Home / Browse projects / Raigarh, Maharashtra / Anjali Farms

Completed No litigation declared Plotted project

Anjali Farms

By Largior Developers Private limited

RG-MH-10684 · RERA P52000000530 · Last updated on MahaRERA portal: 31 Jan 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
13 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Anjali Farms is a Plotted project by Largior Developers Private limited in Raigarh, Maharashtra, registered with MahaRERA as P52000000530 on 18 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 3 of the 16 units on this registration are recorded sold or booked.

At a glance

Project

  • NameAnjali Farms
  • TypePlotted
  • Location
    • Adoshi
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000000530
  • ReraGenie IDRG-MH-10684

Builder

  • NameLargior Developers Private limited
  • Entity typeCompany
  • Managing DirectorsManish Gupta, Santosh Ukhalkar
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredJul 2017PromisedDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion30 Dec 2021
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed73 files

Current status

19%3 of 16 units booked

Figures as on 31 Jan 2023, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 31 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,698 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2411.25
Proposed, not sanctioned2,411 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHiranandani Gardens Powai

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwaroop Revankar
PartnerRole in project
Largior Developers Private limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 31 Jan 2023

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Anjali Certificate.pdf31 Jan 2023
Certificates of CA (Form 5)File: Largior Developers Anjali Farms.pdf5 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Largior Developers Anjali Farms.pdf5 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Anjali Farms_PDF.pdf9 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: Anjali Certificate.pdf22 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anjali Farms Arch Cer.pdf26 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anjali Eng Cer.pdf26 Feb 2021
Certificates of CA (Form 3)File: Anjali CA Cer.pdf26 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anjali Arch Cft.pdf18 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anjali Engr Cft.pdf18 Nov 2020
Certificates of CA (Form 3)File: Anjali Farm CA Cert.pdf18 Nov 2020
Certificates of CA (Form 5)File: Anajali Farms FORM V.pdf18 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Anajali Farms FORM V.pdf18 Nov 2020
Details of Restarting of Construction work post lockdownFile: Anjali Farms Post lock down.pdf2 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI FARMS ARCHI CERTI.pdf21 Apr 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI FARMS ENGI CERTI.pdf21 Apr 2020
Certificates of CA (Form 3)File: RERA CA CERT Anjali.pdf21 Apr 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHI CERTI.pdf18 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJAJI ENGI CERTI.pdf18 Jan 2020
Certificates of CA (Form 3)File: ANJALI CA CERT.pdf18 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHI CERTI.pdf20 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI ENGI CERTI.pdf20 Dec 2019
Certificates of CA (Form 3)File: ANJALI CA CERTI.pdf20 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ANJALI ANNUAL REPORT.pdf20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHI CERTI.pdf5 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI ENGI CERTI.pdf5 Sep 2019
Certificates of CA (Form 3)File: ANJALI CA CERTI.pdf5 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHI CERTI.pdf14 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI ENGI CERTI.pdf14 Jun 2019
Certificates of CA (Form 3)File: ANJALI CA CERTI.pdf14 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHI CERTI.pdf12 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI ENGI CERTI.pdf12 Feb 2019
Certificates of CA (Form 3)File: ANJALI CA CERTI.pdf12 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DYNAMIX ARCHI CERTI.pdf16 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHI CERTI.pdf16 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHI CERTI.pdf16 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DYNAMIX ENGI CERTI.pdf16 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI ENGI CERTI.pdf16 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI ENGI CERTI.pdf16 Nov 2018
Certificates of CA (Form 3)File: DYNAMIX CA CERTI.pdf16 Nov 2018
Certificates of CA (Form 3)File: ANJALI CA CERTI.pdf16 Nov 2018
Certificates of CA (Form 3)File: ANJALI CA CERTI.pdf16 Nov 2018
Certificates of CA (Form 5)File: ANJALI FORM 5.pdf16 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anjali Farms Arch Certificate.pdf16 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anjali Farms Engg Certificate.pdf16 Apr 2018
Certificates of CA (Form 3)File: Anjali Farms C A Certificate.pdf16 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anjali Arch Cert.pdf15 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anjali Engg Cert.pdf15 Jan 2018
Certificates of CA (Form 3)File: Anjali C A Certificate.pdf15 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anjali Architect Certi.pdf16 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anjali Engi Certi.pdf16 Oct 2017
Certificates of CA (Form 3)File: Anjali C A Certi.pdf16 Oct 2017
Layout approvalFile: ANJALI N A Order.pdf14 Jul 2017
Layout approvalFile: Anjali N A Plan.pdf14 Jul 2017
Building plan approval or NA orderFile: ANJALI DECLARATION.pdf14 Jul 2017
Building plan approval or NA orderFile: ANJALI N A Order.pdf14 Jul 2017
Building plan approval or NA orderFile: Anjali N A Plan.pdf14 Jul 2017
PAN CardFile: pAN cARD.pdf14 Jul 2017
Copy of the legal title reportFile: TC of Anjali Farms.pdf14 Jul 2017
Details of encumbrancesFile: Anjali Farms Encumbrance.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: ANJALI N A Order.pdf14 Jul 2017
Copy of Layout Approval (in case of layout)File: Anjali N A Plan.pdf14 Jul 2017
Building Plan Approval (IOD)File: ANJALI DECLARATION.pdf14 Jul 2017
Building Plan Approval (IOD)File: ANJALI N A Order.pdf14 Jul 2017
Building Plan Approval (IOD)File: Anjali N A Plan.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: ANJALI N A Order.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: ANJALI DECLARATION.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Anjali N A Plan.pdf14 Jul 2017
Declaration in FORM BFile: ANJALI AFFI AND DECLARATION.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANJALI ARCHITECTS Certificate.pdf14 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ANJALI ENGG CERTIFICATE.pdf14 Jul 2017
Certificates of CA (Form 3)File: ANJALI C A Certificate.pdf14 Jul 2017
Proforma of Allotment letterFile: Deed of Conveyance.pdf14 Jul 2017

How this compares with Raigarh

19%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anjali Farms on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Adoshi5,900+ in Raigarh

2 kmAnjali FarmsCompleted 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: Largior Developers Private limited

Largior Developers Private limited has 2 registrations on MahaRERA, including Anjali Farms and ANJ. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Anjali Farms is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anjali Farms?

The registered promoter entity is Largior Developers Private limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anjali Farms?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anjali Farms?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anjali Farms?

The professionals named in the filing: Architect: Swaroop Revankar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anjali Farms?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anjali Farms. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anjali Farms to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.