 |
| Certificates of CA (Form 5)File: Form5 (2).pdf | 12 Jul 2017 |
| Proforma of Allotment letterFile: A and A FQOP B1.pdf | 12 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep Anmol Nayantara City One phase 4 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 286 registered projects within 2 km.
Malpani Central
Ashish Hemant Malpani
SHRIRAM PARK
RAMBHOOMI DEVELOPERS LLP
Vakratund Annex
Vijayamrut Builders
The Reserve
BAGAD PROPERTIES
The Shivneri
Mahadevi Construction Co
QASRUL KHULAFA 3
Makani Buildcon
See every Nashik project, with the district possession charts
Builder: Bafna Realtors Pvt Ltd
Bafna Realtors Pvt Ltd has 8 registrations on MahaRERA, including Anmol Nayantara City Two phase 2 and Anmol Nayantara City One Phase 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Anmol Nayantara City One phase 4 is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Anmol Nayantara City One phase 4?
The registered promoter entity is Bafna Realtors Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Anmol Nayantara City One phase 4?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Anmol Nayantara City One phase 4?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Anmol Nayantara City One phase 4?
The professionals named in the filing: Architect: Shri Architect; Architect: Homework. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Anmol Nayantara City One phase 4?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback