ANJANI EXOTICA

By Narendra Jichkar

RG-MH-22956 · RERA P50500047229 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
21 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 95%
1 of 1Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

ANJANI EXOTICA is a Others project by Narendra Jichkar in Nagpur, Maharashtra, registered with MahaRERA as P50500047229 on 12 Oct 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 0 of the 1 unit on this registration is recorded sold or booked, and 21 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameANJANI EXOTICA
  • TypeOthers
  • Location
    • plot no-3
    • sector -22
    • Mihan
    • Khapri
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • RERA no.P50500047229
  • ReraGenie IDRG-MH-22956

Builder

  • NameNarendra Jichkar
  • Entity typeIndividual
  • Other registrations2 more →
  • Past their filed date2

Key dates

1 months past promisethis monthRegisteredOct 2022PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Oct 2022
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed114 files

Current status

0%0 of 1 units booked
65.5%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anjani Exotica Wing DNA2015101
Anjani Exotica Wing ENA1915000
Anjani Exotica Wing FNA1915000
Anjani Exotica CommercialNA54000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

Anjani Exotica Wing D67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Anjani Exotica Wing E68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Anjani Exotica Wing F68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Anjani Exotica Commercial75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed233

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots233
Closed/Covered4
Open Space229
BuildingClosed/CoveredOpen SpaceTotal
Anjani Exotica Wing D14546
Anjani Exotica Wing E13132
Anjani Exotica Wing F16061
Anjani Exotica Commercial19394

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,187 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMaharashtra Airport Development Company Ltd.
Permissible FSI46620.0
Proposed, not sanctioned24,332 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKingsway Nagpur
Estimated costRs 161.11 cr
Cost incurredRs 105.49 cr
Work done65.48%
BuildingWingEstimatedIncurred
Anjani Exotica Wing DNARs 80.56 crRs 14.20 cr
-NARs 80.56 crRs 62.81 cr
Anjani Exotica Wing ENA-Rs 13.11 cr
Anjani Exotica Wing FNA-Rs 14.84 cr
Anjani Exotica CommercialNA-Rs 52.38 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Prashant Satpute
ArchitectArch Prashant Satpute Satpute
EngineerEr Sanjay Singh
EngineerPurushottam Patankar
EngineerEr Sanjay Singh Singh
Chartered AccountantCA LALIT KHANDELWAL
Chartered AccountantSUSHIL CHANDWANI & CO.
PartnerRole in project
Narendra Purushottam Jichkar-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600434Mrinal KatkarNarendra Purushottam Jichkar25/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: FORM 5 LOGISTICS.pdf11 Jul 2026
Form 5 (FY 2023-2024)File: FORM 5-13-16.pdf29 May 2026
Form 5 (FY 2024-2025)File: FORM 5-5-8.pdf29 May 2026
Withdrawal Update Form 1File: FORM 1.pdf5 May 2026
Withdrawal Update Form 2File: FORM 2.pdf5 May 2026
Withdrawal Update Form 3File: FORM 3.pdf5 May 2026
Form 1File: FORM 1.pdf11 Mar 2026
Form 2File: FORM 2.pdf11 Mar 2026
Form 3File: FORM 3.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf11 Mar 2026
Form 1File: FORM 1.pdf11 Mar 2026
Form 2File: FORM 2.pdf11 Mar 2026
Form 3File: FORM 3.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf11 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf11 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf11 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf11 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf11 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf11 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf11 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf11 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf11 Mar 2026
Withdrawal Update Form 3File: FORM 3.pdf11 Mar 2026
Form 1File: FORM 1.pdf29 Jan 2026
Form 2File: FORM 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
Form 1File: FORM 1.pdf29 Jan 2026
Form 2File: FORM 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
Form 1File: form1.pdf29 Jan 2026
Form 2File: form 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
Form 1File: FORM 1.pdf29 Jan 2026
Form 2File: FORM 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
Form 1File: Form 1.pdf29 Jan 2026
Form 2File: FORM 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
Form 1File: FORM 1.pdf29 Jan 2026
Form 2File: FORM 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
Form 1File: FORM 1.pdf29 Jan 2026
Form 2File: FORM 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
Form 1File: FORM 1.pdf29 Jan 2026
Form 2File: FORM 2.pdf29 Jan 2026
Form 3File: FORM 3.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: FORM 3.pdf29 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ANJANI EXOTICA FORM 3.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch1 cerf def 0624.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch2 cerf def 0924.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cerf DEF 0624.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: enqq cerf def 0624.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cerf def 0924.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: d,e,f qtr 4 2023 (12).pdf8 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cerf phase1.pdf3 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 LOGISTICS.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cerf 4th quar.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cerf 5th quar.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg cerf 4th.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cerf 5th.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cerf 4th.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cerf 5.pdf15 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Sep Bank acc Phase 1.pdf15 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation allotment letter.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cerf C.pdf17 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cerf_DEC_2022.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cerf_March-2023.pdf18 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1st quater.pdf13 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd quatr.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DT-31-12-2022.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE DT- 31-03-2023.pdf13 May 2023

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANJANI EXOTICA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mihan2,800+ in Nagpur

Builder: Narendra Jichkar

Narendra Jichkar has 3 registrations on MahaRERA, including ANJANI EXOTICA and ANJANI EXOTICA 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if ANJANI EXOTICA is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANJANI EXOTICA?

The registered promoter entity is Narendra Jichkar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANJANI EXOTICA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANJANI EXOTICA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANJANI EXOTICA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANJANI EXOTICA?

The professionals named in the filing: Architect: Arch Prashant Satpute; Architect: Arch Prashant Satpute Satpute; Engineer: Er Sanjay Singh; Engineer: Purushottam Patankar; Engineer: Er Sanjay Singh Singh; Chartered Accountant: CA LALIT KHANDELWAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANJANI EXOTICA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANJANI EXOTICA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANJANI EXOTICA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.