ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Anant Sapphire

Completed No litigation declared Residential / Group Housing project

Anant Sapphire

By Anant Realty

RG-MH-73885 · RERA P52000017134 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Anant Sapphire is a Residential / Group Housing project by Anant Realty in Raigarh, Maharashtra, registered with MahaRERA as P52000017134 on 16 Jul 2018. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameAnant Sapphire
  • TypeResidential / Group Housing
  • Location
    • Adai
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000017134
  • ReraGenie IDRG-MH-73885

Builder

  • NameAnant Realty
  • Entity typePartnership
  • PartnersBHIKHABHAI RANCHOD MADAT, JITESH PRAMOD AGRAWAL
  • Other registrations3 more →
  • Completed3 of 4

Key dates

this monthRegisteredJul 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Jul 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building 1NA60000
Building 2NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building 291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68
BuildingClosed/CoveredTotal
Building 13636
Building 23232

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3097.22
Proposed, not sanctioned3,097 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW PANVEL EAST Panvel 410206

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwapnil Kalyankar Architects
PartnerRole in project
Anant Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Aug 2022

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5).pdf12 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Sapphire Form 4.pdf26 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Anant Sapphire Oc.pdf17 Aug 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Anant Sapphire Registration Certificate.pdf17 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire March 2022.pdf26 Jul 2022
Certificates of CA (Form 3)File: Form 3 Anant Sapphire March 2022_compressed.pdf26 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire Sept 2021_compressed.pdf28 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire Decemeber 2021.pdf28 Mar 2022
CERSAI detailsFile: Anant Sapphire.pdf28 Mar 2022
Certificates of CA (Form 3)File: Form 3 Anant Sapphire Sept 2021_compressed.pdf28 Mar 2022
Certificates of CA (Form 3)File: Form 3 Anant Sapphire Dec 2021_compressed.pdf28 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire June 21.pdf1 Sep 2021
Certificates of CA (Form 3)File: Form 3 Anant Sapphire June 2021.pdf1 Sep 2021
Disclosure of sold/ booked inventoryFile: Anant Sapphire.pdf11 Aug 2021
Declaration about Commencement CertificateFile: Anant Sapphire D.pdf9 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ANANT SAPPHIRE MARCH 2021.pdf21 Jun 2021
Certificates of CA (Form 3)File: Form 3 Anant Sapphire Mar 2021.pdf21 Jun 2021
Certificates of CA (Form 3)File: Form 3 Anant Sapphire Dec 2020.pdf21 Jun 2021
Building plan approvalFile: signed dwg Stamped_BP-260_Amm1_compressed_1-1.pdf7 Apr 2021
Building plan approvalFile: SodaPDF-compressed-signed dwg Stamped_BP-260_Amm1_compressed_2-3_reduce.pdf7 Apr 2021
Building plan approvalFile: SodaPDF-compressed-signed dwg Stamped_BP-260_Amm1_compressed_4-end_reduce (1).pdf7 Apr 2021
Building Plan Approval (IOD)File: signed dwg Stamped_BP-260_Amm1_compressed_1-1.pdf7 Apr 2021
Building Plan Approval (IOD)File: SodaPDF-compressed-signed dwg Stamped_BP-260_Amm1_compressed_2-3_reduce.pdf7 Apr 2021
Building Plan Approval (IOD)File: SodaPDF-compressed-signed dwg Stamped_BP-260_Amm1_compressed_4-end_reduce (1).pdf7 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Signed ACCBP-260_CCLetter.pdf7 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire Sept 2020_compressed.pdf25 Nov 2020
Certificates of CA (Form 3)File: Form 3 Anant Sapphire Sept 2020_compressed.pdf25 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ANANT_SAPPHIRE.pdf9 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Saphhire 30th June 2020.pdf22 Jul 2020
Certificates of CA (Form 3)File: Form 3 Anant Sapphire 30th June 2020.pdf22 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 Anant sapphire.pdf10 Jun 2020
Certificates of CA (Form 3)File: Form 3 Anant Sapphire.pdf27 May 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire.pdf21 Jan 2020
Certificates of CA (Form 3)File: Form 3 Anant Sapphire_compressed.pdf21 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire.pdf1 Nov 2019
Certificates of CA (Form 3)File: Form-3 Anant Sapphire.pdf1 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Anant Sapphire.pdf12 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anant Sapphire (1).pdf13 Jul 2019
Certificates of CA (Form 3)File: Form 3 Anant Sapphire.pdf13 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 anant sapphire.pdf30 May 2019
Certificates of CA (Form 3)File: form 3 - anant sapphire.pdf30 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anant sapphire form 2-compressed.pdf18 Jan 2019
Certificates of CA (Form 3)File: Anant sapphire form 3 .pdf18 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anant Sapphire Form 1.pdf7 Jan 2019
Building plan approvalFile: 5.pdf11 Jul 2018
Building Plan Approval (IOD)File: 5.pdf11 Jul 2018
Proforma of Allotment letterFile: proforma_sapphire.pdf10 Jul 2018
Building plan approvalFile: 3.pdf9 Jul 2018
Building Plan Approval (IOD)File: 3.pdf9 Jul 2018
Declaration in FORM BFile: formb.pdf9 Jul 2018
Layout approvalFile: 1.pdf6 Jul 2018
Building plan approvalFile: 2.pdf6 Jul 2018
Building plan approvalFile: 4.pdf6 Jul 2018
PAN CardFile: anant_pan.pdf6 Jul 2018
Copy of the legal title reportFile: title.pdf6 Jul 2018
Details of encumbrancesFile: encumbrances.pdf6 Jul 2018
Copy of Layout Approval (in case of layout)File: 1.pdf6 Jul 2018
Building Plan Approval (IOD)File: 2.pdf6 Jul 2018
Building Plan Approval (IOD)File: 4.pdf6 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: CC_Final.pdf6 Jul 2018
Certificates of CA (Form 3)File: CA.pdf6 Jul 2018

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Anant Sapphire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Adai5,900+ in Raigarh

2 kmAnant SapphireCompleted 37Lapsed / revoked 14Other 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 92 registered projects within 2 km.

Builder: Anant Realty

Anant Realty has 4 registrations on MahaRERA, including Anant Greens Phase I and Anant Ganesha. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Anant Sapphire is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Anant Sapphire?

The registered promoter entity is Anant Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Anant Sapphire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Anant Sapphire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Anant Sapphire?

The professionals named in the filing: Architect: Swapnil Kalyankar Architects. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Anant Sapphire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Anant Sapphire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Anant Sapphire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.