ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ANIRUDDHA POOJA

Registered No litigation declared Residential / Group Housing project

ANIRUDDHA POOJA

By ANIRUDDHA BUILDCON

RG-MH-06978 · RERA P51700054763 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Installation of Lifts, 80%
16 of 107Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

ANIRUDDHA POOJA is a Residential / Group Housing project by ANIRUDDHA BUILDCON in Thane, Maharashtra, registered with MahaRERA as P51700054763 on 12 Feb 2024. Possession is promised by 31 Dec 2026. 91 of the 107 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameANIRUDDHA POOJA
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 9
    • SEC-21 ULWE
    • Navi Mumbai (M Corp.)
    • Thane
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054763
  • ReraGenie IDRG-MH-06978

Builder

  • NameANIRUDDHA BUILDCON
  • Entity typePartnership
  • PartnersARJUN KRISHNARAO DESHMUKH, RAJESH CHANDRAKANT POL, RUPALI ANAND DANGAT
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredFeb 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

85%91 of 107 units booked
78.7%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANIRUDDHA POOJANA15121070107

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.

ANIRUDDHA POOJA: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.62%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered164

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,599 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on17 Jun 2025

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI6900.23
Proposed, not sanctioned6,900 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR-17,PALM BEACH ROAD, VASHI
Estimated costRs 22.76 cr
Cost incurredRs 17.91 cr
Work done78.67%
BuildingWingEstimatedIncurred
ANIRUDDHA POOJANARs 20.86 crRs 17.56 cr
-NARs 1.90 crRs 34.20 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVASTOPATI DESIGN GROUP
EngineerAGHARKAR CONSULTANTS
EngineerBIPIN MAURTA
Chartered AccountantNIRAV M HARIA AND CO
Chartered AccountantSUSHANT NARAYANRAO ALME
PartnerRole in project
ANIRUDDHA BUILDCON-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400072SANTOSH SHAMRAO KATEANIRUDDHA BUILDCON10/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ ANIRUDDHA POOJA.pdf30 Apr 2026
Withdrawal Update Form 2File: FORM 2_MARCH 26_ ANIRUDDHA POOJA.pdf30 Apr 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ ANIRUDDHA POOJA.pdf30 Apr 2026
Withdrawal Update Form 1File: FORM 1_ DEC 25_ ANIRUDDHA POOJA.pdf27 Feb 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ ANIRUDDHA POOJA.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ ANIRUDDHA POOJA.pdf27 Feb 2026
Withdrawal Update Form 1File: FORM 1_ SEP 25_ ANIRUDDHA POOJA.pdf2 Jan 2026
Withdrawal Update Form 2File: FORM 2_ SEP 25_ ANIRUDDHA POOJA.pdf2 Jan 2026
Withdrawal Update Form 3File: FORM 3_ SEP 25_ ANIRUDDHA POOJA (1).pdf2 Jan 2026
Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_ ANIRUDDHA POOJA.pdf2 Jan 2026
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ ANIRUDDHA POOJA.pdf17 Jul 2025
Withdrawal Update Form 1File: FORM 1_ JUNE 25_ ANIRUDDHA POOJA.pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ ANIRUDDHA POOJA.pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2_ JUNE 25_ ANIRUDDHA POOJA.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3_ MARCH 25_ ANIRUDDHA POOJA_compressed.pdf17 Jul 2025
Withdrawal Update Form 3File: FORM 3_ JUNE 25_ ANIRUDDHA POOJA_compressed.pdf17 Jul 2025
Form 1File: FORM 1_ SEP 24.pdf17 Jun 2025
Form 2File: FORM 2_ SEP 24.pdf17 Jun 2025
Form 3File: FORM 3_ SEP 24_ ANIRUDDHA POOJA_compressed.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 24.pdf17 Jun 2025
Form 1File: FORM 1_ DEC 24.pdf17 Jun 2025
Form 2File: FORM 2_ DEC 24.pdf17 Jun 2025
Form 3File: FORM 3_ DEC 24_ ANIRUDDHA POOJA_compressed.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold & Unsold List 31-12-2024.pdf17 Jun 2025
Form 1File: FORM 1_ MARCH 25_ ANIRUDDHA BUILDCON_ ANIRUDDHA POOJA.pdf17 Jun 2025
Form 2File: FORM 2_ MARCH 25_ ANIRUDDHA BUILDCON_ ANIRUDDHA POOJA.pdf17 Jun 2025
Form 3File: FORM 3_ MARCH 25_ ANIRUDDHA POOJA_compressed.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ ANIRUDDHA BUILDCON_ ANIRUDDHA POOJA.pdf17 Jun 2025
Withdrawal Update Form 1File: FORM 1_ MARCH 25_ ANIRUDDHA BUILDCON_ ANIRUDDHA POOJA.pdf17 Jun 2025
Withdrawal Update Form 2File: FORM 2_ MARCH 25_ ANIRUDDHA BUILDCON_ ANIRUDDHA POOJA.pdf17 Jun 2025
Withdrawal Update Form 3File: FORM 3_ MARCH 25_ ANIRUDDHA POOJA_compressed.pdf17 Jun 2025
Proforma of Agreement for saleFile: AFS.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_MARCH 24.pdf30 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1_JUNE 24.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2_MARCH 24.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FORM 2_JUNE 24.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: 7 SOLD UNSOLD_MARCH 24.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: 8 SOLD UNSOLD_ JUNE 24.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 FORM 3_ MARCH 24.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 FORM 3_ JUNE 24_compressed.pdf30 Jul 2024
Proforma of Agreement for saleFile: ANIRUDHA POOAJ.pdf15 Mar 2024
Declaration about Commencement CertificateFile: cc.pdf8 Feb 2024
Proforma of Agreement for saleFile: afs.pdf5 Feb 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION.pdf5 Feb 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (1).pdf13 Jan 2024
Building plan approvalFile: 4-2.pdf13 Jan 2024
Building plan approvalFile: 4-3.pdf13 Jan 2024
Building plan approvalFile: 4-4.pdf13 Jan 2024
Building plan approvalFile: 4-5.pdf13 Jan 2024
Building plan approvalFile: 4-6.pdf13 Jan 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (1).pdf13 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-2.pdf13 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-3.pdf13 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-4.pdf13 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-5.pdf13 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-6.pdf13 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC MAIL.pdf13 Jan 2024
Other - LegalFile: 2 Copy of the legal title report.pdf13 Jan 2024
Copy of the legal title reportFile: MAHARERA.pdf18 Dec 2023
Copy of the legal title reportFile: 3 Copy of the legal title report.pdf25 Nov 2023
Copy of the legal title reportFile: 2 Copy of the legal title report.pdf25 Nov 2023
Copy of the legal title reportFile: 1 Copy of the legal title report.pdf25 Nov 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate .pdf25 Nov 2023
Details of encumbrances concerned to FinanceFile: Encumbrance certificate.pdf2 Nov 2023
Details of encumbrances concerned to LegalFile: Encumbrance certificate.pdf2 Nov 2023
CERSAI detailsFile: Self Declaration Regarding CRESAI Report.pdf2 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Mr Rajesh Pol Disclosre of interest.pdf2 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Mrs Rupali Dangat Disclosure Of Interest.pdf2 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: Aniruddha Buildcon CC.pdf31 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real estate organizations .pdf31 Oct 2023
Proforma of Allotment letterFile: RERA- Allottment-Letter-Aniruddha-Pooja-Ulwe (1).pdf31 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format - A (1) Separate Bank Account.pdf31 Oct 2023
Deviation Report with respect to Allotment letterFile: Declaration on Deviation in Allotment Letter.pdf31 Oct 2023
PAN CardFile: Aniruddha BuildCon Pan Card 000338.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 ANI.pdf30 Oct 2023

How this compares with Thane

85%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANIRUDDHA POOJA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SEC-21 ULWE7,600+ in Thane

2 kmANIRUDDHA POOJACompleted 88Lapsed / revoked 28Other 90Dot size: filed unitsN

Filed coordinates, straight-line distance. 206 registered projects within 2 km.

Builder: ANIRUDDHA BUILDCON

Aniruddha Buildcon has 2 registrations on MahaRERA, including Aniruddha Buildcon and ANIRUDDHA POOJA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ANIRUDDHA POOJA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANIRUDDHA POOJA?

The registered promoter entity is ANIRUDDHA BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANIRUDDHA POOJA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANIRUDDHA POOJA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANIRUDDHA POOJA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANIRUDDHA POOJA?

The professionals named in the filing: Architect: VASTOPATI DESIGN GROUP; Engineer: AGHARKAR CONSULTANTS; Engineer: BIPIN MAURTA; Chartered Accountant: NIRAV M HARIA AND CO; Chartered Accountant: SUSHANT NARAYANRAO ALME. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANIRUDDHA POOJA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANIRUDDHA POOJA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANIRUDDHA POOJA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.