Home / Browse projects / Kolhapur, Maharashtra / Anita Pride

Completed No litigation declared Residential / Group Housing project

Anita Pride

By Girish Vasudev Joshi

RG-MH-27317 · RERA P53000032808 · Last updated on MahaRERA portal: 7 Jan 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Anita Pride is a Residential / Group Housing project by Girish Vasudev Joshi in Kolhapur, Maharashtra, registered with MahaRERA as P53000032808 on 29 Jan 2022. The registration is recorded completed; possession was promised by 29 Jun 2025. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameAnita Pride
  • TypeResidential / Group Housing
  • Location
    • Ujalaiwadi
    • Ujalaiwadi (CT)
    • Karvir
    • Kolhapur
    • 416004
  • Pincode416004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000032808
  • ReraGenie IDRG-MH-27317

Builder

  • NameGirish Vasudev Joshi
  • Entity typeIndividual
  • GSTIN27ACNPJ9408N1ZW
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2022First promiseJun 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jan 2022
  • Promised completion29 Jun 2025
  • Revised completionRevised to 29 Jun 2025 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Anita PrideNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

Anita Pride: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 7 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area536 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI1727.39
Proposed, not sanctioned1,256 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSiber Campus Kolhapur

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Square Architects Interior & Landscape Designers
EngineerEr Kiran Vishwanath Rawal Rawal
Chartered AccountantAradhana Baheti & co
Chartered AccountantNilesh Nandkumar Baheti
PartnerRole in project
Girish Vasudev Joshi-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53000024155Jun 2024 → Jun 2025

Reason as filed by the promoterMy real estate project is going on. But due to some technical reasons I haven’t been able to complete the project in the scheduled time. I would greatly appreciate and request MAHARERA authority to grant me further extension of One year.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jan 2025

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf7 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate premier developer.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Jul 2024
Declaration in FORM BFile: Form B Declaration.pdf1 Jul 2024
Declaration in FORM BFile: Form B Declaration.pdf28 Jun 2024
Building plan approvalFile: Scan_1.pdf3 May 2024
Building plan approvalFile: Scan_2.pdf3 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan_1.pdf3 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan_2.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A.pdf26 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold insold inventory.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Apr 2022.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 July 2022.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Oct 2022.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Jan 2023.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 July 2023.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Oct 2023.pdf9 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Apr2023.pdf9 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A March 2022.pdf9 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A March 2023.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: Sold declaration 1.pdf9 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf9 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23 Premier Dev.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-1-3.pdf2 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Premier Developers01192023.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Sold unsold inventary-Girish Joshi01192023.pdf20 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report Anita Pride.pdf2 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf25 Nov 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf25 Nov 2022
Layout approvalFile: Layout.pdf18 Jan 2022
Layout approvalFile: layout plan final.pdf18 Jan 2022
Layout approvalFile: Mojani Nakasha.pdf18 Jan 2022
Layout approvalFile: NA order_0001.pdf18 Jan 2022
Building plan approvalFile: scan15775.pdf18 Jan 2022
Building plan approvalFile: scan15776.pdf18 Jan 2022
PAN CardFile: PAN .pdf18 Jan 2022
Copy of the legal title reportFile: Legal Title Report.pdf18 Jan 2022
Copy of the legal title reportFile: Search Report.pdf18 Jan 2022
Details of encumbrancesFile: Details of encumbrances.pdf18 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf18 Jan 2022
Copy of Layout Approval (in case of layout)File: layout plan final.pdf18 Jan 2022
Copy of Layout Approval (in case of layout)File: Mojani Nakasha.pdf18 Jan 2022
Copy of Layout Approval (in case of layout)File: NA order_0001.pdf18 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: scan15775.pdf18 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: scan15776.pdf18 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf18 Jan 2022
Declaration about Commencement CertificateFile: Format D.pdf18 Jan 2022
Declaration in FORM BFile: Form B.pdf18 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate .pdf18 Jan 2022
CERSAI detailsFile: CERSAI.pdf18 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf18 Jan 2022
Proforma of Allotment letterFile: Agreement to sell.pdf18 Jan 2022
Proforma of Allotment letterFile: Allotmet letter .pdf18 Jan 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ANUSHA RESIDENCY56B-11 E Ward Rajendranagar Kolhapur22CompletedFeb 2016Feb 2016

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one moved by 12 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is completed

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep Anita Pride on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ujalaiwadi880+ in Kolhapur

2 kmAnita PrideCompleted 3Lapsed / revoked 5Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Girish Vasudev Joshi

Girish Vasudev Joshi has 2 registrations on MahaRERA, including VARUN HEIGHTS and Anita Pride. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if Anita Pride is delayed beyond 29 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anita Pride?

The registered promoter entity is Girish Vasudev Joshi, an individual as per the filing. Its GSTIN 27ACNPJ9408N1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anita Pride?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anita Pride?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anita Pride?

The professionals named in the filing: Architect: A Square Architects Interior & Landscape Designers; Engineer: Er Kiran Vishwanath Rawal Rawal; Chartered Accountant: Aradhana Baheti & co; Chartered Accountant: Nilesh Nandkumar Baheti. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anita Pride?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anita Pride. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anita Pride to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.