ANDHERI INDIRA NAGAR CHS LIMITED
RG-MH-66465 · RERA P51800014152 · Last updated on MahaRERA portal: 10 Jan 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 28 months past the filed date
- 7 complaints at MahaRERA
- Completion date moved by 66 months
- 6 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ANDHERI INDIRA NAGAR CHS LIMITED is a Others project by JASPAL SINGH SURI in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014152 on 9 Nov 2017. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 66 months from the original filing. 7 complaints are on record with the regulator.
At a glance
Project
- NameANDHERI INDIRA NAGAR CHS LIMITED
- TypeOthers
- Location
- J.P. Road
- Andheri West
- Andheri
- Mumbai Suburban
- 400058
- Pincode400058
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800014152
- ReraGenie IDRG-MH-66465
Builder
- NameJASPAL SINGH SURI
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Nov 2017
- Promised completion30 Jun 2024
- Revised completionRevised to 30 Jun 2024 (originally 31 Dec 2018)
- Buildings2 building records
- Documents filed54 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ANDHERI INDIRA NAGAR CHS LIMITED WING B | NA | 8 | 0 | 0 | 0 | 0 |
| ANDHERI INDIRA NAGAR CHS LIMITED WING C | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 10 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
ANDHERI INDIRA NAGAR CHS LIMITED WING B90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
ANDHERI INDIRA NAGAR CHS LIMITED WING C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AARYA LIFESTYLE LLP |
| Engineer | MOHILE AND ASSOCIATES |
| Chartered Accountant | Sudhanshu Shekhar Singh |
| Partner | Role in project |
|---|---|
| JASPAL SINGH SURI | - |
Extensions applied for6
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Madam, Commercial project 100% completed - Occupation Certificate (OC) applied. Residential project 90% completed and expected to be completed in 1-2 months. The marginal delay is due to heavy increase in cost of construction and funding and recovery issues. Delay in getting few compliance's and non availability of specific materials.
Reason as filed by the promoterDue to global pandemic all over the world (Outbreak of coronavirus), and lockdown in maharashtra, many construction labours left the city and also non-availability of construction materials we were not able to complete the project in due time and therefore we request you to kindly extend the period of registration till 30.06.2022.
Reason as filed by the promoterCertain eligibility of slum dwellers had been received with revised supplementary Annexure II from Competent Authority (MHADA) .As such the developer had to obtain revised LOI and amended plan with further CC from SRA. The application with respect to the same was filed with SRA by the developer about 1 year back. The revised LOI with amended plan and further CC has been received by the developer on 25th October, 2018. Hence, the completion date for the project is extended from 31st December, 2018 to 31st October, 2019.
Reason as filed by the promoterAs it is SRA project, some permissions were delayed.
Reason as filed by the promoterWe have applied for the OC with the appropriate authority which is under process. At the time of hearing with RERA authority for delay in completion of project, we had given the reason for delay in OC and it was instructed to make an application for extension of project and to do the arrangements for OC at the earliest possible.
Reason as filed by the promoterWe have applied for OC with the appropriate authority which is under process. At the time of hearing with RERA authority, we were instructed to make an application for extension. Hence, we are hereby applying for extension till 30/09/2023
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000079229 | Bela Agarwal | Jaspal Singh | 09/05/2019 |
| CC006000000078507 | Mrs Mona Gupta | M/s Kanwal Corporation Builders and Developers | 18/03/2019 |
| CC006000000100384 | Manjit Singh Garkel | Jaspal Singh Suri | 06/08/2019 |
| CC006000000100386 | Renu Aghi | Jaspal Singh Suri | 06/08/2019 |
| CC006000000197033 | FAROOQ ANSARI | KANWAL CORPORATION | 24/05/2021 |
| CC006000000197034 | WAHIDA ANSARI | KANWAL CORPORATION BUILDERS & DEVELOPERS | 24/05/2021 |
| CC006000000292479 | Bela Suresh Agarwal | Jaspal SIngh Suri | 28/08/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Jun 2023
Documents filed54
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration in FORM BFile: Affidavit Cum Declaration.pdf | 10 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Agreed and Accepted- Form 5.pdf | 10 Jan 2024 |
| Declaration in FORM BFile: Form B_Affidavit.pdf | 28 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 28 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A.pdf | 28 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf | 28 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 28 Jun 2023 |
| Certificates of CA (Form 5)File: Form 5.pdf | 28 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ocupation Certificate_C Wing.pdf | 26 Jun 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate_C Wing.pdf | 24 Mar 2023 |
| Layout approvalFile: Layout Plan.pdf | 23 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 23 Feb 2023 |
| Proforma of Agreement for saleFile: Proforma Agreement for sale.pdf | 13 Feb 2023 |
| Declaration about Commencement CertificateFile: Form D-Declaration about CC.pdf | 31 Dec 2022 |
| Declaration in FORM BFile: Form B RERA_2022.pdf | 31 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 RERA_2022.pdf | 31 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM-2A RERA_2021-22.pdf | 31 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold booked Inventory_2022.pdf | 31 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3 RERA.pdf | 31 Dec 2022 |
| Certificates of CA (Form 5)File: Form5_2020-21.pdf | 31 Dec 2022 |
| Certificates of CA (Form 5)File: Form5_2021-22.pdf | 31 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5_2020-21.pdf | 31 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5_2021-22.pdf | 31 Dec 2022 |
| OtherFile: Intimation letter for formation of society.pdf | 8 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Kanwal.pdf | 26 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_Kanwal.pdf | 26 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED UNSOLD INVENTORY AS ON 17TH JULY 2021.pdf | 17 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA CERTIFICATE_FORM 5.pdf | 17 Jul 2021 |
| Declaration about Commencement CertificateFile: Declaration for CC.pdf | 10 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Booked Inventory.pdf | 10 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5_Kanwal_Mukesh_ 2018-19.pdf | 10 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_KANWAL CORPORATION.pdf | 10 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3_Kanwal Corporation.pdf | 30 Jan 2020 |
| Certificates of CA (Form 5)File: Form 5_2018-19_Kanwal Corporation.pdf | 30 Jan 2020 |
| OtherFile: Architect Certificate.pdf | 24 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate andheri indira nagar.pdf | 23 Jan 2020 |
| Building plan approvalFile: IOD.pdf | 30 Oct 2018 |
| Building Plan Approval (IOD)File: IOD.pdf | 30 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 30 Oct 2018 |
| OtherFile: Revised LOI.pdf | 30 Oct 2018 |
| Certificates of CA (Form 5)File: FORM 5_ KANWAL CORPORATION.pdf | 30 Sep 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE_KANWAL CORPORATION.pdf | 21 Apr 2018 |
| Building plan approvalFile: Intimation of Approval.pdf | 12 Aug 2017 |
| Layout approvalFile: Commencement Certificate.pdf | 12 Aug 2017 |
| PAN CardFile: PAN.pdf | 12 Aug 2017 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 12 Aug 2017 |
| Details of encumbrancesFile: No Encumbrances Certificate.pdf | 12 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Commencement Certificate.pdf | 12 Aug 2017 |
| Building Plan Approval (IOD)File: Intimation of Approval.pdf | 12 Aug 2017 |
| Declaration in FORM BFile: FORM B Affidavit cum declaration rev.pdf | 12 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Indiranagar CHSL FINAL.pdf | 12 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Indiranagar.pdf | 12 Aug 2017 |
| Certificates of CA (Form 3)File: CA CERTIFICATE_FORM 3.pdf | 12 Aug 2017 |
| Proforma of Allotment letterFile: Allotment Letter and Agreement for Sale.pdf | 12 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 54 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ANDHERI INDIRA NAGAR CHS LIMITED on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Andheri West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 271 registered projects within 2 km.
PEARL UNIVERSE
CHANDIWALA ENTERPRISES PRIVATE LIMITED
PRANAMI BLISS
Pranami Neev Realty Limited
Alpine Primo
ALPINE INFRAHEIGHTS LLP
NAMAN HABITAT
SHREE NAMAN DEVELOPERS PVT LTD
Vantage
Rolland Spaces Private Limited
Nasar Enclave Sale Building A and B Wing
M/s. Nasar Associates
See every Mumbai Suburban project, with the district possession charts
Builder: JASPAL SINGH SURI
JASPAL SINGH SURI has 1 registration on MahaRERA, including ANDHERI INDIRA NAGAR CHS LIMITED. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that ANDHERI INDIRA NAGAR CHS LIMITED shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ANDHERI INDIRA NAGAR CHS LIMITED is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ANDHERI INDIRA NAGAR CHS LIMITED?
The registered promoter entity is JASPAL SINGH SURI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ANDHERI INDIRA NAGAR CHS LIMITED?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ANDHERI INDIRA NAGAR CHS LIMITED?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ANDHERI INDIRA NAGAR CHS LIMITED?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ANDHERI INDIRA NAGAR CHS LIMITED?
The professionals named in the filing: Architect: AARYA LIFESTYLE LLP; Engineer: MOHILE AND ASSOCIATES; Chartered Accountant: Sudhanshu Shekhar Singh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ANDHERI INDIRA NAGAR CHS LIMITED?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.