ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Aneesh Apartment Co.op. Housing Soc. Ltd.

Registered No litigation declared Residential / Group Housing project

Aneesh Apartment Co.op. Housing Soc. Ltd.

By Banaji Silverline Developers LLP

RG-MH-18320 · RERA P51800056463 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 95%
11 of 23Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Aneesh Apartment Co.op. Housing Soc. Ltd. is a Residential / Group Housing project by Banaji Silverline Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056463 on 5 Jun 2024. Possession is promised by 31 Dec 2027. 12 of the 23 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAneesh Apartment Co.op. Housing Soc. Ltd.
  • TypeResidential / Group Housing
  • Location
    • Azad Lane
    • Andheri West
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • RERA no.P51800056463
  • ReraGenie IDRG-MH-18320

Builder

  • NameBanaji Silverline Developers LLP
  • Entity typePartnership
  • PartnersJamshed Dady Banaji, Nirmala Jamshed Banaji

Key dates

this monthRegisteredJun 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

52%12 of 23 units booked
73.0%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aneesh SilverlineNA9923023

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Aneesh Silverline: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area695 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Declared on20 Aug 2025
LandownerVillageDistrict
Aneesh Apartment Co-operative Housing Society LtdGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2780.0
Proposed, not sanctioned2,027 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 1 SION TROMBAY ROAD, HOTEL BAHRI RESIDENCY, DIAMOND GARDEN, CHEMBUR
Estimated costRs 24.67 cr
Cost incurredRs 18.00 cr
Work done72.98%
BuildingWingEstimatedIncurred
Aneesh SilverlineNARs 21.58 crRs 12.74 cr
-NARs 3.09 crRs 5.26 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKaushal Chouhan
EngineerFahad Bhati
EngineerWAHAJ MOHAMMED SHAIKH
Chartered AccountantBilimoria Mehta & Co
Chartered AccountantShyam Prajapati
PartnerRole in project
Banaji Silverline Developers LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 Architect Certificate 31 03 2026.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf8 Jun 2026
Withdrawal Update Form 3File: Final FORM 3.pdf8 Jun 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31 12 2025.pdf16 Feb 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate.pdf16 Feb 2026
Withdrawal Update Form 3File: Form - 3 CA Certificate.pdf16 Feb 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30 09 2025.pdf12 Nov 2025
Withdrawal Update Form 2File: Form-2 Engineer Certificate 14-7-25.pdf12 Nov 2025
Withdrawal Update Form 3File: FORM 3 CERTIFICATE 30-09-2025 SIGNED.pdf12 Nov 2025
Form 1File: Form1 Architect Certificate.pdf17 Jul 2025
Form 2File: Form-2 Engineer Certificate.pdf17 Jul 2025
Form 3File: Form 3 CA Certificate.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Units Sold.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31 03 2025.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 CA Certificate 19-4-25.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 7-04-25.pdf6 May 2025
Disclosure of sold/ booked inventoryFile: LH disclosure of sold booked units.pdf6 May 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Certificate on L-H.pdf7 Feb 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance Certificate on L-H.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31 12 2024_.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Estimate Cost Details.pdf3 Feb 2025
Disclosure of sold/ booked inventoryFile: LH disclosure of sold booked units.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31 12 2024_compressed.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 21-1-25.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 2024 FORM 3.pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 2024 FORM 3.pdf3 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf3 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: ilovepdf_merged (1).pdf3 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: ilovepdf_merged (1).pdf3 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised_FORM_3_RERA_CERTIFCIATE_SEPT_2024_Q2_Signed.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 30-9-2024.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Certificate.pdf8 Aug 2024
CERSAI detailsFile: CERSAI.pdf31 May 2024
Other - LegalFile: FORM B1.pdf31 May 2024
Layout approvalFile: Sanction Plan .pdf15 May 2024
Building plan approvalFile: Sanction Plan .pdf15 May 2024
Copy of the legal title reportFile: Legal title report_compressed (1).pdf15 May 2024
Copy of Layout Approval (in case of layout)File: Sanction Plan .pdf15 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan .pdf15 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances to Finance 22042024.pdf14 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Other Legal 22042024.pdf14 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrances to Finance 22042024.pdf14 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Other Legal 22042024.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 14052024.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30042024 compressed.pdf14 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf14 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement For Sale_compressed.pdf14 May 2024
PAN CardFile: PAN Card Banaji Silverline Developers LLP.pdf13 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 19032024.pdf13 May 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate 22042024.pdf13 May 2024
Declaration in FORM BFile: FORM B1.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30042024.pdf13 May 2024
CERSAI detailsFile: CERSAI Undertaking 22042024.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Jamshed Banaji 24042024.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Nirmala Banaji 13052024.pdf13 May 2024
Proforma of Agreement for saleFile: Agreement For Sale-Draft 13052024 Final.pdf13 May 2024
Proforma of Allotment letterFile: Proforma Allotment Letter 13052024 Final.pdf13 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Ac 22042024.pdf13 May 2024
Other - LegalFile: IOD 06022024.pdf13 May 2024
Other - TechnicalFile: Annexure A Declaration Cum Undertaking 22042024.pdf13 May 2024

How this compares with Mumbai Suburban

52%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Aneesh Apartment Co.op. Housing Soc. Ltd. on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri West6,700+ in Mumbai Suburban

Builder: Banaji Silverline Developers LLP

Banaji Silverline Developers LLP has 1 registration on MahaRERA, including Aneesh Apartment Co.op. Housing Soc. Ltd.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Aneesh Apartment Co.op. Housing Soc. Ltd. is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Aneesh Apartment Co.op. Housing Soc. Ltd.?

The registered promoter entity is Banaji Silverline Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Aneesh Apartment Co.op. Housing Soc. Ltd.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Aneesh Apartment Co.op. Housing Soc. Ltd.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Aneesh Apartment Co.op. Housing Soc. Ltd.?

The professionals named in the filing: Architect: Kaushal Chouhan; Engineer: Fahad Bhati; Engineer: WAHAJ MOHAMMED SHAIKH; Chartered Accountant: Bilimoria Mehta & Co; Chartered Accountant: Shyam Prajapati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aneesh Apartment Co.op. Housing Soc. Ltd.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aneesh Apartment Co.op. Housing Soc. Ltd.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aneesh Apartment Co.op. Housing Soc. Ltd. to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.