Ananta C By Thakkers

By Shiv Agro Farms

RG-MH-14967 · RERA P51600034216 · Last updated on MahaRERA portal: 29 Jan 2026

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
0 of 11Construction stages donefurthest along: Excavation, 0%
20 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Ananta C By Thakkers is a Residential / Group Housing project by Shiv Agro Farms in Nashik, Maharashtra, registered with MahaRERA as P51600034216 on 25 Mar 2022. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 0 of the 20 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameAnanta C By Thakkers
  • TypeResidential / Group Housing
  • Location
    • Makhamalabad Road
    • Makhamalabad
    • Nashik
    • Nashik (M Corp.)
    • Nashik
    • 422003
  • Pincode422003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600034216
  • ReraGenie IDRG-MH-14967

Builder

  • NameShiv Agro Farms
  • Entity typeOthers
  • Named personsThakker Nishant Rajendra, Rajendra Manohardas Thakker, Chetan G Batavia, M R Thakker & Co Construction Pvt Ltd
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredMar 2022PromisedJun 2025

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on25 Mar 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Current status

0%0 of 20 units booked

Figures as on 29 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ananta C By ThakkersNA6520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Ananta C By Thakkers: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area595 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jan 2026

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI1690.51
Proposed, not sanctioned1,691 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 9 To 13, Agora, Canada Corner, Junction Of Sharanpur And College Road Nashik

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPDP Architects
EngineerSudarshan Anawade
EngineerArun Marathe
Chartered AccountantParesh Sabadra
Chartered AccountantP N SABADRA & ASSOCIATES
Chartered AccountantRSPH & Associates
PartnerRole in project
Shiv Agro Farms-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Ananta C Architects Certificate.pdf29 Jan 2026
Form 2File: Ananta C Engineers Certificate.pdf29 Jan 2026
Form 3File: CA Certificate C Final.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Ananta C Disclosure of Sold - Booked inventory.pdf29 Jan 2026
Form 1File: Architect Certificate Ananta C-DEC-2024.pdf29 Jan 2026
Form 2File: Engineer Certificate Ananta C-DEC-2024.pdf29 Jan 2026
Form 3File: CA CERTIFICATE ANANTA C -DEC-24.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Discolosure Sold Inventory Ananta C.pdf29 Jan 2026
Form 1File: Architect Certificate Ananta C-SEP-24.pdf29 Jan 2026
Form 2File: Engineer Certificate Ananta C.pdf29 Jan 2026
Form 3File: CA Certificate Ananta C Sept 24 final.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Ananta C By Thakkers.pdf29 Jan 2026
Form 1File: Architects Certificate - Ananta C.pdf29 Jan 2026
Form 2File: Ananta - C ENGINEERS CERTIFICATE.pdf29 Jan 2026
Form 3File: CA CERTIFICATE Ananata C.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory - Ananta C By Thakkers (2).pdf29 Jan 2026
Form 1File: Ananta C- Architect Certificate Signed Copy.pdf29 Jan 2026
Form 2File: Ananta -C- Engineering Certificate Signed Copy.pdf29 Jan 2026
Form 3File: CA Certificate- Ananta C Signed Copy.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosue March 24.pdf29 Jan 2026
Form 1File: Architect Dec 23.pdf29 Jan 2026
Form 2File: Engineer Certificates Dec 23.pdf29 Jan 2026
Form 3File: CA CertificateDec 23pdf.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 23.pdf29 Jan 2026
Form 5 (FY 2023-2024)File: ANANTA-C-CA-Certificate-FY-2023-24.pdf29 Jan 2026
Form 1File: AR - June 25 - Ananta C.pdf7 Jan 2026
Form 2File: ER - June 25 - Ananta C.pdf7 Jan 2026
Form 3File: CA - June 25 - Ananta C final.pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - June 25 - Ananta C.pdf7 Jan 2026
Form 5 (FY 2024-2025)File: RERA Audit Report_24-25_Ananta C final.pdf6 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ananta C Architect's Certificate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate C Final.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ananta C Engineer's Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Ananta C Disclosure of Sold - Booked inventory.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Ananta C Disclosure of Sold - Booked inventory.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Discolosure Sold Inventory Ananta C.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Ananta C-DEC-2024_compressed.pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE ANANTA C -DEC-24_compressed.pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Ananta C-DEC-2024.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Ananta C-SEP-24.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: edited_CA Certificate Ananta C.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Ananta C.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Ananta C By Thakkers.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Ananta C By Thakkers.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: ANANTA-C-CA-Certificate-FY-2023-24.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate - Ananta C.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ananta - C ENGINEERS CERTIFICATE.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Ananata C.pdf20 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Ananta C By Thakkers (2).pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ananta C- Architect Certificate Signed Copy.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ananta -C- Engineering Certificate Signed Copy.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Ananta C Signed Copy.pdf19 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory - Aanta C.pdf13 Apr 2024
Other - TechnicalFile: Quality Asurance Certifcate - Ananta -C.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Ananta C.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate - Ananta C.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY ANANTA C BY THAKKERS.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ananta C Arch Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Ananta C.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shiv Agro-CA Certificate_Ananta C 30 09 23.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit_Ananta C_22 23_Signed.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ananta C AR Certificate Jun'23.pdf28 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ananta C ER Certificate Jun'23.pdf28 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ananta C CA certificate Jun'23.pdf28 Jul 2023
Disclosure of sold/ booked inventoryFile: Shiv Agro (Form 2) 2.pdf15 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ananta C.pdf24 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Ananta C (1).pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE ANANTA C.pdf9 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA-ANNUAL REPORT OF STATEMENT OF ACCOUNT-ANANTA-C.pdf22 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Cert Ananta C.pdf22 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert Ananta C.pdf22 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Ananta C signed.pdf22 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shiv Agro C_compressed.pdf18 Mar 2022
Proforma of Allotment letterFile: Agreement for Sale.pdf4 Mar 2022
Layout approvalFile: Plan 01.pdf4 Feb 2022
Layout approvalFile: Plan 02.pdf4 Feb 2022
Building plan approvalFile: Plan 01.pdf4 Feb 2022
Building plan approvalFile: Plan 02.pdf4 Feb 2022
PAN CardFile: Pan Card_Shiv Agro Farms.pdf4 Feb 2022

How this compares with Nashik

0%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ananta C By Thakkers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Makhamalabad, Nashik4,100+ in Nashik

2 kmAnanta C By ThakkersCompleted 44Lapsed / revoked 14Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 102 registered projects within 2 km.

Builder: Shiv Agro Farms

Shiv Agro Farms has 2 registrations on MahaRERA, including Ananta B By Thakkers and Ananta C By Thakkers. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that Ananta C By Thakkers shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ananta C By Thakkers is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ananta C By Thakkers?

The registered promoter entity is Shiv Agro Farms, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ananta C By Thakkers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ananta C By Thakkers?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ananta C By Thakkers?

The professionals named in the filing: Architect: PDP Architects; Engineer: Sudarshan Anawade; Engineer: Arun Marathe; Chartered Accountant: Paresh Sabadra; Chartered Accountant: P N SABADRA & ASSOCIATES; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ananta C By Thakkers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ananta C By Thakkers. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ananta C By Thakkers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.